NPDES GAR354067 · Clean Water Act
THE SUMMIT AT STONEWALL TELL PHASE 4, East Point, GA: NPDES GAR354067 discharge permit, effluent exceedances, inspections, penalties
THE SUMMIT AT STONEWALL TELL PHASE 4, East Point, Georgia: General permit coverage GAR354067, held by D.R. Horton, Inc.; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018; New Single-Family Housing Construction [except For-Sale Builders].
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR354067. D.R. Horton, Inc. holds 76 permits in Georgia.
Other permits held by D.R. Horton, Inc.
- TULIP TREE PLANTATION FKA TULIP PLANTATION, Alpharetta: GAR343173, issued 2013-09-23
- VICKERY OAKS PHASE 1, Cumming: GAR344203, issued 2013-09-23
- OLD ATLANTA ROAD: GAR344472, issued 2013-09-23
- STERLING ON THE LAKE - POD N - LOT 14: GAR346931, issued 2013-09-23
- WINDSOR CREEK, Conyers: GAR347865, issued 2013-09-23
- STERLING ON THE LAKE - POD N - LOT 31, Flowery Branch: GAR347897, issued 2013-09-23
- STERLING ON THE LAKE - POD N - LOT 57, Flowery Branch: GAR347999, issued 2013-09-23
- SETTLERS' LAKE LOTS 283-288, 304-309, 355 & 356, Cumming: GAR350077, issued 2013-09-23
- WATERS LAKE LOTS 8,18,29, & 32, Canton: GAR350078, issued 2013-09-23
- STERLING ON THE LAKE - POD N - LOT 55, Flowery Branch: GAR351784, issued 2013-09-23
Coverages issued nearest GAR354067
- 2013-09-23: BUCKHEAD EAST - LOT G-58: GAR354060, held by Mungo Homes
- 2013-09-23: BUCKHEAD EAST - LOT-74: GAR354061, held by EAST BUCKHEAD, LLC
- 2013-09-23: RIVERSIDE MANOR, Buford: GAR354062, held by Kerely Family Homes
- 2013-09-23: EASTWYKE - PHASE II, Snellville: GAR354064
- 2013-09-23: LAUREL RIDGE LOT 43 O, Na: GAR354066, held by CPJ Custom Homes, LLC
- 2013-09-23: BROOKHAVEN WALK, Brookhaven: GAR354069, held by FM Brookhaven, LLC
- 2013-09-23: MOBACORP: GAR354070, held by Mobacorp
- 2013-09-23: PHILLIPS CROSSING, SECTION 2: GAR354071, held by Prather Construction
- 2013-09-23: LOT 1 BARTLES FARM SECTION II, Appling: GAR354074, held by Don Burch
- 2013-09-23: THE RIDGES @ RIVERWOOD WEST PHASE 2 - LOT 65, Evans: GAR354077, held by PDH Builders Inc.
THE SUMMIT AT STONEWALL TELL PHASE 4 among its neighbors
566 discharge permits are in the Camp Creek subwatershed (HUC 031300020301); GAR354067 is one.
Other permits in the Camp Creek subwatershed (HUC 031300020301)
- 2750 SULLIVAN ROAD, Atlanta: GAR149842, minor, term to 2018-07-31
- 4601 WELCOME ALL RD, South Fulton: GAR18AE77, minor, term to 2025-01-31
- 4900 NORTH COMMERCE DRIVE, East Point: GAR153D4E, minor, term to 2023-07-31
- AEROTROPOLIS WEST, College Parl: GAR153A7D, minor, term to 2018-07-31
- AIRPORT ROAD 16 INCH WATER MAIN, Unknown: GAR248075, minor, term to 2018-07-31
- ALOFT/ELEMENT DUAL BRAND HOTEL, College Park: GAR18C157, minor, term to 2028-07-31
- ALTERA BEN HILL, Atlanta: GAR18AFBC, minor, term to 2025-01-31
- ARBOR WOODS LOT 28 (BARROW COUNTY), Unknown: GAR380371, minor, term to 2018-07-31
- ASHFORD RIDGE, Atlanta: GAR3970C4, minor, term to 2028-07-31
- ATL11, Atlanta: GAR18AFDF, minor, term to 2025-01-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,997 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE SUMMIT AT STONEWALL TELL PHASE 4 |
|---|---|
| Permittee | D.R. Horton, Inc. |
| NPDES ID | GAR354067 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | East Point, GA |
| Subwatershed | Camp Creek (HUC 031300020301) |
| NAICS | 236115 – New Single-Family Housing Construction [except For-Sale Builders] |
| SIC | 1521 – Single-Family Housing Construction |
NPDES GAR354067: effluent limits and exceedances
THE SUMMIT AT STONEWALL TELL PHASE 4 (NPDES GAR354067): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR354067: no pollutant row on file.
NPDES GAR354067: inspections, violations and enforcement
NPDES GAR354067 (THE SUMMIT AT STONEWALL TELL PHASE 4): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR354067
NPDES GAR354067: one email when its EPA record changes — $99/month.
Permits near NPDES GAR354067
NPDES GAR354067: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.