NPDES FLR20JH85 · Clean Water Act
COOLIDGE STREET UTILITY IMPROVEMENTS, Eustis, FL: NPDES FLR20JH85 discharge permit, effluent exceedances, inspections, penalties
COOLIDGE STREET UTILITY IMPROVEMENTS, Eustis, Florida: General permit coverage FLR20JH85, held by GPS Civil Construction; Construction stormwater; Effective; issued June 5, 2026, term to June 4, 2031, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 14,465 were issued before FLR20JH85. GPS Civil Construction holds 8 permits in Florida.
Other permits held by GPS Civil Construction
- SPRING TO SPRING PHASE 3C, Debary: FLR10YG58, issued 2026-02-19
- LIFT STATION 22 FORCE MAIN REPLACEMENT, Daytona Beach: FLR20GT47, issued 2023-11-09
- BUCKINGHAM DRIVE EXFILTRATION SYSTEM, Ormond Beach: FLR20HH09, issued 2024-06-03
- SAWMILL CREEK SELF STORAGE, Palm Coast: FLR20HI30, issued 2024-06-22
- DAYTONA BEACH INTERNATIONAL AIRPORT, Daytona Beach: FLR20HU98, issued 2025-01-06
- ROUNDABOUT AT PIONEER TRAIL AND TOMOKA FARMS ROAD, New Smyrna Beach: FLR20IO81, issued 2025-09-13
- PARKS RECREATION AND CULTURAL WORKSHOP AND STORAGE, Daytona Beach: FLR20JA34, issued 2026-02-27
Coverages issued nearest FLR20JH85
- 2026-06-05: VERO LAKE ESTATES - BOWMAN HOMES, Vero Beach: FLR10YN31, held by PBS National Inc - Bowman Homes
- 2026-06-05: ARTHREX AVE MARIA, Ave Maria: FLR10YN32, held by Waltbillig Hood General Contractors
- 2026-06-05: BRIGHTON-JACARANDA (LOT 129), Venice: FLR10YN33, held by NVR dba Ryan Homes
- 2026-06-05: HCA FLORIDA PALMS HOSPITAL WEST PALM BEACH FSER, West Palm Beach: FLR10YN35, held by Schmid Construction
- 2026-06-05: KITTEN TRAIL SIDEWALK, Hudson: FLR10YN37, held by BRW Contracting Inc
- 2026-06-05: OCEANS UNITE CHRISTIAN CENTRE, Vero Beach: FLR20JH86, held by JWG Land Solutions
- 2026-06-05: CFRC AMD55, Lake Mary: FLR20JH87, held by Kiewit Infrastructure South Co.
- 2026-06-05: HARVEST POINTE NORTH, Rockledge: FLR20JH88, held by DR Horton Inc
- 2026-06-05: BEACH DR. NORTH SHORE DR. WATERMAIN REPLACEMENT, Saint Petersburg: FLR20JH89, held by Ric-Man Construction Florida
- 2026-06-05: POINCIANA EXCHANGE, Kissimmee: FLR20JH90, held by JW2 Development, LLC
COOLIDGE STREET UTILITY IMPROVEMENTS among its neighbors
30 discharge permits are in the Lake Bracy subwatershed (HUC 030801020401); FLR20JH85 is one. Its county: 389, 0 major; FLR20JH85 is minor permit.
Other permits in the Lake Bracy subwatershed (HUC 030801020401)
- 7-ELEVEN EUSTIS STORE NUMBER 42347, Eustis: FLR20HK25, minor, term to 2029-07-19
- 7ELEVEN ORANGE AVE EUSTIS, Eustis: FLR20HN70, minor, term to 2029-09-06
- CITY OF UMATILLA GENERAL AVIATION TERMINAL BUILDING, Umatilla: FLR10VL89, minor, term to 2027-09-25
- COOLIDGE STREET UTILITY IMPROVEMENTS, Eustis: FLR20GU99, minor, term to 2028-12-03
- DAIRY QUEEN EUSTIS, Eustis: FLR10YK96, minor, term to 2031-04-24
- EAST LAKE JOANNA WATER QUALITY IMPROVEMENTS, Eustis: FLR20FA17, minor, term to 2026-12-15
- ESTES RESERVE, Eustis: FLR10WW41, minor, term to 2029-06-08
- ESTES RESERVE, Eustis: FLR10XR19, minor, term to 2030-05-16
- EUSTIS ACE HARDWARE, Eustis: FLR10VE77, minor, term to 2027-05-18
- EUSTIS ACE HARDWARE, Eustis: FLR10VG39, minor, term to 2027-06-19
What stands out
- Its term runs 4 years and 364 days, June 5, 2026 to June 4, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | COOLIDGE STREET UTILITY IMPROVEMENTS |
|---|---|
| Permittee | GPS Civil Construction |
| NPDES ID | FLR20JH85 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 5, 2026 |
| Expires | June 4, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Eustis, FL 32726 |
| Subwatershed | Lake Bracy (HUC 030801020401) |
NPDES FLR20JH85: effluent limits and exceedances
COOLIDGE STREET UTILITY IMPROVEMENTS (NPDES FLR20JH85): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20JH85: no pollutant row on file.
NPDES FLR20JH85: inspections, violations and enforcement
NPDES FLR20JH85 (COOLIDGE STREET UTILITY IMPROVEMENTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20JH85
NPDES FLR20JH85: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20JH85
NPDES FLR20JH85: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.