NPDES GAR248327 · Clean Water Act
STATE ROUTE 113 WATER MAIN RELOCATION FROM BROWN ROAD TO WOODBRIDGE ROAD, GA: NPDES GAR248327 discharge permit, effluent exceedances, inspections, penalties
STATE ROUTE 113 WATER MAIN RELOCATION FROM BROWN ROAD TO WOODBRIDGE ROAD, Georgia: General permit coverage GAR248327, held by Bartow County Water Department; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR248327. Bartow County Water Department holds 12 permits in Georgia.
Other permits held by Bartow County Water Department
- BARTOW COUNTY WATER DEPARTMENT (SOUTHEAST WPCP), Cartersville: GA0037664, issued 2020-11-17
- BARTOW COUNTY WATER DEPARTMENT (CLARK CREEK NORTH CAMPGROUND WPCP), Acworth: GA0048305, issued 2014-12-12
- CLINE-SMITH ROAD 2.0 MG RESERVOIR, Cartersville: GAR149532, issued 2013-09-23
- US HWY 411 PUMP STATION, Cartersville: GAR18B875, issued 2023-08-01
- WEST BARTOW WRF, Kingston: GAR18C3A7, issued 2023-08-01
- BARTOW COUNTY WATER SYSTEM IMPROVEMENTS SR 20 UTILITY RELOCATION FROM I-75 TO US, Cartersville: GAR244471, issued 2013-09-24
- BARTOW COUNTY WATER SYSTEM IMPROVEMENTS US HWY 411/SR 61 WATER MAIN NORTH OF HIC: GAR245407, issued 2013-09-23
- BARTOW COUNTY WATER SYSTEM IMPROVEMENTS UTILITY RELOCATION AT US 41/SR 3 & US 41, Cartersville: GAR247140, issued 2013-09-23
- BARTOW COUNTY WATER SYSTEM IMPROVEMENTS HIDDEN VALLEY LANE AND SUNSET DRIVE WATE, Cartersville: GAR247604, issued 2013-09-23
- ACCESS ROAD, COMPOSITE ELEVATED WATER TANK, AND GREAT VALLEY PARKWAY WATER MAIN, White: GAR248582, issued 2013-09-23
Coverages issued nearest GAR248327
- 2013-09-23: SR 141 / PEACHTREE PARKWAY AT PEACHTREE INDUSTRIAL BLVD., Norcross: GAR248320, held by Gwinnett County Department of Transportation
- 2013-09-23: MANCHESTER TO WOODLAND SIDINGS CONNECTION FROM MP ANB 786.2- 779.9- CSX TRANSPOR, Na: GAR248322, held by CSX TRANSPORTATION, INC.
- 2013-09-23: MOUCHET ROAD WATERLINE EXTENSION: GAR248324, held by HART COUNTY WATER AND SEWER AUTHORITY
- 2013-09-23: GDOT PI#0011682 DADE COUNTY: GAR248325, held by Georgia Department of Transportation
- 2013-09-23: PI#0012830 (DOT PROJECT IN BRYAN COUNTY): GAR248326, held by Georgia Department of Transportation
- 2013-09-23: FROG ROAD: GAR248330, held by Henry County Board of Commissioners
- 2013-09-23: THE LAKES AT GREEN VALLEY UTILITY INFRASTRUCTURE PH. III: GAR248332, held by Griffin Spalding Development Authority
- 2013-09-23: ISRP PHASE II - K.0 SUWANEE TO FRIENDSHIP ROAD (PHASE 1 - REVISION): GAR248333, held by Steve Murphy, AGLC
- 2013-09-23: ISRP PHASE II - K.0 SUWANEE TO FRIENDSHIP ROAD (SECTION 3): GAR248334, held by Steve Murphy, AGLC
- 2013-09-23: ISRP PHASE II - K.0 SUWANEE TO FRIENDSHIP ROAD (SECTION 2): GAR248335, held by Steve Murphy, AGLC
STATE ROUTE 113 WATER MAIN RELOCATION FROM BROWN ROAD TO WOODBRIDGE ROAD among its neighbors
39 discharge permits are in the Richland Creek-Etowah River subwatershed (HUC 031501041304); GAR248327 is one.
Other permits in the Richland Creek-Etowah River subwatershed (HUC 031501041304)
- 102 FIBER DR, Cartersville: GAR18B6C4, minor, term to 2028-07-31
- 18 BATES FARM, Cartersville: GAR397062, minor, term to 2028-07-31
- 803 JOE FRANK, Cartersville: GAR18B23D, minor, term to 2028-07-31
- 84 LUMBER - CARTERSVILLE, Cartersville: GAR152670, minor, term to 2018-07-31
- AQUAFIL USA BUILDING ADDITION-BROWN FARM ROAD FACILITY, Cartersville: GAR148505, minor, term to 2018-07-31
- AUTOZONE 10033, Cartersville: GAR18B2F2, minor, term to 2028-07-31
- BARTOW COUNTY FIRE STATION #9, Cartersville: GAR149531, minor, term to 2018-07-31
- BEAKER PROPERTIES II, Cartersville: GAR150300, minor, term to 2018-07-31
- BROWN FARM ROAD, Cartersville: GAR396EC7, minor, term to 2028-07-31
- C.W. CONTRACTING CO., INC. RICK ROSS COMMON FILL SITE, Unknown: GAR147531, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | STATE ROUTE 113 WATER MAIN RELOCATION FROM BROWN ROAD TO WOODBRIDGE ROAD |
|---|---|
| Permittee | Bartow County Water Department |
| NPDES ID | GAR248327 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | GA |
| Subwatershed | Richland Creek-Etowah River (HUC 031501041304) |
NPDES GAR248327: effluent limits and exceedances
STATE ROUTE 113 WATER MAIN RELOCATION FROM BROWN ROAD TO WOODBRIDGE ROAD (NPDES GAR248327): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR248327: no pollutant row on file.
NPDES GAR248327: inspections, violations and enforcement
NPDES GAR248327 (STATE ROUTE 113 WATER MAIN RELOCATION FROM BROWN ROAD TO WOODBRIDGE ROAD): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR248327
NPDES GAR248327: one email when its EPA record changes — $99/month.
Permits near NPDES GAR248327
NPDES GAR248327: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.