NPDES GAR355545 · Clean Water Act
SUMMIT AT WEST RIDGE PHASE 1, Dallas, GA: NPDES GAR355545 discharge permit, effluent exceedances, inspections, penalties
SUMMIT AT WEST RIDGE PHASE 1, Dallas, Georgia: General permit coverage GAR355545, held by Silverstone Residential; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR355545. Silverstone Residential holds 67 permits in Georgia.
Other permits held by Silverstone Residential
- RESERVES AT TIMBERLAND LOT 85: GAR358733, issued 2013-09-23
- RESERVES AT TIMBERLAND LOT 49: GAR358735, issued 2013-09-23
- RESERVES AT TIMBERLAND LOT 52: GAR358738, issued 2013-09-23
- RESERVES AT TIMBERLAND LOT 97: GAR358739, issued 2013-09-23
- SOMERSET LOT 152, Dallas: GAR361627, issued 2013-09-23
- SOMERSET LOT 150, Dallas: GAR361628, issued 2013-09-23
- SOMERSET LOT 149, Dallas: GAR361630, issued 2013-09-23
- SOMERSET LOT 148, Dallas: GAR361631, issued 2013-09-23
- SOMERSET LOT 145, Dallas: GAR361632, issued 2013-09-23
- SOMERSET LOT 144, Dallas: GAR361634, issued 2013-09-23
Coverages issued nearest GAR355545
- 2013-09-23: THE VILLAGE AT BLACKWELL CREEK (FKA WHISPERING CREEK S/D), Jasper: GAR355531, held by Bruce & Burkett LLC
- 2013-09-23: STERLING ON THE LAKE - LOT 12S, Flowery Branch: GAR355533, held by Harcrest Homes
- 2013-09-23: SCENIC FALLS OF BRASELTON - PHASE ONE - LOTS 48A, 49A, 50A, 51A: GAR355534, held by Property Services, Inc.
- 2013-09-23: SPENCER / KESSLER SITE - PCO141 - PARROTT'S COVE - REYNOLDS PLANTATION - LOT 141: GAR355540, held by James Spencer and Deborah Kessler
- 2013-09-23: HAWK CREEK - LOT 41: GAR355542, held by Pilar Torres
- 2013-09-23: LONG SHADOW LOT 1, Alpharetta: GAR355546, held by Crystal Carter
- 2013-09-23: BEMISS LANDING SUBDIVISION LOT # 49, Valdosta: GAR355553, held by HOMETOWN CONSTRUCTION COMPANY, LLC
- 2013-09-23: WOODLIEF SECTION 3 - LOT 19E, Evans: GAR355556, held by Bill Beazley Homes, Inc.
- 2013-09-23: WOODLIEF SECTION 3 - LOT 35A, Evans: GAR355557, held by Bill Beazley Homes, Inc.
- 2013-09-23: WOODLIEF SECTION 3 - LOT 36A, Evans: GAR355558, held by Bill Beazley Homes, Inc.
SUMMIT AT WEST RIDGE PHASE 1 among its neighbors
382 discharge permits are in the Possum Creek subwatershed (HUC 031501041104); GAR355545 is one.
Other permits in the Possum Creek subwatershed (HUC 031501041104)
- 147 SUMMER LAKE COVE, Dallas: GAR18BAD5, minor, term to 2028-07-31
- 222 ALEXIS DRIVE, Dallas: GAR18B4FF, minor, term to 2028-07-31
- 52 TURTLE ROCK PL, Dallas: GAR3970E2, minor, term to 2028-07-31
- 530 PICKETTS MILL RD, Dallas: GAR18C0EB, minor, term to 2028-07-31
- 73 CEDAR MILL, Dallas: GAR397212, minor, term to 2028-07-31
- 74 CEDAR MILL, Dallas: GAR397216, minor, term to 2028-07-31
- 75 CEDAR MILL, Dallas: GAR397218, minor, term to 2028-07-31
- 76 CEDAR MILL, Dallas: GAR397213, minor, term to 2028-07-31
- 77 CEDAR MILL, Dallas: GAR39721A, minor, term to 2028-07-31
- ALEXANDRIA PLACE LOT 34, Dallas: GAR365164, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SUMMIT AT WEST RIDGE PHASE 1 |
|---|---|
| Permittee | Silverstone Residential |
| NPDES ID | GAR355545 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | Dallas, GA 30132 |
| Subwatershed | Possum Creek (HUC 031501041104) |
NPDES GAR355545: effluent limits and exceedances
SUMMIT AT WEST RIDGE PHASE 1 (NPDES GAR355545): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR355545: no pollutant row on file.
NPDES GAR355545: inspections, violations and enforcement
NPDES GAR355545 (SUMMIT AT WEST RIDGE PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR355545
NPDES GAR355545: one email when its EPA record changes — $99/month.
Permits near NPDES GAR355545
NPDES GAR355545: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.