Velarion Records
Free: one email when NPDES GAR150298 changes. Unsubscribe any time.

NPDES GAR150298 · Clean Water Act

EATONTON SOLAR FARM - GRADING (FKA EATONTON SOLAR SITE), Eatonton, GA: NPDES GAR150298 discharge permit, effluent exceedances, inspections, penalties

EATONTON SOLAR FARM - GRADING (FKA EATONTON SOLAR SITE), Eatonton, Georgia: General permit coverage GAR150298, held by Tri-County Electric Membership Corp.; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.

Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR150298.

Coverages issued nearest GAR150298

EATONTON SOLAR FARM - GRADING (FKA EATONTON SOLAR SITE) among its neighbors

8 discharge permits are in the Reece Branch-Little River subwatershed (HUC 030701011503); GAR150298 is one.

Other permits in the Reece Branch-Little River subwatershed (HUC 030701011503)

What stands out

  • Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityEATONTON SOLAR FARM - GRADING (FKA EATONTON SOLAR SITE)
PermitteeTri-County Electric Membership Corp.
NPDES IDGAR150298
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedSeptember 23, 2013
ExpiresJuly 31, 2018
AddressEatonton, GA 31024
SubwatershedReece Branch-Little River (HUC 030701011503)

NPDES GAR150298: effluent limits and exceedances

EATONTON SOLAR FARM - GRADING (FKA EATONTON SOLAR SITE) (NPDES GAR150298): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES GAR150298: no pollutant row on file.

NPDES GAR150298: inspections, violations and enforcement

NPDES GAR150298 (EATONTON SOLAR FARM - GRADING (FKA EATONTON SOLAR SITE)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES GAR150298

NPDES GAR150298: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES GAR150298

NPDES GAR150298: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.