NPDES GAR18B0BC · Clean Water Act
3584 BANKS WAY, Valdosta, GA: NPDES GAR18B0BC discharge permit, effluent exceedances, inspections, penalties
3584 BANKS WAY, Valdosta, Georgia: General permit coverage GAR18B0BC, held by Coleman Davis; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028; New Single-Family Housing Construction [except For-Sale Builders].
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR18B0BC. Coleman Davis holds 4 permits in Georgia.
Other permits held by Coleman Davis
- MARANATHA LANE TOWNHOMES 2025, Valdosta: GAR18B7BE, issued 2023-08-01
- US 84 WAREHOUSES, Valdosta: GAR18BAE7, issued 2023-08-01
- KINDERLOU BUSINESS PARK PHASE II, Valdosta: GAR18BC52, issued 2023-08-01
Coverages issued nearest GAR18B0BC
- 2023-08-01: BELVEDERE PARK, Decatur: GAR18B0B5, held by Caleb Wittenmyer
- 2023-08-01: NORTH RIVER BRIDGE, St Marys: GAR18B0B6, held by Naval Submarine Base Kings Bay
- 2023-08-01: LAKE HOUSE, Milledgeville: GAR18B0B8, held by James Bartlett
- 2023-08-01: TAKCO CONSTRUCTION SITE, West Point: GAR18B0B9, held by Mindy Im
- 2023-08-01: PAD GRADED LOTS, Acworth: GAR18B0BB, held by WILSON DEVELOPMENT GROUP, LLC
- 2023-08-01: 132 CRISPEN BOULEVARD, Brunswick: GAR18B0BD, held by Oscar Lane Real Estate Properties, LLC
- 2023-08-01: GRANTS FERRY COVE EAST, Brunswick: GAR18B0BE, held by Grants Ferry Development, LLC
- 2023-08-01: FORSYTH COMMERCE CENTER BUILDING 300, Cumming: GAR18B0BF, held by Robert McLeod
- 2023-08-01: COMMERCE HBF, Commerce: GAR18B0C1, held by Carson Mathis
- 2023-08-01: UNDERGROUND SYSTEMS, Buford: GAR18B0C2, held by H&H Properties of GA, LLC
3584 BANKS WAY among its neighbors
79 discharge permits are in the Tiger Creek-Withlacoochee River subwatershed (HUC 031102030802); GAR18B0BC is one.
Other permits in the Tiger Creek-Withlacoochee River subwatershed (HUC 031102030802)
- 2101 LYNN HAVEN ROAD VALDOSTA, GA, 31601, Valdosta: GAR3963E3, minor, term to 2028-07-31
- 3575 BANKS WAY, Valdosta: GAR396DD3, minor, term to 2028-07-31
- 3632 BEAR LAKE RD LOT 7, Hahira: GAR396D32, minor, term to 2028-07-31
- 3755 TIMBER RIDGE RD / LOT 59, Hahira: GAR3975E9, minor, term to 2028-07-31
- 3764 TIMBER RIDGE, Valdosta: GAR3970E6, minor, term to 2028-07-31
- 3773 KINDERLOU FOREST, Valdosta: GAR3969E4, minor, term to 2028-07-31
- 3785 ISLAND CREEK RD, Valdosta: GAR3975BF, minor, term to 2028-07-31
- 3790 BEAR LAKE RD, Valdosta: GAR39768E, minor, term to 2028-07-31
- 3897 BEAR HOLLOW, Valdosta: GAR39697C, minor, term to 2028-07-31
- 3902 ISLAND CREEK RD, Valdsota: GAR396978, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 3584 BANKS WAY |
|---|---|
| Permittee | Coleman Davis |
| NPDES ID | GAR18B0BC |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Valdosta, GA 31601 |
| Subwatershed | Tiger Creek-Withlacoochee River (HUC 031102030802) |
| NAICS | 236115 – New Single-Family Housing Construction [except For-Sale Builders] |
| SIC | 1521 – Single-Family Housing Construction |
NPDES GAR18B0BC: effluent limits and exceedances
3584 BANKS WAY (NPDES GAR18B0BC): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR18B0BC: no pollutant row on file.
NPDES GAR18B0BC: inspections, violations and enforcement
NPDES GAR18B0BC (3584 BANKS WAY): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR18B0BC
NPDES GAR18B0BC: one email when its EPA record changes — $99/month.
Permits near NPDES GAR18B0BC
NPDES GAR18B0BC: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.