NPDES GAR247486 · Clean Water Act
WOODLAKE UNIT 8 - UNDERGROUND POWER INSTALLATION, GA: NPDES GAR247486 discharge permit, effluent exceedances, inspections, penalties
WOODLAKE UNIT 8 - UNDERGROUND POWER INSTALLATION, Georgia: General permit coverage GAR247486, held by Oconee Prime Holdings, LLC; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018; Water and Sewer Line and Related Structures Construction.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR247486. Oconee Prime Holdings, LLC holds 2 permits in Georgia.
Other permits held by Oconee Prime Holdings, LLC
- WOODLAKE SUBDIVISION UNIT 9 LOTS 364-373: GAR348834, issued 2013-09-23
Coverages issued nearest GAR247486
- 2013-09-23: CAMPBELLTON ROAD SIDEWALK PROJECT T-162, P.I. 0006275, CONTROL ID# D30060-14-000: GAR247474, held by Fulton County Govt, Public Works/General Services Dept
- 2013-09-23: VETERAN'S PARKWAY - 16 DIA. WATER LINE EXTENSION, Fayetteville: GAR247475, held by Fayette County Water System
- 2013-09-23: MEIGS 2013 CDBG STREET & DRAINAGE IMPROVEMENTS: GAR247480, held by City of Meigs
- 2013-09-23: COPPAGE ROAD: GAR247484, held by LOWNDES COUNTY BOARD OF COMMISSIONERS
- 2013-09-23: DOUGHERTY COUNTY ROAD & DRAINAGE IMPROVEMENTS, Albany: GAR247485, held by Dougherty County
- 2013-09-23: NORDIC WAY EXTENSION (CHATHAM COUNTY), Pooler: GAR247487, held by North Godley Industrial Park, LLC
- 2013-09-23: 2013 CDBG - STORM DRAINAGE AND STREET IMPROVEMENTS (APPLING COUNTY), Baxley: GAR247488, held by CITY OF BAXLEY
- 2013-09-23: SOUTH POINT BOULEVARD EXTENSION PHASE 1: GAR247492, held by JHJ Richfield 65, LLC & RCB Ritchfield 35, LLC
- 2013-09-23: GREENBELT - ROOP ST. TO SOUTHWIRE: GAR247495, held by Friends of Carrollton Greenbelt
- 2013-09-23: LIGHTS FERRY ROAD EXTENSION & ROUND-A-BOUT, Flowery Branch: GAR247502, held by CITY OF FLOWERY BRANCH
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,997 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WOODLAKE UNIT 8 - UNDERGROUND POWER INSTALLATION |
|---|---|
| Permittee | Oconee Prime Holdings, LLC |
| NPDES ID | GAR247486 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | GA |
| NAICS | 237110 – Water and Sewer Line and Related Structures Construction |
| SIC | 1623 – Water, Sewer, And Utility Lines |
NPDES GAR247486: effluent limits and exceedances
WOODLAKE UNIT 8 - UNDERGROUND POWER INSTALLATION (NPDES GAR247486): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR247486: no pollutant row on file.
NPDES GAR247486: inspections, violations and enforcement
NPDES GAR247486 (WOODLAKE UNIT 8 - UNDERGROUND POWER INSTALLATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR247486
NPDES GAR247486: one email when its EPA record changes — $99/month.
Permits near NPDES GAR247486
NPDES GAR247486: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.