NPDES GAR150658 · Clean Water Act
PROPOSED WAREHOUSE STORAGE BUILDING, GA: NPDES GAR150658 discharge permit, effluent exceedances, inspections, penalties
PROPOSED WAREHOUSE STORAGE BUILDING, Georgia: General permit coverage GAR150658, held by Georgia Gulf Sulfur Corporation; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR150658.
Coverages issued nearest GAR150658
- 2013-09-23: RESURGENS CENTER EAST PHASE II, Covington: GAR150650, held by DVN II, LLC - Diagnostic Ventures of Newton
- 2013-09-23: RACETRAC - DELK, Marietta: GAR150652, held by Mesquite Creek Development
- 2013-09-23: JAMES SIMPSON PROPERTIES, LP, Gainesville: GAR150654, held by JAMES SIMPSON
- 2013-09-23: BLACKMON RETAIL CENTER, Columbus: GAR150655, held by Blackmon Village Center, LLC
- 2013-09-23: CORDELE INTERMODAL SERVICES YARD: GAR150656, held by Crisp County-Cordele Industrial Development Authority
- 2013-09-23: JOINER CROSSING, Grovetown: GAR150660, held by Joiner Crossing, LLC
- 2013-09-23: SITE GROUNDS LAYDOWN AREA, Columbus: GAR150661
- 2013-09-23: PARADISE CAR WASH, Dallas: GAR150662, held by Stephen Keys
- 2013-09-23: POWDER SPRINGS PAVILION: GAR150663, held by Columbia Properties, Inc.
- 2013-09-23: GRIFFIN BORROW PIT, Na: GAR150664, held by Andy Hancock
PROPOSED WAREHOUSE STORAGE BUILDING among its neighbors
11 discharge permits are in the Flint River-Lake Seminole subwatershed (HUC 031300080801); GAR150658 is one.
Other permits in the Flint River-Lake Seminole subwatershed (HUC 031300080801)
- CITY OF BAINBRIDGE, Bainbridge: GAL024678, minor, term to 2025-12-31
- CONNECTION CHURCH BAINBRIDGE, Bainbridge: GAR18B64D, minor, term to 2028-07-31
- EXPRESS OIL CHANGE, Bainbridge: GAR18BE9B, minor, term to 2028-07-31
- HALLWAY STORAGE FACILITY, Bainbridge: GAR18B3CC, minor, term to 2028-07-31
- LUNA MANUFACTURING FACILITY, Bainbridge: GAR153CAA, minor, term to 2018-07-31
- PUBLIX AT BAINBRIDGE CROSSING, Bainbridge: GAR18AF22, minor, term to 2025-01-31
- SOUTHERN ELECTRIC MOTORWORKS LLC, Bainbridge: GAR18C08B, minor, term to 2028-07-31
- SOUTHGATE SUBDIVISION, Bainbridge: GAR396E7D, minor, term to 2028-07-31
- SOUTHGATE SUBDIVISION TOWNHOMES, Bainbridge: GAR18B6A5, minor, term to 2028-07-31
- UNIVERSAL ENVIRONMENTAL SERVICES, LLC, Bainbridge: GAIS14409, minor, term to 2027-05-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PROPOSED WAREHOUSE STORAGE BUILDING |
|---|---|
| Permittee | Georgia Gulf Sulfur Corporation |
| NPDES ID | GAR150658 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | GA |
| Subwatershed | Flint River-Lake Seminole (HUC 031300080801) |
NPDES GAR150658: effluent limits and exceedances
PROPOSED WAREHOUSE STORAGE BUILDING (NPDES GAR150658): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR150658: no pollutant row on file.
NPDES GAR150658: inspections, violations and enforcement
NPDES GAR150658 (PROPOSED WAREHOUSE STORAGE BUILDING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR150658
NPDES GAR150658: one email when its EPA record changes — $99/month.
Permits near NPDES GAR150658
NPDES GAR150658: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.