Clean Water Act discharge permit · NPDES GAR18AE05
MAPLE HILL C&D LANDFILL - CELL NO. 5 CONSTRUCTION, Albany, GA: NPDES GAR18AE05 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
MAPLE HILL C&D LANDFILL - CELL NO. 5 CONSTRUCTION, held by James Melton, holds NPDES permit GAR18AE05. EPA’s file records it issued August 1, 2018 and expiring January 31, 2025. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for MAPLE HILL C&D LANDFILL - CELL NO. 5 CONSTRUCTION: its NPDES ID, its permit type and status, its dates, its address in Albany, Georgia. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES GAR18AE05.
What stands out
- Its term runs 6 years and 183 days, August 1, 2018 to January 31, 2025; the term ended 621 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | MAPLE HILL C&D LANDFILL - CELL NO. 5 CONSTRUCTION |
|---|---|
| Permittee as filed | James Melton |
| NPDES ID | GAR18AE05 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | August 1, 2018 |
| Expiration date | January 31, 2025 |
| Address | Albany, GA 31705 |
| Subwatershed | Turner City-Flint River (HUC 031300060905) |
| NAICS | 236210 – Industrial Building Construction |
| SIC | 1541 – Industrial Buildings And Warehouses |
Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES GAR18AE05.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES GAR18AE05.
Inspections
EPA’s inspection file holds no inspection for NPDES GAR18AE05.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES GAR18AE05.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, GAR18AE05.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID GAR18AE05 there.
MAPLE HILL C&D LANDFILL - CELL NO. 5 CONSTRUCTION, Albany, Georgia: Coverage under a general permit GAR18AE05, held by James Melton; Construction stormwater; Effective; issued August 1, 2018, term to January 31, 2025; Industrial Building Construction.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 30,681 were issued before GAR18AE05. James Melton holds 3 permits in Georgia.
Other permits held by James Melton
- BUCK RUN SUBDIVISION SECTION 6, Leesburg: GAR396902, issued 2023-08-01
- LAKEWOOD SUBDIVISON SECTION 1, Leesburg: GAR397197, issued 2023-08-01
Coverages issued nearest GAR18AE05
- 2018-08-01: TRUETT'S CHICK-FIL-A #70054, Loganville: GAR18ADFB, held by Joseph Latimer
- 2018-08-01: CANE BRANCH WWTP, Dahlonega: GAR18ADFD, held by Sean Phipps
- 2018-08-01: AUTO IMAGE COLLISION, Woodstock: GAR18AE00, held by Auto Image Collision Repair
- 2018-08-01: THE PINES AT MOSSY LAKE P2, Perry: GAR18AE01, held by Ed Beckham
- 2018-08-01: TANNERS CREEK COMMONS, Oakwood: GAR18AE04, held by Development TC, Inc.
- 2018-08-01: DOLLAR GENERAL STORE #30643, Milledgeville: GAR18AE06, held by Zach Crumley
- 2018-08-01: TOOMBS LIVINGSTON SOLAR FARM, Vidalia: GAR18AE08, held by Nick Stein
- 2018-08-01: 1045 EAST LAKE RD., Mcdonough: GAR18AE0A, held by The Patterson Real Estate Group, Inc.
- 2018-08-01: SWINGTIME ACCESS ROAD, Marietta: GAR18AE0B, held by Jordan Wood
- 2018-08-01: FIRE STATION 30, Canton: GAR18AE0C, held by Cherokee County Board of Commissioners
MAPLE HILL C&D LANDFILL - CELL NO. 5 CONSTRUCTION among its neighbors
19 discharge permits are in the Turner City-Flint River subwatershed (HUC 031300060905); GAR18AE05 is one. Its county: 31, 3 major; GAR18AE05 is minor permit.
Other permits in the Turner City-Flint River subwatershed (HUC 031300060905)
- 1401 EVELYN AVE, Albany: GAR18BF34, minor, term to 2028-07-31
- ALBANY DOUGHERTY INDUSTRIAL PARK, Unknown: GAR108377, minor, term to 2018-07-31
- CHEP SERVICES, LLC, Albany: GAIS13012, minor, term to 2017-05-31
- DOGWOOD TRAIL APARTMENTS II, Albany: GAR18B76B, minor, term to 2028-07-31
- DUNES PROPERTIES, LLP RETENTION POND, Albany: GAR148866, minor, term to 2018-07-31
- HHG PROPERTIES, LLC, Unknown: GAR153723, minor, term to 2018-07-31
- INDEPENDENCE DRIVE ALLEY, Albany: GAR25440A, minor, term to 2028-07-31
- INTERSTATE WAREHOUSE KRUG STREET EXPANSION, Albany: GAR148111, minor, term to 2018-07-31
- LE21284 FOUR STAR FREIGHTLINER, Albany: GAR18B802, minor, term to 2028-07-31
- LE25187 LEWIS- SYLVESTER HIGHWAY, Albany: GAR18BED3, minor, term to 2028-07-31
Nearby on the register
- Discharge permits in Albany
- Every permit record in Albany, A to Z
- Discharge permits in Georgia
- Every permit record in Georgia, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
MAPLE HILL C&D LANDFILL - CELL NO. 5 CONSTRUCTION is among 14 storm water construction permits in Dougherty County, and 0.0% of that group carries a violation on file. Counting this filing, 92.9% of the Dougherty County storm water permits were issued before it, and the Turner City-Flint River subwatershed holds 19 NPDES permits.