NPDES GAR18B51A · Clean Water Act
POWERHOUSE DIESEL GENERATORS, Valdosta, GA: NPDES GAR18B51A discharge permit, effluent exceedances, inspections, penalties
POWERHOUSE DIESEL GENERATORS, Valdosta, Georgia: General permit coverage GAR18B51A, held by Mitchell Tyler; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028; Industrial Building Construction.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR18B51A.
Coverages issued nearest GAR18B51A
- 2023-08-01: 112 RADIAN, Dallas: GAR18B510, held by Jp Realty investments
- 2023-08-01: FASTENAL COMPANY, Carrollton: GAR18B511, held by Cara Donchak
- 2023-08-01: CHIPMAN STATION, Union Point: GAR18B512, held by Bandit Holdings LLC
- 2023-08-01: THE ESTATES AT OXFORD, Cedartown: GAR18B514, held by Victor Spivey
- 2023-08-01: 3800 WOODFIELD DRIVE - CLEAR & GRADE, Macon: GAR18B516, held by Robert E. Lee, Jr.
- 2023-08-01: 406 TOWN PARK BLVD SITE, Evans: GAR18B51B, held by Evans Society Investment Group
- 2023-08-01: RV/BOAT STORAGE, Fort Valley: GAR18B51C, held by Red Moon Development and Construction, Inc
- 2023-08-01: HIGH SCHOOL ADDITION TO ECHOLS K-8 SCHOOL, Valdosta: GAR18B51D, held by Echols County School District
- 2023-08-01: ADIYOGI 99 LLC, Warner Robins: GAR18B51E
- 2023-08-01: CENTRAL FRANKLIN INDUSTRIAL PARK LOTS 4 & 5, Carnesville: GAR18B51F, held by Aubery Lunsford
POWERHOUSE DIESEL GENERATORS among its neighbors
51 discharge permits are in the Upper Mud Swamp subwatershed (HUC 031102021001); GAR18B51A is one.
Other permits in the Upper Mud Swamp subwatershed (HUC 031102021001)
- ABOUT MY FATHERS MINISTRIES, Valdosta: GAR152582, minor, term to 2018-07-31
- ACE ELECTRIC - NEW WAREHOUSE/OFFICE, Valdosta: GAR150169, minor, term to 2018-07-31
- ACE HQ, Valdosta: GAR18AE7B, minor, term to 2025-01-31
- AIRPORT PARKING EXPANSION 2025, Valdosta: GAR18BCB6, minor, term to 2028-07-31
- ALL METAL BUILDINGS, Valdosta: GAR18C090, minor, term to 2028-07-31
- CHEMICAL RESEARCH/TECHNOLOGY CO (CRT), Valdosta: GA0000205, minor, term to 2021-03-31
- CITY OF VALDOSTA, Valdosta: GAL020222, minor, term to 2025-12-31
- CONCRETE INTERPRISES, LLC, Valdosta: GAIS03734, minor, term to 2017-05-31
- COPELAND ROAD SUBDIVISION, Valdosta: GAR39748F, minor, term to 2028-07-31
- DEWAR ELEMENTARY SCHOOL CLASSROOM ADDITION, Valdosta: GAR18B059, minor, term to 2025-01-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | POWERHOUSE DIESEL GENERATORS |
|---|---|
| Permittee | Mitchell Tyler |
| NPDES ID | GAR18B51A |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Valdosta, GA 31601 |
| Subwatershed | Upper Mud Swamp (HUC 031102021001) |
| NAICS | 236210 – Industrial Building Construction |
| SIC | 1541 – Industrial Buildings And Warehouses |
NPDES GAR18B51A: effluent limits and exceedances
POWERHOUSE DIESEL GENERATORS (NPDES GAR18B51A): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR18B51A: no pollutant row on file.
NPDES GAR18B51A: inspections, violations and enforcement
NPDES GAR18B51A (POWERHOUSE DIESEL GENERATORS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR18B51A
NPDES GAR18B51A: one email when its EPA record changes — $99/month.
Permits near NPDES GAR18B51A
NPDES GAR18B51A: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.