NPDES GAR18B73F · Clean Water Act
546 HARBOUR SHORES DR., Jackson, GA: NPDES GAR18B73F discharge permit, effluent exceedances, inspections, penalties
546 HARBOUR SHORES DR., Jackson, Georgia: General permit coverage GAR18B73F, held by The Patterson Real Estate Group, Inc.; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR18B73F. The Patterson Real Estate Group, Inc. holds 10 permits in Georgia.
Other permits held by The Patterson Real Estate Group, Inc.
- 1045 EAST LAKE RD., Mcdonough: GAR18AE0A, issued 2018-08-01
- 2273 AIRLINE RD., Mcdonough: GAR18AE16, issued 2018-08-01
- 2291 AIRLINE RD., Mcdonough: GAR18AE17, issued 2018-08-01
- 277 EAST KNIGHT RD., Mcdonough: GAR18B736, issued 2023-08-01
- 287 EAST KNIGHT RD., Mcdonough: GAR18B737, issued 2023-08-01
- 257 EAST KNIGHT RD., Mcdonough: GAR18B739, issued 2023-08-01
- 1098 E LAKE RD., Mcdonough: GAR18B73D, issued 2023-08-01
- 254 CRUMBLEY RD, Mcdonough: GAR18BB9B, issued 2023-08-01
- 264 CRUMBLEY RD, Mcdonough: GAR18BBA0, issued 2023-08-01
Coverages issued nearest GAR18B73F
- 2023-08-01: 257 EAST KNIGHT RD., Mcdonough: GAR18B739, held by The Patterson Real Estate Group, Inc.
- 2023-08-01: 2955 KLONDIKE RD GRADING, Stonecrest: GAR18B73A, held by William Cordell Lyons
- 2023-08-01: COAST GUARD BEACH PARK, St. Simons Island: GAR18B73B, held by Glynn County
- 2023-08-01: SRNI GYMNASIUM BUILDING, Cumming: GAR18B73C, held by Eastern Orthodox Community of Northern Georgia, Inc.
- 2023-08-01: 1098 E LAKE RD., Mcdonough: GAR18B73D, held by The Patterson Real Estate Group, Inc.
- 2023-08-01: 5585 BLACK BEAR POINT, Big Canoe: GAR18B740, held by Dave McMullen
- 2023-08-01: LINEAR PARK, Macon: GAR18B743, held by Parks & Beautification, Michael Glisson
- 2023-08-01: SHELBY, Brookhaven: GAR18B744, held by Maxim Kovtoun
- 2023-08-01: DENTIST OFFICE, Dalton: GAR18B746, held by Jason Blair
- 2023-08-01: INTER ATLANTA FC GLENWOOD SOCCER COMPLEX, Decatur: GAR18B747, held by Inter Atlanta Football Club
546 HARBOUR SHORES DR. among its neighbors
35 discharge permits are in the Fambro Creek-Towaliga River subwatershed (HUC 030701031106); GAR18B73F is one.
Other permits in the Fambro Creek-Towaliga River subwatershed (HUC 030701031106)
- 133 TRUCKSTOP WAY, Jackson: GAR18C059, minor, term to 2028-07-31
- 250 ENTERPRISE CONNECTOR, Jackson: GAR18BF26, minor, term to 2028-07-31
- ATL086, Jackson: GAR18B46F, minor, term to 2028-07-31
- BOGAN MEADOWS LOT 47-50, 62-66, 68-72, Unknown: GAR377686, minor, term to 2018-07-31
- BOGAN MEADOWS LOTS 74-79, 85, 94, 95, 98, 99, Unknown: GAR377679, minor, term to 2018-07-31
- BRUSH ARBOR LOT 102, Mcdonough: GAR3947F9, minor, term to 2028-07-31
- BRUSH ARBOR LOT 124, Mcdonough: GAR3947FA, minor, term to 2028-07-31
- BRUSH ARBOR LOT 135, Mcdonough: GAR3947FB, minor, term to 2028-07-31
- BRUSH ARBOR LOT 82, Mcdonough: GAR3947F0, minor, term to 2028-07-31
- BRUSH ARBOR LOT 88, Mcdonough: GAR3947F4, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 546 HARBOUR SHORES DR. |
|---|---|
| Permittee | The Patterson Real Estate Group, Inc. |
| NPDES ID | GAR18B73F |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Jackson, GA 30233 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Fambro Creek-Towaliga River (HUC 030701031106) |
NPDES GAR18B73F: effluent limits and exceedances
546 HARBOUR SHORES DR. (NPDES GAR18B73F): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR18B73F: no pollutant row on file.
NPDES GAR18B73F: inspections, violations and enforcement
NPDES GAR18B73F (546 HARBOUR SHORES DR.): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR18B73F
NPDES GAR18B73F: one email when its EPA record changes — $99/month.
Permits near NPDES GAR18B73F
NPDES GAR18B73F: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.