NPDES GAR152948 · Clean Water Act
KADEL DUCK POND, Doerun, GA: NPDES GAR152948 discharge permit, effluent exceedances, inspections, penalties
KADEL DUCK POND, Doerun, Georgia: General permit coverage GAR152948, held by Kadel Investment Partners, LLP; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018; Other Heavy and Civil Engineering Construction.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR152948.
Coverages issued nearest GAR152948
- 2013-09-23: SUPERIOR LANDFILL & RECYCLING CENTER - CELL 10B CONSTRUCTION DRAWINGS (CHATHAM C, Savannah: GAR152941, held by Terry Darragh
- 2013-09-23: NEW SANCTUARY BUILDING FAITH CHRISTIAN CENTER, Austell: GAR152942, held by Word of Faith Christian Center Church
- 2013-09-23: COOL RIVER ALPINE COASTER, Helen: GAR152944, held by American Sites, Inc.
- 2013-09-23: RINGGOLD MIDDLE/HIGH SCHOOL BALLFIELDS, Ringgold: GAR152945, held by Catoosa County Board of Education
- 2013-09-23: FOY EVANS INDUSTRIAL PARK- LOT 27, Warner Robins: GAR152946
- 2013-09-23: COOK INDUSTRIAL ELECTRIC: GAR152949, held by Cook Industrial Electric
- 2013-09-23: RELIGIOUS DEVELOPMENT FOR I.A.C.S. OF SOUTH GA, INC.: GAR152950, held by INDO American Cultural Society of South Georgia, Inc.
- 2013-09-23: LIGHT HOUSE HARBOR WORSHIP CENTER, Tifton: GAR152951, held by PTC Ministries, Inc.
- 2013-09-23: VALDOSTA PRISON SOLAR ARRAY: GAR152952, held by HANNAH SOLAR
- 2013-09-23: MCHENRY SQUARE APARTMENTS: GAR152954, held by TCA, LLC
KADEL DUCK POND among its neighbors
2 discharge permits are in the Upper Racoon Creek subwatershed (HUC 031300080201); GAR152948 is one.
Other permits in the Upper Racoon Creek subwatershed (HUC 031300080201)
- GDOT SOIL CEMENT BORROW PIT, Bridgeboro: GAR18B279, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,997 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | KADEL DUCK POND |
|---|---|
| Permittee | Kadel Investment Partners, LLP |
| NPDES ID | GAR152948 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | Doerun, GA 31744 |
| Subwatershed | Upper Racoon Creek (HUC 031300080201) |
| NAICS | 237990 – Other Heavy and Civil Engineering Construction |
| SIC | 1629 – Heavy Construction |
NPDES GAR152948: effluent limits and exceedances
KADEL DUCK POND (NPDES GAR152948): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR152948: no pollutant row on file.
NPDES GAR152948: inspections, violations and enforcement
NPDES GAR152948 (KADEL DUCK POND): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR152948
NPDES GAR152948: one email when its EPA record changes — $99/month.
Permits near NPDES GAR152948
NPDES GAR152948: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.