NPDES GAR18BAE9 · Clean Water Act
PARC AT ROSEVIEW, Griffin, GA: NPDES GAR18BAE9 discharge permit, effluent exceedances, inspections, penalties
PARC AT ROSEVIEW, Griffin, Georgia: General permit coverage GAR18BAE9, held by Richelle Patton; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028; Commercial and Institutional Building Construction.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR18BAE9. Richelle Patton holds 3 permits in Georgia.
Other permits held by Richelle Patton
- PARC AT ROSENWALD, Griffin: GAR18BAE1, issued 2023-08-01
- PARC AT SOLOMON, Griffin: GAR18BAE3, issued 2023-08-01
Coverages issued nearest GAR18BAE9
- 2023-08-01: FEDEX FREIGHT, Valdosta: GAR18BAE2, held by Philip Wood
- 2023-08-01: PARC AT SOLOMON, Griffin: GAR18BAE3, held by Richelle Patton
- 2023-08-01: THE DAIRY AT HILLCREST PH2-LAGRANGE, Hogansville: GAR18BAE4, held by Trademark Quality Homes
- 2023-08-01: CHEMTRADE LOGISTICS, Augusta: GAR18BAE6, held by Stanley Nazario
- 2023-08-01: US 84 WAREHOUSES, Valdosta: GAR18BAE7, held by Coleman Davis
- 2023-08-01: HOBBS STREET INDUSTRIAL, INC., Royston: GAR18BAEB, held by Hobbs St Industrial, Inc.
- 2023-08-01: BARNETT AND CHEEVES, Newnan: GAR18BAEC, held by Barnett & Cheeves
- 2023-08-01: JIM ELLIS CADILLAC PARKING STRUCTURE, Chamblee: GAR18BAED, held by JBE Real Estate Holdings, LLLP
- 2023-08-01: THE VILLAGES AT BROWNS MILL STATION, Atlanta: GAR18BAEE, held by Robb Jones
- 2023-08-01: 5705 RIVERSIDE DRIVE, Sandy Springs: GAR18BAEF, held by Carlton Brown
PARC AT ROSEVIEW among its neighbors
36 discharge permits are in the Cabin Creek subwatershed (HUC 030701031104); GAR18BAE9 is one.
Other permits in the Cabin Creek subwatershed (HUC 030701031104)
- AGL GRIFFIN SUB METER STATION PROJECT, Griffin: GAR254377, minor, term to 2028-07-31
- BUTTS COUNTY, ET AL. WATER & SEWER AUTHORITY (BUCKSNORT RANCH LAND APPLICATION S, Jackson: GAJ020038, minor, term to 2021-08-31
- CITY OF GRIFFIN (CABIN CR), Griffin: GAL020214, minor, term to 2025-12-31
- COLONADE, Unknown: GAR347392, minor, term to 2018-07-31
- DOLLAR GENERAL ROOPVILLE, Roopville: GAR153168, minor, term to 2018-07-31
- DSC LOGISTICS, Mcdonough: GAIS12932, minor, term to 2027-05-31
- GRIFFIN SPALDING AIRPORT, Griffin: GAR2544CC, minor, term to 2028-07-31
- HIGH FALLS INDUSTRIAL BUILDING 5, Stockbridge: GAR18BF1C, minor, term to 2028-07-31
- HIGH FALLS INDUSTRIAL PHASE 1, Stockbridge: GAR396108, minor, term to 2025-01-31
- HOLLIDAY PASS SUBDIVISION LOT 69, Griffin: GAR3945E8, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PARC AT ROSEVIEW |
|---|---|
| Permittee | Richelle Patton |
| NPDES ID | GAR18BAE9 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Griffin, GA 30223 |
| Subwatershed | Cabin Creek (HUC 030701031104) |
| NAICS | 236220 – Commercial and Institutional Building Construction |
| SIC | 1542 – Nonresidential Construction |
NPDES GAR18BAE9: effluent limits and exceedances
PARC AT ROSEVIEW (NPDES GAR18BAE9): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR18BAE9: no pollutant row on file.
NPDES GAR18BAE9: inspections, violations and enforcement
NPDES GAR18BAE9 (PARC AT ROSEVIEW): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR18BAE9
NPDES GAR18BAE9: one email when its EPA record changes — $99/month.
Permits near NPDES GAR18BAE9
NPDES GAR18BAE9: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.