NPDES GAR18B25B · Clean Water Act
KEEP 2.0 ATL NORTH PHASE 1C, Cartersville, GA: NPDES GAR18B25B discharge permit, effluent exceedances, inspections, penalties
KEEP 2.0 ATL NORTH PHASE 1C, Cartersville, Georgia: General permit coverage GAR18B25B, held by Steven Roberts; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028; Other Heavy and Civil Engineering Construction.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR18B25B. Steven Roberts holds 11 permits in Georgia.
Other permits held by Steven Roberts
- KEEP 2.0 ATL NORTH, Cartersville: GAR18AA3C, issued 2023-08-01
- KEEP 2.0 ATL NORTH PHASE 1B, Cartersville: GAR18AFBF, issued 2018-08-01
- KEEP 2.0 ATL NORTH PHASE 2, Cartersville: GAR18B6C6, issued 2023-08-01
- KEEP 2.0 ATL NORTH LOG-1, Cartersville: GAR18BF32, issued 2023-08-01
- KEEP 2.0 ATL NORTH TEMP PARKING, Cartersville: GAR18BF3C, issued 2023-08-01
- KEEP 2.0 ATL NORTH FIBER PATH 07 (STEVEN ROBERTS), Cartersville: GAR18BF4B, issued 2023-08-01
- KEEP 2.0 ATL NORTH 85, Cartersville: GAR18BF76, issued 2023-08-01
- KEEP 2.0 ATL NORTH FIBER PATH 07B (STEVEN ROBERTS), Cartersville: GAR18C040, issued 2023-08-01
- KEEP 2.0 ATL NORTH FIBER PATHWAY 7 - PAULDING COUNTY, Carteersville: GAR18C370, issued 2023-08-01
- KEEP 2.0 ATL NORTH CONSTRUCTION LOGISTICS LAYDOWN PH5, Cartersville: GAR18C38A, issued 2023-08-01
Coverages issued nearest GAR18B25B
- 2023-08-01: MILTON MONTESSORI, Milton: GAR18B253, held by Biju Eappen
- 2023-08-01: NORTH HALL HIGH SCHOOL ADDITION & RENOVATION, Gainsville: GAR18B257, held by Pam Cravero
- 2023-08-01: WASTE MANAGEMENT FACILITY, Fortson: GAR18B258, held by Michael Phelan
- 2023-08-01: FIFTH THIRD BANK, Gainesville: GAR18B259, held by Branch Limestone Associates LP
- 2023-08-01: WEED STREET DEMO, St. Marys: GAR18B25A, held by DEVELOPMENT AUTHORITY OF ST MARYS
- 2023-08-01: WON BUDDHISM OF ATLANTA, Suwanee: GAR18B260, held by HEUY PARK
- 2023-08-01: SC ENTERPRISES OF THOMSON, LLC, Thomson: GAR18B261, held by SC Enterprises of Thomson, LLC
- 2023-08-01: ATLANTA FIRE STATION #30, Atlanta: GAR18B262, held by Prentiss Redding
- 2023-08-01: 413 ENGLEWOOD AVE, ATLANTA, GA, Atlanta: GAR18B266, held by THE BENOIT GROUP, LLC
- 2023-08-01: CROSS KEYS HIGH SCHOOL, Atlanta: GAR18B267, held by richard boyd
KEEP 2.0 ATL NORTH PHASE 1C among its neighbors
174 discharge permits are in the Ward Creek-Etowah River subwatershed (HUC 031501041301); GAR18B25B is one.
Other permits in the Ward Creek-Etowah River subwatershed (HUC 031501041301)
- 29 WATERSIDE DRIVE, Unknown: GAR362729, minor, term to 2018-07-31
- ALDI INC. - CARTERSVILLE, GA, Cartersville: GAR151843, minor, term to 2018-07-31
- ARBY'S (LAKEPOINT SPORTING SOUTH CAMPUS DEVELOPMENT), Emerson: GAR373986, minor, term to 2018-07-31
- BARTOW COUNTY WATER DEPARTMENT (SOUTHEAST WPCP), Cartersville: GA0037664, minor, term to 2021-03-31
- BIRCHWOOD FARMS, Dallas: GAR397361, minor, term to 2028-07-31
- CARTER GROOVE PLANTATION PHASE 1, Douglasville: GAR353863, minor, term to 2018-07-31
- CARTER GROVE LOT 1091, Cartersville: GAR377493, minor, term to 2018-07-31
- CARTER GROVE LOT 1092, Cartersville: GAR382264, minor, term to 2018-07-31
- CARTER GROVE LOT 1108, Cartersville: GAR375024, minor, term to 2018-07-31
- CARTER GROVE LOT 1214, Cartersville: GAR382268, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | KEEP 2.0 ATL NORTH PHASE 1C |
|---|---|
| Permittee | Steven Roberts |
| NPDES ID | GAR18B25B |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Cartersville, GA 30120 |
| Subwatershed | Ward Creek-Etowah River (HUC 031501041301) |
| NAICS | 237990 – Other Heavy and Civil Engineering Construction |
| SIC | 1629 – Heavy Construction |
NPDES GAR18B25B: effluent limits and exceedances
KEEP 2.0 ATL NORTH PHASE 1C (NPDES GAR18B25B): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR18B25B: no pollutant row on file.
NPDES GAR18B25B: inspections, violations and enforcement
NPDES GAR18B25B (KEEP 2.0 ATL NORTH PHASE 1C): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR18B25B
NPDES GAR18B25B: one email when its EPA record changes — $99/month.
Permits near NPDES GAR18B25B
NPDES GAR18B25B: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.