NPDES GAR18C07D · Clean Water Act
PINKSTON LOT 9, Winder, GA: NPDES GAR18C07D discharge permit, effluent exceedances, inspections, penalties
PINKSTON LOT 9, Winder, Georgia: General permit coverage GAR18C07D, held by 418 Grayson Drive, LLC; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR18C07D.
Coverages issued nearest GAR18C07D
- 2023-08-01: PHILLIP KING, Dawsonville: GAR18C078, held by Phillip James King
- 2023-08-01: PINKSTON LOT 4, Winder: GAR18C079, held by 417 Grayson Drive, LLC
- 2023-08-01: SAS-3, LLC, Dalton: GAR18C07A, held by Curt Welch
- 2023-08-01: SOLIS CRESTWOOD, Duluth: GAR18C07B, held by Santiago Patino
- 2023-08-01: BISON LANDING COMMERCIAL, Monroe: GAR18C07C, held by baldpates general contracting
- 2023-08-01: HYUNDAI TRANSYS GEORGIA POWERTRAIN INC., West Point: GAR18C07E, held by Jungeun Kim
- 2023-08-01: HIGHTOWER RESIDENCE, Senoia: GAR18C07F, held by Nathan Hightower
- 2023-08-01: DRY CREEK SOLAR - SUBSTATION, Louisville: GAR18C080, held by Stellar Dry Creek Solar LLC
- 2023-08-01: IMPROVEMENTS TO PACKER PARK SPORTS COMPLEX, Norman Park: GAR18C081, held by Colquitt County School District
- 2023-08-01: SHAMROCK SOLAR - SUBSTATION, East Dublin: GAR18C082, held by Stellar Shamrock Solar LLC
PINKSTON LOT 9 among its neighbors
62 discharge permits are in the Beech Creek subwatershed (HUC 030701010301); GAR18C07D is one.
Other permits in the Beech Creek subwatershed (HUC 030701010301)
- 10-1563 WINDER, GA, Winder: GAR18C11C, minor, term to 2028-07-31
- 1146 BRIDGE CREST COURT - LOT 16, Winder: GAR369578, minor, term to 2018-07-31
- 1708 HIGHWAY 82 - TRACT 1, Winder: GAR396F8B, minor, term to 2028-07-31
- 251 FLEX PARK, Winder: GAR18B289, minor, term to 2028-07-31
- ADAMS ESTATES, Winder: GAR396734, minor, term to 2028-07-31
- BARROW COUNTY AIRPORT, Winder: GAR18BA18, minor, term to 2028-07-31
- BARROW COUNTY BD OF COMM., Bethlehem: GAU020271, minor, term to 2007-08-12
- BARROW COUNTY BURN BUILDING, Unknown: GAR148894, minor, term to 2018-07-31
- BARROW COUNTY MS4, Winder: GAG610005, minor, term to 2022-12-05
- BRIDGE CREST - LOT 15, Winder: GAR381391, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PINKSTON LOT 9 |
|---|---|
| Permittee | 418 Grayson Drive, LLC |
| NPDES ID | GAR18C07D |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Winder, GA 30680 |
| Subwatershed | Beech Creek (HUC 030701010301) |
NPDES GAR18C07D: effluent limits and exceedances
PINKSTON LOT 9 (NPDES GAR18C07D): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR18C07D: no pollutant row on file.
NPDES GAR18C07D: inspections, violations and enforcement
NPDES GAR18C07D (PINKSTON LOT 9): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR18C07D
NPDES GAR18C07D: one email when its EPA record changes — $99/month.
Permits near NPDES GAR18C07D
NPDES GAR18C07D: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.