NPDES GAR18B370 · Clean Water Act
GTD COWETA 2- LOT 1 (BLEDSOE RD), Newnan, GA: NPDES GAR18B370 discharge permit, effluent exceedances, inspections, penalties
GTD COWETA 2- LOT 1 (BLEDSOE RD), Newnan, Georgia: General permit coverage GAR18B370, held by GTD COWETA 2- LOT 1, LLC; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028; Commercial and Institutional Building Construction.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR18B370.
Coverages issued nearest GAR18B370
- 2023-08-01: PROCESS EQUIPMENT AND CONTROLS, Covington: GAR18B36A, held by Ryan Lowe
- 2023-08-01: BOARDWALK STORAGE - WADE GREEN, Acworth: GAR18B36B, held by Boardwalk Storage - Wade Green, LLC
- 2023-08-01: 5530 EXPORT BLVD TRUCKING YARD, Garden City: GAR18B36C, held by Pro Land Investment LLC
- 2023-08-01: JOHNS CREEK FIRE STATION 63, Johns Creek: GAR18B36E, held by Erica Madsen
- 2023-08-01: GDOT BARROW PIT SR-133, Doerun: GAR18B36F, held by Brandon Barnes
- 2023-08-01: MCEVER PLAZA, Gainesville: GAR18B371, held by 965 McEver LLC
- 2023-08-01: BROOKS RESIDENCE, Milton: GAR18B372, held by Thane and Cheri Brooks
- 2023-08-01: NEW CONSTRUCTION - RIDGE PLACE, Lake Park: GAR18B373, held by Benjamin Corbitt
- 2023-08-01: COLD FUSION VALDOSTA, Valdosta: GAR18B374, held by Loren Bunnell
- 2023-08-01: DOBSON HOME, Greensboro: GAR18B375, held by Jason Dobson
GTD COWETA 2- LOT 1 (BLEDSOE RD) among its neighbors
88 discharge permits are in the Wahoo Creek subwatershed (HUC 031300020402); GAR18B370 is one.
Other permits in the Wahoo Creek subwatershed (HUC 031300020402)
- 100 E WASHINGTON LOT 3, Newnan: GAR397620, minor, term to 2028-07-31
- 131 EAST BROAD, Newnan: GAR18B71B, minor, term to 2028-07-31
- 135 EAST BROAD, Fayetteville: GAR18B71C, minor, term to 2028-07-31
- 51 MLK, Newnan: GAR18BD38, minor, term to 2028-07-31
- 57 EAST PHASE 1, Newnan: GAR18C070, minor, term to 2028-07-31
- 7 CALHOUN STREET, Newnan: GAR18B882, minor, term to 2028-07-31
- ASCOT SUPPLY CORP., Newnan: GAR149099, minor, term to 2018-07-31
- AUSTIN STOREY LOTS 101,102,103,104,124,125, Newman: GAR362462, minor, term to 2018-07-31
- AUSTIN LAKE S/D LOT 8 B, Newnan: GAR379436, minor, term to 2018-07-31
- AVERY PARK (THE BOULEVARD) LOTS12-16,48, Newnan: GAR362737, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | GTD COWETA 2- LOT 1 (BLEDSOE RD) |
|---|---|
| Permittee | GTD COWETA 2- LOT 1, LLC |
| NPDES ID | GAR18B370 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Newnan, GA 30263 |
| Subwatershed | Wahoo Creek (HUC 031300020402) |
| NAICS | 236220 – Commercial and Institutional Building Construction |
| SIC | 1542 – Nonresidential Construction |
NPDES GAR18B370: effluent limits and exceedances
GTD COWETA 2- LOT 1 (BLEDSOE RD) (NPDES GAR18B370): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR18B370: no pollutant row on file.
NPDES GAR18B370: inspections, violations and enforcement
NPDES GAR18B370 (GTD COWETA 2- LOT 1 (BLEDSOE RD)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR18B370
NPDES GAR18B370: one email when its EPA record changes — $99/month.
Permits near NPDES GAR18B370
NPDES GAR18B370: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.