NPDES FLR20JJ50 · Clean Water Act
INDIAN RIVER ESTATES - S-1 TO S-2, Fort Pierce, FL: NPDES FLR20JJ50 discharge permit, effluent exceedances, inspections, penalties
INDIAN RIVER ESTATES - S-1 TO S-2, Fort Pierce, Florida: General permit coverage FLR20JJ50, held by Johnson-Davis, Inc.; Construction stormwater; Effective; issued June 26, 2026, term to June 25, 2031, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 14,738 were issued before FLR20JJ50. Johnson-Davis, Inc. holds 11 permits in Florida.
Other permits held by Johnson-Davis, Inc.
- 10TH AVE. - 13TH AVE. STORMWATER IMPROVEMENTS, Lake Worth: FLR10YN54, issued 2026-06-08
- CONGRESS OVER L 24 CANAL, Boynton Beach: FLR20HC51, issued 2024-03-31
- RIVER PARK BAFFLE BOX, Port Saint Lucie: FLR20HT99, issued 2024-12-16
- ORANGE AVE. CULVERTS, Fort Pierce: FLR20IH21, issued 2025-06-02
- A1A FORCEMAIN TOWN OF MANALAPAN, Manalapan: FLR20IJ47, issued 2025-07-03
- INDIALANTIC STORMWATER, Indialantic: FLR20IS78, issued 2025-11-08
- RIVIERA GARDENIA, Sebastian: FLR20IV39, issued 2025-12-17
- INVERRARY BLVD., Sunrise: FLR20IV64, issued 2025-12-20
- INDIALANTIC DRAINAGE PHASE 1A, Indialantic: FLR20JH54, issued 2026-05-30
- INDIALANTIC STORMWATER PHASE 2, Indialantic: FLR20JK82, issued 2026-07-16
Coverages issued nearest FLR20JJ50
- 2026-06-26: 2200 GORDON DRIVE LAND TRUST, Naples: FLR20JJ45, held by BJ Excavating Enterprises, Inc.
- 2026-06-26: STOTAN INDUSTRIAL WEST, Titusville: FLR20JJ46, held by Stotan Industrial West
- 2026-06-26: CR 393 NB RIGHT TURNLANE, Santa Rosa Beach: FLR20JJ47, held by CWR Contracting, Inc.
- 2026-06-26: STOTAN INDUSTRIAL EAST, Titusville: FLR20JJ48, held by Stotan Industrial East
- 2026-06-26: THE SANCTUARY AT SEAIRE, Parrish: FLR20JJ49, held by Park Square Homes
- 2026-06-26: MAGNOLIA CENTER, Tampa: FLR20JJ51, held by Vertical Earth, Inc.
- 2026-06-26: UNIVERSAL STUDIOS P-519, Orlando: FLR20JJ52, held by Southern Development Construction, Inc
- 2026-06-26: HARBOUR LOGISTICS CENTER, Melbourne: FLR20JJ53, held by RYAN INC SOUTHERN
- 2026-06-26: VILLAGES OF AMELIA - PHASE 2A, Yulee: FLR20JJ54, held by Terra Grade, LLC
- 2026-06-26: DEERING PARK PHASE 1-2, Edgewater: FLR20JJ55, held by Hazen Construction
Other permits in Fort Pierce
- 1679 THUMB POINT DR DRAINAGE REPLACEMENT, Fort Pierce: FLR20IN69, minor, term to 2030-08-29
- 21-512 - KRE - ROW G, Fort Pierce: FLR10XU46, minor, term to 2030-07-11
- 2650 S KINGS HIGHWAY DEVELOPMENT, Fort Pierce: FLR10VH18, minor, term to 2027-06-25
- 360 ENERGY SOLUTIONS, Fort Pierce: FLG074548, minor, term to 2030-07-31
- 360 ENERGY SOLUTIONS, Fort Pierce: FLR10XV44, minor, term to 2030-07-25
- 3800 CROSSROADS, Fort Pierce: FLR10VE54, minor, term to 2027-05-12
- 6701 SALERNO RD, Fort Pierce: FLR20IL05, minor, term to 2030-07-27
- 7-11 42157, Fort Pierce: FLR20GE58, minor, term to 2028-04-08
- 7038-1009 WM DC, Fort Pierce: FLR10YM16, minor, term to 2031-05-14
- A & A AUTO SALVAGE INC, Fort Pierce: FLR05G261, minor, term to 2026-07-24
What stands out
- Its term runs 4 years and 364 days, June 26, 2026 to June 25, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | INDIAN RIVER ESTATES - S-1 TO S-2 |
|---|---|
| Permittee | Johnson-Davis, Inc. |
| NPDES ID | FLR20JJ50 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 26, 2026 |
| Expires | June 25, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Fort Pierce, FL 34982 |
NPDES FLR20JJ50: effluent limits and exceedances
INDIAN RIVER ESTATES - S-1 TO S-2 (NPDES FLR20JJ50): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20JJ50: no pollutant row on file.
NPDES FLR20JJ50: inspections, violations and enforcement
NPDES FLR20JJ50 (INDIAN RIVER ESTATES - S-1 TO S-2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20JJ50
NPDES FLR20JJ50: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20JJ50
NPDES FLR20JJ50: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.