NPDES GAR151031 · Clean Water Act

ASH LANDFILL PHASE 2, GA: NPDES GAR151031 discharge permit, effluent exceedances, inspections, penalties

ASH LANDFILL PHASE 2, Georgia: General permit coverage GAR151031, held by Georgia-Pacific Cedar Springs Operations; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.

Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR151031. Georgia-Pacific Cedar Springs Operations holds 2 permits in Georgia.

Other permits held by Georgia-Pacific Cedar Springs Operations

Coverages issued nearest GAR151031

ASH LANDFILL PHASE 2 among its neighbors

4 discharge permits are in the Woods Branch-Chattahoochee River subwatershed (HUC 031300040703); GAR151031 is one. Its county: 83, 6 major; GAR151031 is minor permit.

Other permits in the Woods Branch-Chattahoochee River subwatershed (HUC 031300040703)

What stands out

  • Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityASH LANDFILL PHASE 2
PermitteeGeorgia-Pacific Cedar Springs Operations
NPDES IDGAR151031
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedSeptember 23, 2013
ExpiresJuly 31, 2018
AddressGA
SubwatershedWoods Branch-Chattahoochee River (HUC 031300040703)

NPDES GAR151031: effluent limits and exceedances

ASH LANDFILL PHASE 2 (NPDES GAR151031): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES GAR151031: no pollutant row on file.

NPDES GAR151031: inspections, violations and enforcement

NPDES GAR151031 (ASH LANDFILL PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES GAR151031

NPDES GAR151031: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES GAR151031

NPDES GAR151031: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.