MID-STATE ENERGY, Byron, Georgia: General permit coverage GAR25447E, held by Wayne James; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028; Water and Sewer Line and Related Structures Construction.
- October 30, 2026: Evaluation (S).
- June 10, 2026: Evaluation (S).
- March 26, 2026: Evaluation (S).
- February 17, 2026: State Administrative Order of Consent (State), $2,000 state or local penalty.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR25447E. Wayne James holds 2 permits in Georgia.
Other permits held by Wayne James
- MID-STATE ENERGY, Byron: GAR25447F, issued 2023-08-01
Coverages issued nearest GAR25447E
- 2023-08-01: PI 0013539 WARE, CONSTRUCTION OF A BRIDGE ON US 1 BUS/US 23 BUS/ SR 4 BUS OVER C, Waycross: GAR254479, held by Georgia Department of Transportation
- 2023-08-01: BELLS FERRY ROAD AT LITTLE RIVER BRIDGE WATER & SANITARY SEWER RELOCATION, Woodstock: GAR25447A, held by Unity Construction Co., Inc.
- 2023-08-01: BELLS FERRY ROAD AT LITTLE RIVER BRIDGE WATER & SANITARY SEWER RELOCATION, Woodstock: GAR25447B, held by Unity Construction Co., Inc.
- 2023-08-01: BASS JUNCTION TO GRIFFIN CROSSOVER LOCATION C, Juliette: GAR25447C, held by James Bray
- 2023-08-01: ROCK CREEK INTAKE PIPING PHASE B, Auburn: GAR25447D, held by City of Auburn
- 2023-08-01: MID-STATE ENERGY, Byron: GAR25447F, held by Wayne James
- 2023-08-01: BRANCH GOSHEN 230KV TL P79457, Gibson: GAR254480, held by John Raese
- 2023-08-01: F-1256-05 STANLEY RD AT SR 8 / US 29 / WINDER HIGHWAY ROADWAY IMPROVEMENT PROJEC, Dacula: GAR254481, held by Gwinnett County
- 2023-08-01: P91007- RUMBLE ROAD LOOP, Forsyth: GAR254482, held by John Raese
- 2023-08-01: EAST COLQUITT 115KV SUBSTATION, Colquitt: GAR254483, held by John Raese
MID-STATE ENERGY among its neighbors
123 discharge permits are in the Sandy Run Creek subwatershed (HUC 030701040102); GAR25447E is one.
Other permits in the Sandy Run Creek subwatershed (HUC 030701040102)
- 100 STILLWATER CIRCLE, LOT 1, Warner Robins: GAR351439, minor, term to 2018-07-31
- A NEW ACCESS ROAD FOR DR. RYAN DAVIS, Warner Robins: GAR153688, minor, term to 2018-07-31
- ADIYOGI 99 LLC, Warner Robins: GAR18B51E, minor, term to 2028-07-31
- AMERICAN TIRE DISTRIBUTORS- (PEACH CO.), Unknown: GAR149942, minor, term to 2018-07-31
- AYDIN HEIGHTS, Centerville: GAR378729, minor, term to 2018-07-31
- AYDIN HEIGHTS- (PRI/SERV), Centerville: GAR378856, minor, term to 2018-07-31
- BLDG EXPANSION AT PURE FLAVOR SE DISTRIBUTION CENTER, Byron: GAR18C17E, minor, term to 2028-07-31
- BOULDER WALK, Warner Robins: GAR349358, minor, term to 2018-07-31
- BOULDER WALK (DURGIN DR.), Warner Robins: GAR349316, minor, term to 2018-07-31
- BUSINESS DEVELOPMENT, Warner Robins: GAR150972, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- Its newest dated event on file is an inspection on October 30, 2026.
- In the 365 days to October 14, 2026, it was dated 2 inspections, 1 formal enforcement action.
- EPA's file dates 4 events for it, all in 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | MID-STATE ENERGY |
|---|---|
| Permittee | Wayne James |
| NPDES ID | GAR25447E |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Byron, GA 31008 |
| Subwatershed | Sandy Run Creek (HUC 030701040102) |
| NAICS | 237110 – Water and Sewer Line and Related Structures Construction |
| SIC | 1623 – Water, Sewer, And Utility Lines |
NPDES GAR25447E: effluent limits and exceedances
MID-STATE ENERGY (NPDES GAR25447E): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR25447E: no pollutant row on file.
NPDES GAR25447E: inspections, violations and enforcement
NPDES GAR25447E: 3 inspections
| Date | What EPA recorded | Agency |
|---|---|---|
| October 30, 2026 | Evaluation | S |
| June 10, 2026 | Evaluation | S |
| March 26, 2026 | Evaluation | S |
NPDES GAR25447E: 1 formal enforcement action
1 of them with a penalty assessed. How penalties are shown.
| Date | What EPA recorded | Agency | Federal penalty | State or local penalty |
|---|---|---|---|---|
| February 17, 2026 | State Administrative Order of Consent | State | $2,000 |
NPDES GAR25447E (MID-STATE ENERGY): no single-event violation and informal enforcement action on file.
Watch NPDES GAR25447E
NPDES GAR25447E: one email when its EPA record changes — $99/month.
Permits near NPDES GAR25447E
NPDES GAR25447E: 0 pollutant rows, 4 dated events; ICIS-NPDES download, loaded October 14, 2026.