NPDES GAR18B895 · Clean Water Act
SUPER-SOD COMPOSTING FACILTIY, Marshallville, GA: NPDES GAR18B895 discharge permit, effluent exceedances, inspections, penalties
SUPER-SOD COMPOSTING FACILTIY, Marshallville, Georgia: General permit coverage GAR18B895, held by Tatum Reddick; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028; Other Heavy and Civil Engineering Construction.
- February 27, 2026: Evaluation (S).
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR18B895. Tatum Reddick holds 2 permits in Georgia.
Other permits held by Tatum Reddick
- MIKE PHELPS INDUSTRIAL, Warner Robins: GAR18BBD7, issued 2023-08-01
Coverages issued nearest GAR18B895
- 2023-08-01: CULVER'S OF WINDER, GA, Winder: GAR18B88F, held by Bethlehem Hospitality Group
- 2023-08-01: WASHINGTON STORE ALL, Calhoun: GAR18B890, held by Mitchell Washington
- 2023-08-01: NSH CHEROKEE MOB 3, Canton: GAR18B892, held by Northside Hospital, Inc.
- 2023-08-01: GARLAND MOUNTAIN, Waleska: GAR18B893, held by Jack Chevalier
- 2023-08-01: V & D FARM, Hartwell: GAR18B894, held by Duc DANG
- 2023-08-01: LOUDOUN DR, Covington: GAR18B896, held by Tyrone Marvin Cobbs
- 2023-08-01: RIDGE PINE ELEVATED TANK AND BOOSTER PUMP STATION, Canton: GAR18B897, held by Bethany Watson
- 2023-08-01: MANCHESTER HIGH SCHOOL SOFTBALL FIELD & TRACK RENOVATIONS, Manchester: GAR18B898, held by Meriwether County Board of Education
- 2023-08-01: WORLD EMBLEM, Norcross: GAR18B899, held by World Emblem
- 2023-08-01: LOWNDES LESTER 1 & 2 SOLAR FARM, Valdosta: GAR18B89C, held by Nick Stein / Inman Solar
SUPER-SOD COMPOSTING FACILTIY among its neighbors
2 discharge permits are in the Upper Beaver Creek subwatershed (HUC 031300060101); GAR18B895 is one.
Other permits in the Upper Beaver Creek subwatershed (HUC 031300060101)
- WILLIAM MELTON DEVELOPMENT (EPD-WCD), Marshallville: GAR150761, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- Its newest dated event on file is an inspection on February 27, 2026, 229 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SUPER-SOD COMPOSTING FACILTIY |
|---|---|
| Permittee | Tatum Reddick |
| NPDES ID | GAR18B895 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Marshallville, GA 31057 |
| Subwatershed | Upper Beaver Creek (HUC 031300060101) |
| NAICS | 237990 – Other Heavy and Civil Engineering Construction |
| SIC | 1629 – Heavy Construction |
NPDES GAR18B895: effluent limits and exceedances
SUPER-SOD COMPOSTING FACILTIY (NPDES GAR18B895): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR18B895: no pollutant row on file.
NPDES GAR18B895: inspections, violations and enforcement
NPDES GAR18B895: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| February 27, 2026 | Evaluation | S |
NPDES GAR18B895 (SUPER-SOD COMPOSTING FACILTIY): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR18B895
NPDES GAR18B895: one email when its EPA record changes — $99/month.
Permits near NPDES GAR18B895
NPDES GAR18B895: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded October 14, 2026.