PI 0019451 I-16 AT OLD CUYLER ROAD INTERCHANGE, Ellabell, GA: NPDES GAR254320 discharge permit, effluent exceedances, inspections, penalties
PI 0019451 I-16 AT OLD CUYLER ROAD INTERCHANGE, Ellabell, Georgia: General permit coverage GAR254320, held by C.W. Matthews Contracting Co., Inc.; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028; Water and Sewer Line and Related Structures Construction.
- August 3, 2026: Evaluation (S).
- April 6, 2026: Evaluation (S).
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR254320.
Coverages issued nearest GAR254320
- 2023-08-01: 3128 - POLK CO., AIRPORT RUNWAY CORRECTIONS, Cedartown: GAR254319, held by Polk County
- 2023-08-01: AGL EAST ATHENS REGULATOR STATION PROJECT, Athens: GAR25431A, held by Kevin Gammill
- 2023-08-01: AGRIRAMA LIFT STATION, Tifton: GAR25431C, held by City of Tifton
- 2023-08-01: PLANTATION PINES BUSINESS PARK PH 4, Eatonton: GAR25431D, held by James Jenkins
- 2023-08-01: BARTOW COUNTY- US411 WATER TRANSMISSION MAIN, Cartersville: GAR25431E, held by Bartow County Water Department
- 2023-08-01: STANTON GROVE SEWER EXTENSION, Social Circle: GAR254321, held by Laurie Ashmore
- 2023-08-01: PLANT BRANCH DRIVEWAY IMPROVEMENTS PROJECT, Milledgeville: GAR254322, held by Georgia Power Company
- 2023-08-01: DAVIS ROAD, Sylvester: GAR254323, held by Worth County Board of Commissioners
- 2023-08-01: BARTOW COUNTY CASS PINE LOG PHASE 2, Cartersville: GAR254324, held by Bartow County
- 2023-08-01: MCLEMORE WATER LINE EXTENSION, Chickamauga: GAR254325, held by Walker County Water and Sewerage Authority
PI 0019451 I-16 AT OLD CUYLER ROAD INTERCHANGE among its neighbors
13 discharge permits are in the Little Creek-Black Creek subwatershed (HUC 030602020508); GAR254320 is one.
Other permits in the Little Creek-Black Creek subwatershed (HUC 030602020508)
- BCMS REGIONAL PUMP STATION FORCE MAIN, WATER MAIN, AND GRAVITY SEWER, Ellabel: GAR2544B1, minor, term to 2028-07-31
- GLOVIS CONSOLIDATION CENTER (1CC), Ellabell: GAIS15184, minor, term to 2027-05-31
- GLOVIS VPC (VEHICLE PROCESSING CENTER), Ellabell: GAIS15183, minor, term to 2027-05-31
- HOWARD SHEPPARD - ELLABELL, Ellabell: GAIS14414, minor, term to 2027-05-31
- HYUNDAI STEEL, Ellabell: GAIS15049, minor, term to 2027-05-31
- HYUNDAI TRANSYS SAVANNAH, Ellabell: GAIS15142, minor, term to 2027-05-31
- MAL-SV MODULES, Ellabelle: GAIS14880, minor, term to 2027-05-31
- MOBIS NORTH AMERICA ELECTRIFIED POWER SYSTEMS BATTERY PLANT SAVANNAH, Ellabell: GAIS14891, minor, term to 2027-05-31
- P.I. NO.: 0016618; SR 30/US 280 FROM OLIVE BRANCH RD TO ORACAL PKWY, Ellabell: GAR24934B, minor, term to 2025-01-31
- P.I. NO.: 0019452; I-16 FRONTAGE RD FROM SR 30/US 280 TO EAST OF CR 11/JERNIGAN, Ellabell: GAR2492E2, minor, term to 2025-01-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- Its newest dated event on file is an inspection on August 3, 2026, 72 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 2 inspections.
- EPA's file dates 2 events for it, all in 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PI 0019451 I-16 AT OLD CUYLER ROAD INTERCHANGE |
|---|---|
| Permittee | C.W. Matthews Contracting Co., Inc. |
| NPDES ID | GAR254320 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Ellabell, GA 31308 |
| Subwatershed | Little Creek-Black Creek (HUC 030602020508) |
| NAICS | 237110 – Water and Sewer Line and Related Structures Construction |
| SIC | 1623 – Water, Sewer, And Utility Lines |
NPDES GAR254320: effluent limits and exceedances
PI 0019451 I-16 AT OLD CUYLER ROAD INTERCHANGE (NPDES GAR254320): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR254320: no pollutant row on file.
NPDES GAR254320: inspections, violations and enforcement
NPDES GAR254320: 2 inspections
| Date | What EPA recorded | Agency |
|---|---|---|
| August 3, 2026 | Evaluation | S |
| April 6, 2026 | Evaluation | S |
NPDES GAR254320 (PI 0019451 I-16 AT OLD CUYLER ROAD INTERCHANGE): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR254320
NPDES GAR254320: one email when its EPA record changes — $99/month.
Permits near NPDES GAR254320
NPDES GAR254320: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded October 14, 2026.