NPDES GAR248414 · Clean Water Act
ISRP PHASE II M.O CUMMING LATERAL PIPELINE PROJECT: PHASE 3 OF 3, GA: NPDES GAR248414 discharge permit, effluent exceedances, inspections, penalties
ISRP PHASE II M.O CUMMING LATERAL PIPELINE PROJECT: PHASE 3 OF 3, Georgia: General permit coverage GAR248414, held by Mr. Steve Murphy, Vice President, Engineering, AGLC; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR248414. Mr. Steve Murphy, Vice President, Engineering, AGLC holds 5 permits in Georgia.
Other permits held by Mr. Steve Murphy, Vice President, Engineering, AGLC
- AGLC GILMER SERVICE EXPANSION PHASE 1, Ellijay & East Ellijay: GAR248407, issued 2013-09-23
- ISRP PHASE II - M.O CUMMING LATERAL PIPELINE PROJECT: PHASE 1 OF 3: GAR248411, issued 2013-09-23
- ISRP PHASE II M.O CUMMING LATERAL PIPELINE PROJECT: PHASE 2 OF 3: GAR248413, issued 2013-09-23
- NORTHWEST GEORGIA EXPANSION (NGX) PIPELINE PROJECT: LAYDOWN YARD, Dallas: GAR248517, issued 2013-09-23
Coverages issued nearest GAR248414
- 2013-09-23: LEGEND OAKS LOT -18: GAR248406, held by D.R Horton-Crown, LLC
- 2013-09-23: AGLC GILMER SERVICE EXPANSION PHASE 1, Ellijay & East Ellijay: GAR248407, held by Mr. Steve Murphy, Vice President, Engineering, AGLC
- 2013-09-23: ISRP PHASE II - M.O CUMMING LATERAL PIPELINE PROJECT: PHASE 1 OF 3: GAR248411, held by Mr. Steve Murphy, Vice President, Engineering, AGLC
- 2013-09-23: LITHONIA INDUSTRIAL BOULEVARD EXTENSION - PHASE 3, Lithonia: GAR248412, held by DeKalb Department of Transportation
- 2013-09-23: ISRP PHASE II M.O CUMMING LATERAL PIPELINE PROJECT: PHASE 2 OF 3: GAR248413, held by Mr. Steve Murphy, Vice President, Engineering, AGLC
- 2013-09-23: SSI CDBG15 CITY OF MILLEDGEVILLE, Milledgeville: GAR248416, held by CITY OF MILLEDGEVILLE
- 2013-09-23: TOWN OF TRION WATER SYSTEM IMPROVEMENTS PROJECT NO. 310696, Trion: GAR248417, held by Town of Trion
- 2013-09-23: FLOYD ROAD TRAIL PHASE 2 - D11J0: GAR248418, held by Cobb County Department of Transportation
- 2013-09-23: COLLEGE DRIVE RELOCATION, Dalton: GAR248420, held by City of Dalton Public Works
- 2013-09-23: EAST POINT SIDEWALK DEVELOPMENT - HEADLAND AND DELOWE DRIVE, East Point: GAR248421
ISRP PHASE II M.O CUMMING LATERAL PIPELINE PROJECT: PHASE 3 OF 3 among its neighbors
356 discharge permits are in the Headwaters Big Creek subwatershed (HUC 031300011001); GAR248414 is one. Its county: 25, 2 major; GAR248414 is minor permit.
Other permits in the Headwaters Big Creek subwatershed (HUC 031300011001)
- 0003682 FORSYTH - SR 20 WIDENING, Cumming: GAR2493D7, minor, term to 2025-01-31
- 121690 FORSYTH COUNTY - SR 9 WIDENING, Cumming: GAR2493AE, minor, term to 2025-01-31
- 2615 CANTON HWY, Cumming: GAR18BC46, minor, term to 2028-07-31
- 5385 DREW ROAD, Alpharetta: GAR18B176, minor, term to 2028-07-31
- 6075 POST ROAD, Unknown: GAR153269, minor, term to 2018-07-31
- 6744 MAJOR DR, Cumming: GAR396DD9, minor, term to 2028-07-31
- 7-BREW -- CUMMING, WREN ST, Cumming: GAR3970B5, minor, term to 2028-07-31
- ALDER CREEK - AKA VETERANS MEMORIAL, Cumming: GAR3966D2, minor, term to 2028-07-31
- ALPHA OMEGA, Cumming: GAR18B611, minor, term to 2028-07-31
- AMERICAN BOA INC., Cumming: GAIS10457, minor, term to 2017-05-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ISRP PHASE II M.O CUMMING LATERAL PIPELINE PROJECT: PHASE 3 OF 3 |
|---|---|
| Permittee | Mr. Steve Murphy, Vice President, Engineering, AGLC |
| NPDES ID | GAR248414 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | GA |
| Subwatershed | Headwaters Big Creek (HUC 031300011001) |
NPDES GAR248414: effluent limits and exceedances
ISRP PHASE II M.O CUMMING LATERAL PIPELINE PROJECT: PHASE 3 OF 3 (NPDES GAR248414): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR248414: no pollutant row on file.
NPDES GAR248414: inspections, violations and enforcement
NPDES GAR248414 (ISRP PHASE II M.O CUMMING LATERAL PIPELINE PROJECT: PHASE 3 OF 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR248414
NPDES GAR248414: one email when its EPA record changes — $99/month.
Permits near NPDES GAR248414
NPDES GAR248414: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.