GEORGIA POWER COMPANY (FLINT RIVER HYDROELECTRIC PLANT), Albany, GA: NPDES GA0001546 discharge permit, effluent exceedances, inspections, penalties

GEORGIA POWER COMPANY (FLINT RIVER HYDROELECTRIC PLANT), Albany, Georgia: Individual permit GA0001546, held by Georgia Power Company; Administratively continued; issued September 28, 2018, term to September 30, 2023.

  • Flow, in conduit or thru treatment plant: 0 limits, 26 violations of any kind.

Other permits held by Georgia Power Company

GEORGIA POWER COMPANY (FLINT RIVER HYDROELECTRIC PLANT) among its neighbors

82 discharge permits are in the Upper Lake Blackshear subwatershed (HUC 031300060602); GA0001546 is one. Its county: 31, 3 major; GA0001546 is minor permit.

Other permits in the Upper Lake Blackshear subwatershed (HUC 031300060602)

What stands out

  • Its term runs 5 years and 2 days, September 28, 2018 to September 30, 2023; the term ended 1,081 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 45,725 discharge permits on the register in Georgia; the file names no program for it, and it is a minor discharger.

Identity

FacilityGEORGIA POWER COMPANY (FLINT RIVER HYDROELECTRIC PLANT)
PermitteeGeorgia Power Company
NPDES IDGA0001546
StatusAdministratively continued
TypeIndividual permit
ClassMinor
Facility typeNon-POTW
IssuedSeptember 28, 2018
ExpiresSeptember 30, 2023
AddressAlbany, GA 31701
SubwatershedUpper Lake Blackshear (HUC 031300060602)
Other EPA IDs (FRS)RCRA handler GAD000612390

NPDES GA0001546: effluent limits and exceedances

GEORGIA POWER COMPANY (FLINT RIVER HYDROELECTRIC PLANT) (NPDES GA0001546): 1 pollutants on file, 0 limited; 1 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Flow, in conduit or thru treatment plant0260

NPDES GA0001546: inspections, violations and enforcement

NPDES GA0001546 (GEORGIA POWER COMPANY (FLINT RIVER HYDROELECTRIC PLANT)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES GA0001546

NPDES GA0001546: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES GA0001546

NPDES GA0001546: 1 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.