NPDES GAR152937 · Clean Water Act
NEWTON BAPTIST CHURCH ADDITION, GA: NPDES GAR152937 discharge permit, effluent exceedances, inspections, penalties
NEWTON BAPTIST CHURCH ADDITION, Georgia: General permit coverage GAR152937; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR152937.
Coverages issued nearest GAR152937
- 2013-09-23: RACETRAC - CHURCH AND VANN (MARIETTA), Marietta: GAR152930, held by RACETRAC PETROLEUM, INC.
- 2013-09-23: ANIMAL SHELTER (DALTON), Dalton: GAR152932, held by Humane Society of Northwest Georgia
- 2013-09-23: OAKLAND HEIGHTS BAPTIST CHURCH PARKING ADDITION, Cartersville: GAR152934, held by Oakland Heights Baptist Church
- 2013-09-23: H16314 BRIGHT STAR RD. PROJECT, Douglasville: GAR152935, held by SL Bright Star LLC
- 2013-09-23: PHILLIPS RESIDENCE: GAR152936, held by David Phillips
- 2013-09-23: COLONEL'S ISLAND TERMINAL SOUTHSIDE - EARTHWORK PHASE 3: PARCEL K (GLYNN COUNTY): GAR152939, held by GEORGIA PORTS AUTHORITY
- 2013-09-23: PHILLIPS HORNSBY FARMS, INC. INERT LANDFILL CLOSURE: GAR152940, held by Phillip Hornsby c/o Bill Burke
- 2013-09-23: SUPERIOR LANDFILL & RECYCLING CENTER - CELL 10B CONSTRUCTION DRAWINGS (CHATHAM C, Savannah: GAR152941, held by Terry Darragh
- 2013-09-23: NEW SANCTUARY BUILDING FAITH CHRISTIAN CENTER, Austell: GAR152942, held by Word of Faith Christian Center Church
- 2013-09-23: COOL RIVER ALPINE COASTER, Helen: GAR152944, held by American Sites, Inc.
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,997 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NEWTON BAPTIST CHURCH ADDITION |
|---|---|
| Permittee | UNK |
| NPDES ID | GAR152937 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | GA |
NPDES GAR152937: effluent limits and exceedances
NEWTON BAPTIST CHURCH ADDITION (NPDES GAR152937): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR152937: no pollutant row on file.
NPDES GAR152937: inspections, violations and enforcement
NPDES GAR152937 (NEWTON BAPTIST CHURCH ADDITION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR152937
NPDES GAR152937: one email when its EPA record changes — $99/month.
Permits near NPDES GAR152937
NPDES GAR152937: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.