NPDES FLR20JN28 · Clean Water Act
PINECONE SOLAR ENERGY CENTER, Altha, FL: NPDES FLR20JN28 discharge permit, effluent exceedances, inspections, penalties
PINECONE SOLAR ENERGY CENTER, Altha, Florida: General permit coverage FLR20JN28, held by Moss Associates, LLC; Construction stormwater; Effective; issued August 22, 2026, term to August 21, 2031, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 15,412 were issued before FLR20JN28. Moss Associates, LLC holds 13 permits in Florida.
Other permits held by Moss Associates, LLC
- TURNPIKE SOLAR, Kenansville: FLR10YC88, issued 2025-12-13
- LONESOME CAMP SOLAR, Kenansville: FLR10YH15, issued 2026-02-26
- INDRIO SOLAR SITE, Fort Pierce: FLR10YI73, issued 2026-03-23
- HENDRY SOLAR ENERGY CENTER, Clewiston: FLR10YI77, issued 2026-03-23
- TANGELO SOLAR ENERGY CENTER, Okeechobee: FLR10YI78, issued 2026-03-23
- TERRILL CREEK SOLAR ENERGY CENTER, Green Cove Springs: FLR10YL88, issued 2026-05-09
- BLUE HERON BESS, Clewiston: FLR10YM39, issued 2026-05-18
- SWAMP CABBAGE BESS, Clewiston: FLR10YM40, issued 2026-05-20
- FOREST TRAIL SOLAR ENERGY CENTER, Jacksonville: FLR20IR52, issued 2025-10-18
- WOODSTORK SOLAR ENERGY CENTER, Okeechobee: FLR20JC34, issued 2026-03-22
Coverages issued nearest FLR20JN28
- 2026-08-22: THE PINE SCHOOL - WEST FIELD, Hobe Sound: FLR10YR73, held by SCG Fields, LLC
- 2026-08-22: DALFAN INDUSTRIAL, Apopka: FLR20JN21, held by BWC Construction
- 2026-08-22: LAKE BUTLER PS #5, Lake Butler: FLR20JN25, held by MI Contractors, Inc.
- 2026-08-22: L544 CANTONMENT, Cantonment: FLR20JN26, held by Chavers Construction Inc
- 2026-08-22: 26TH ST. AND POINSETTIA AVE, West Palm Beach: FLR20JN27, held by Hinterland Group Inc.
- 2026-08-22: THE SATORI, Pompano Beach: FLR20JN29, held by 4211 N Fed LLC
- 2026-08-22: NEWPORT CORNERS PARK, New Port Richey: FLR20JN30, held by Ripa Associates LLC
- 2026-08-22: MCKENDREE WM EXTENSION, San Antonio: FLR20JN31, held by Ripa Associates LLC
- 2026-08-22: CRYSTAL LAKE IMPROVEMENT, Chipley: FLR20JN32, held by Roberts and Roberts, Inc.
- 2026-08-22: T1813 US41, Sarasota: FLR20JN33, held by Superior Asphalt, Inc
Other permits in Altha
- CHIPOLA RIVER SOLAR ENERGY FACILITY, Altha: FLG073270, minor, term to 2027-01-04
- IRON DOG, INC., Altha: FLR05I450, minor, term to 2024-11-03
- SR 274 TEN MILE CREEK BRIDGE, Altha: FLR20JH93, minor, term to 2031-06-05
- TENMILE CREEK SOLAR, Altha: FLR10XG50, minor, term to 2029-11-21
What stands out
- Its term runs 4 years and 364 days, August 22, 2026 to August 21, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PINECONE SOLAR ENERGY CENTER |
|---|---|
| Permittee | Moss Associates, LLC |
| NPDES ID | FLR20JN28 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 22, 2026 |
| Expires | August 21, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Altha, FL 32421 |
NPDES FLR20JN28: effluent limits and exceedances
PINECONE SOLAR ENERGY CENTER (NPDES FLR20JN28): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20JN28: no pollutant row on file.
NPDES FLR20JN28: inspections, violations and enforcement
NPDES FLR20JN28 (PINECONE SOLAR ENERGY CENTER): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20JN28
NPDES FLR20JN28: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20JN28
NPDES FLR20JN28: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.