NPDES GAR248257 · Clean Water Act
INTERSECTION IMPROVEMENTS AT WEST HIGHTOWER AND ALCOVA DRIVE, Social Circle, GA: NPDES GAR248257 discharge permit, effluent exceedances, inspections, penalties
INTERSECTION IMPROVEMENTS AT WEST HIGHTOWER AND ALCOVA DRIVE, Social Circle, Georgia: General permit coverage GAR248257, held by WALTON COUNTY BOARD OF COMMISSIONERS; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018; Water and Sewer Line and Related Structures Construction.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR248257. WALTON COUNTY BOARD OF COMMISSIONERS holds 4 permits in Georgia.
Other permits held by WALTON COUNTY BOARD OF COMMISSIONERS
- WALTON COUNTY FIRE STATION #3: GAR153272, issued 2013-09-23
- MERRIMONT SUBDIVISION & JACKS CREEK ROAD WATER MAIN PROJECT: GAR248190, issued 2013-09-23
- INTERSECTION IMPROVEMENTS S.R. 81 AT GUTHRIE CEMETERY ROAD, Walnut Grove: GAR248256, issued 2013-09-23
Coverages issued nearest GAR248257
- 2013-09-23: PHILLIPS DRIVE IMPROVEMENT, Mcdonough: GAR248251, held by City of McDonough
- 2013-09-23: DUE WEST HILLS WATER MAIN REPLACEMENT: GAR248253, held by Cobb County Water System
- 2013-09-23: MIRROR LAKE LOT -80, Villa Rica: GAR248254, held by Meritage Homes of Georgia
- 2013-09-23: FT. BENNING- BASS RD TO KELLEY HILL 10 GAS MAIN (EPD-WCD), Ft. Benning: GAR248255, held by US Army - DPW: Mr. Craig Taylor
- 2013-09-23: INTERSECTION IMPROVEMENTS S.R. 81 AT GUTHRIE CEMETERY ROAD, Walnut Grove: GAR248256, held by WALTON COUNTY BOARD OF COMMISSIONERS
- 2013-09-23: SHADDOCK CREEK 115KV SWITCHING STATION, East Dublin: GAR248258, held by Georgia Transmission Corporation
- 2013-09-23: CITY OF TALLAPOOSA WATER SYSTEM IMPROVEMENTS PROJECT NO. 141909, Tallapoosa: GAR248259, held by City of Tallapoosa
- 2013-09-23: STANLEY ROAD - COLLINS ROAD IMPROVEMENTS, Kennesaw: GAR248260, held by City of Kennesaw
- 2013-09-23: WATTS DRIVE AND DALLAS STREET IMPROVEMENTS, Kennesaw: GAR248261, held by City of Kennesaw
- 2013-09-23: HWY 129 NORTH SEWER, Cleveland: GAR248262, held by City of Cleveland
INTERSECTION IMPROVEMENTS AT WEST HIGHTOWER AND ALCOVA DRIVE among its neighbors
15 discharge permits are in the Strouds Creek-Alcovy River subwatershed (HUC 030701030707); GAR248257 is one.
Other permits in the Strouds Creek-Alcovy River subwatershed (HUC 030701030707)
- 300 RIVER COVE MEADOWS DR., Social Circle: GAR39711A, minor, term to 2028-07-31
- ARBOR GLEN, Social Circle: GAR152569, minor, term to 2018-07-31
- LOT 6 RIVER COVE MEADOWS PHASE 2, Social Circle: GAR3972F0, minor, term to 2028-07-31
- NEW CONSTRUCTION HOME, Social Circle: GAR18B661, minor, term to 2028-07-31
- NEW HOME, Social Cirle: GAR18BDDC, minor, term to 2028-07-31
- PI # 0009567, SR 155/CANDLER ROAD, Unknown: GAR245008, minor, term to 2018-07-31
- RIVER COVE BUILD, Covington: GAR3968EC, minor, term to 2028-07-31
- SOCIAL CIRCLE DIALYSIS CENTER, Social Circle: GAR152404, minor, term to 2018-07-31
- WESLYN PARK, Social Circle: GAR395256, minor, term to 2025-01-31
- WESLYN PARK PHASE 2, Social Circle: GAR3975EA, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,997 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | INTERSECTION IMPROVEMENTS AT WEST HIGHTOWER AND ALCOVA DRIVE |
|---|---|
| Permittee | WALTON COUNTY BOARD OF COMMISSIONERS |
| NPDES ID | GAR248257 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | Social Circle, GA |
| Subwatershed | Strouds Creek-Alcovy River (HUC 030701030707) |
| NAICS | 237110 – Water and Sewer Line and Related Structures Construction |
| SIC | 1623 – Water, Sewer, And Utility Lines |
NPDES GAR248257: effluent limits and exceedances
INTERSECTION IMPROVEMENTS AT WEST HIGHTOWER AND ALCOVA DRIVE (NPDES GAR248257): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR248257: no pollutant row on file.
NPDES GAR248257: inspections, violations and enforcement
NPDES GAR248257 (INTERSECTION IMPROVEMENTS AT WEST HIGHTOWER AND ALCOVA DRIVE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR248257
NPDES GAR248257: one email when its EPA record changes — $99/month.
Permits near NPDES GAR248257
NPDES GAR248257: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.