Velarion Records
Free: one email when NPDES GAR240096 changes. Unsubscribe any time.

NPDES GAR240096 · Clean Water Act

POOLER SIDEWALK EXTENSION, PHASE III, Pooler, GA: NPDES GAR240096 discharge permit, effluent exceedances, inspections, penalties

POOLER SIDEWALK EXTENSION, PHASE III, Pooler, Georgia: General permit coverage GAR240096, held by CITY OF POOLER; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.

Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR240096. CITY OF POOLER holds 7 permits in Georgia.

Other permits held by CITY OF POOLER

Coverages issued nearest GAR240096

Other permits in Pooler

What stands out

  • Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityPOOLER SIDEWALK EXTENSION, PHASE III
PermitteeCITY OF POOLER
NPDES IDGAR240096
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedSeptember 23, 2013
ExpiresJuly 31, 2018
AddressPooler, GA

NPDES GAR240096: effluent limits and exceedances

POOLER SIDEWALK EXTENSION, PHASE III (NPDES GAR240096): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES GAR240096: no pollutant row on file.

NPDES GAR240096: inspections, violations and enforcement

NPDES GAR240096 (POOLER SIDEWALK EXTENSION, PHASE III): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES GAR240096

NPDES GAR240096: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES GAR240096

NPDES GAR240096: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.