NPDES GAR2543C7 · Clean Water Act
PI 0015553 HOUSTON COUNTY, CONSTRUCTION OF BRIDGE ON US 41 / SR 7 / SR 127 OVER, Perry, GA: NPDES GAR2543C7 discharge permit, effluent exceedances, inspections, penalties
PI 0015553 HOUSTON COUNTY, CONSTRUCTION OF BRIDGE ON US 41 / SR 7 / SR 127 OVER, Perry, Georgia: General permit coverage GAR2543C7, held by Georgia Department of Transportation; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
- August 21, 2026: Evaluation (S).
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR2543C7. Georgia Department of Transportation holds 288 permits in Georgia.
Other permits held by Georgia Department of Transportation
- GEORGIA DEPARTMENT OF TRANSPORTATION (REST AREA 53 WPCP), Rutledge: GAG550153, issued 2020-03-06
- GEORGIA DEPARTMENT OF TRANSPORTATION MS4, Atlanta: GAR041001, issued 2017-01-03
- GDOT DISTRICT ADMINISTRATION BUILDING (DOT-055), Tennille: GAR147050, issued 2013-09-23
- C.W. CONTRACTING CO. INC. - DOT WASTE PIT: GAR149101, issued 2013-09-23
- LAKEWOOD PARKWAY GDOT MAINTENANCE HEADQUARTERS, Atlanta: GAR152100, issued 2013-09-23
- DOT-088 DISTRICT 5 ADMINISTRATION BUILDING (WAYNE COUNTY), Jesup: GAR153389, issued 2013-09-23
- DOT-089 DISTRICT 6 ADMINISTRATION BUILDING, Cartersville: GAR153C0A, issued 2018-08-01
- NH-75-2(170)01 & NH-IM-75-2(174)01: GAR212868, issued 2013-09-23
- BRMLB-9004-00(008) PI # 752630, Marietta: GAR229371, issued 2013-09-23
- EDS00-0545-00(018) PI #221910, Emanuel: GAR232344, issued 2013-09-23
Coverages issued nearest GAR2543C7
- 2023-08-01: 2025 PRESSURE IMPROVEMENTS- ROYSTON, Royston: GAR2543C1, held by CITY OF ROYSTON
- 2023-08-01: I-85 @ MCGINNIS FERRY ROAD STOCKPILE AREA, Suwanee: GAR2543C2, held by CMES, Inc
- 2023-08-01: MINTER DRIVE GRAVITY SEWER, Hampton: GAR2543C3, held by Minter Holdings LLC
- 2023-08-01: ST. MARYS ROAD INTRESECTIONS, St. Marys: GAR2543C5, held by City of St. Marys
- 2023-08-01: QUACCO ROAD IMPROVEMENT PROJECT FROM WINDING WAY TO INTERSTATE 95, Savannah: GAR2543C6, held by Chatham County
- 2023-08-01: PI 0013804 BULLOCH EFFINGHAM, 2 BRIDGES ON SR 119 OVER OGEECHEE RIVER AND OGEECH, Brooklet: GAR2543C8, held by Georgia Department of Transportation
- 2023-08-01: PI 0016112 SUMTER COUNTY, ROUNDABOUT ON SR 30 AT LAMAR RD / PECAN RD, Cobb: GAR2543C9, held by Georgia Department of Transportation
- 2023-08-01: PI 0015114 BULLOCH COUNTY, WIDENING FOR PASSING LANES ON US 301 / SR 73 SOUTH OF, Statesboro: GAR2543CA, held by Georgia Department of Transportation
- 2023-08-01: PI 0016116 PICKENS COUNTY, ROUNDABOUT ON SR 53 BU AT DRAGON DRIVE, Jasper: GAR2543CB, held by Georgia Department of Transportation
- 2023-08-01: PI 422390 CLINCH COUNTY, WIDENING OF US 441 / SR 89 FROM ORANGE ST TO N OF SR 12, Homerville: GAR2543CD, held by Georgia Department of Transportation
PI 0015553 HOUSTON COUNTY, CONSTRUCTION OF BRIDGE ON US 41 / SR 7 / SR 127 OVER among its neighbors
28 discharge permits are in the Bay Creek subwatershed (HUC 030701040202); GAR2543C7 is one.
Other permits in the Bay Creek subwatershed (HUC 030701040202)
- 105 PINE BOUGH TRAIL, Perry: GAR396842, minor, term to 2028-07-31
- 127 CANTER DR PERRY GA, Perry: GAR396EEB, minor, term to 2028-07-31
- ANDEL ROAD IMPROVEMENTS, Perry: GAR18B19B, minor, term to 2028-07-31
- BLUE BIRD BODY CO., Fort Valley: GAR153CE1, minor, term to 2023-07-31
- BLUE BIRD CORPORATION, Fort Valley: GAR18BD9A, minor, term to 2028-07-31
- CITY OF FORT VALLEY, Ft. Valley: GAL031046, minor, term to 2025-12-31
- CITY OF PERRY MS4, Perry: GAG610081, minor, term to 2022-12-05
- EROSION CONTROL PLAN FOR 105 WALTON CHASE, Perry: GAR394BA4, minor, term to 2028-07-31
- FORT VALLEY ARMY RESERVE CENTER GA030, Fort Valley: GAIS14528, minor, term to 2027-05-31
- GUARDIAN CENTERS, Perry: GAR152285, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- Its newest dated event on file is an inspection on August 21, 2026, 25 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PI 0015553 HOUSTON COUNTY, CONSTRUCTION OF BRIDGE ON US 41 / SR 7 / SR 127 OVER |
|---|---|
| Permittee | Georgia Department of Transportation |
| NPDES ID | GAR2543C7 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Perry, GA 31069 |
| Subwatershed | Bay Creek (HUC 030701040202) |
NPDES GAR2543C7: effluent limits and exceedances
PI 0015553 HOUSTON COUNTY, CONSTRUCTION OF BRIDGE ON US 41 / SR 7 / SR 127 OVER (NPDES GAR2543C7): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR2543C7: no pollutant row on file.
NPDES GAR2543C7: inspections, violations and enforcement
NPDES GAR2543C7: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| August 21, 2026 | Evaluation | S |
NPDES GAR2543C7 (PI 0015553 HOUSTON COUNTY, CONSTRUCTION OF BRIDGE ON US 41 / SR 7 / SR 127 OVER): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR2543C7
NPDES GAR2543C7: one email when its EPA record changes — $99/month.
Permits near NPDES GAR2543C7
NPDES GAR2543C7: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.