NPDES GAR150117 · Clean Water Act
FAITH TEMPLE FIRST PENTACOSTAL CHURCH, INC., Lithonia, GA: NPDES GAR150117 discharge permit, effluent exceedances, inspections, penalties
FAITH TEMPLE FIRST PENTACOSTAL CHURCH, INC., Lithonia, Georgia: General permit coverage GAR150117, held by Faith Temple First Pentacostal Church, Inc.; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR150117.
Coverages issued nearest GAR150117
- 2013-09-23: PREFERRED PARK (CHATHAM COUNTY), Garden City: GAR150110, held by Tim Jones
- 2013-09-23: HOME DEPOT #105 PARKING REHABILITATION, Duluth: GAR150111, held by The Home Depot U.S.A., Inc.
- 2013-09-23: MARKET PLACE AT SUGAR HILL FKA VILLAGE SHOPPES OF SUGAR HILL - LA FITNESS, Sugar Hill: GAR150112, held by Georgia Highway 20 Associates, LLC
- 2013-09-23: 11390 BOWEN ROAD, Roswell: GAR150114, held by Davis Construction Group, Inc.
- 2013-09-23: WHITTLESEY NORTHWEST, Columbus: GAR150116, held by Whittlesey Northwest, LLC
- 2013-09-23: DALTON 116 COMPRESSOR STATION, Whitesburg: GAR150118, held by Williams Transco
- 2013-09-23: ERNIE DENARD POULTRY HOUSES - 249 CAMPBELL ROAD, Tignall: GAR150119, held by Ernie Denard
- 2013-09-23: SHERWIN WILLIAMS - 930 SHERWIN PARKWAY, Buford: GAR150120, held by SHWDC Georgia Portfolio LP
- 2013-09-23: PEBBLEBROOK AT PARK SPRINGS: GAR150122, held by Park Springs, LLC
- 2013-09-23: POLLO TROPICAL, Mcdonough: GAR150123, held by Fiesta Restaurant Group
FAITH TEMPLE FIRST PENTACOSTAL CHURCH, INC. among its neighbors
163 discharge permits are in the Pole Bridge Creek-South River subwatershed (HUC 030701030105); GAR150117 is one.
Other permits in the Pole Bridge Creek-South River subwatershed (HUC 030701030105)
- 0 COOK DRIVE, Ellenwood: GAR397272, minor, term to 2028-07-31
- 413 SAINT SURREY WAY, Ellenwood: GAR18C18D, minor, term to 2028-07-31
- 5432 HEARN RD, Ellenwood: GAR18B3B5, minor, term to 2028-07-31
- 6215 HIGHWAY 155 NORTH, Stockbridge: GAR18BE3C, minor, term to 2028-07-31
- ADDISON GLEN LOT 1, N/A: GAR368864, minor, term to 2018-07-31
- AMP ROBOTICS, Lithonia: GAIS14502, minor, term to 2027-05-31
- CENTURY COOMMUNTIES - LOT 98, Unknown: GAR365205, minor, term to 2018-07-31
- CHAPEL RIDGE, Ellenwood: GAR18B39E, minor, term to 2028-07-31
- CHAPEL RIDGE ESTATES LOT 75, Ellenwood: GAR39591B, minor, term to 2028-07-31
- CHAPEL RIDGE ESTATES UNIT 2 LOT 61, Ellenwood: GAR395919, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FAITH TEMPLE FIRST PENTACOSTAL CHURCH, INC. |
|---|---|
| Permittee | Faith Temple First Pentacostal Church, Inc. |
| NPDES ID | GAR150117 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | Lithonia, GA 30038 |
| Subwatershed | Pole Bridge Creek-South River (HUC 030701030105) |
NPDES GAR150117: effluent limits and exceedances
FAITH TEMPLE FIRST PENTACOSTAL CHURCH, INC. (NPDES GAR150117): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR150117: no pollutant row on file.
NPDES GAR150117: inspections, violations and enforcement
NPDES GAR150117 (FAITH TEMPLE FIRST PENTACOSTAL CHURCH, INC.): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR150117
NPDES GAR150117: one email when its EPA record changes — $99/month.
Permits near NPDES GAR150117
NPDES GAR150117: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.