NPDES GAR359471 · Clean Water Act
TIMBERLAND PHASE 4, LOT 430, Waverly Hall, GA: NPDES GAR359471 discharge permit, effluent exceedances, inspections, penalties
TIMBERLAND PHASE 4, LOT 430, Waverly Hall, Georgia: General permit coverage GAR359471, held by David McEldoon Builders, Inc.; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR359471. David McEldoon Builders, Inc. holds 3 permits in Georgia.
Other permits held by David McEldoon Builders, Inc.
- PALMETTO CREEK LANE, LOT 15, Na: GAR352224, issued 2013-09-23
- TIMBERLAND PHASE 4, LOT 428, Waverly Hall: GAR359460, issued 2013-09-23
Coverages issued nearest GAR359471
- 2013-09-23: CREEKSIDE VILLAGE - LOT 45, Hoschton: GAR359465, held by Lumpkin Street Holdings, LLC
- 2013-09-23: CREEKSIDE VILLAGE - LOT 46, Hoschton: GAR359466, held by Lumpkin Street Holdings, LLC
- 2013-09-23: CREEKSIDE VILLAGE - LOT 47, Hoschton: GAR359468, held by Lumpkin Street Holdings, LLC
- 2013-09-23: CREEKSIDE VILLAGE - LOT 48, Hoschton: GAR359469, held by Lumpkin Street Holdings, LLC
- 2013-09-23: CREEKSIDE VILLAGE - LOT 49, Hoschton: GAR359470, held by Lumpkin Street Holdings, LLC
- 2013-09-23: CREEKSIDE VILLAGE - LOT 50, Hoschton: GAR359472, held by Lumpkin Street Holdings, LLC
- 2013-09-23: SWEETBAY- OAKS, LOT 5, Hamilton: GAR359473, held by Edgar Hughston Builder
- 2013-09-23: CREEKSIDE VILLAGE - LOT 57, Hoschton: GAR359475, held by Lumpkin Street Holdings, LLC
- 2013-09-23: CREEKSIDE VILLAGE - LOT 58, Hoschton: GAR359476, held by Lumpkin Street Holdings, LLC
- 2013-09-23: BALDWIN PLACE - LOT 10, Grovetown: GAR359480, held by Park Ridge Builders
Other permits in Waverly Hall
- ABBERLY LAKES PH 3, LOT 43, Waverly Hall: GAR377896, minor, term to 2018-07-31
- ABBERLY LAKES PHASE , LOT 44, Waverly Hall: GAR377756, minor, term to 2018-07-31
- ABBERLY LAKES PHASE 3, Waverly Hall: GAR356760, minor, term to 2018-07-31
- ABBERLY LAKES PHASE 3, LOT 45, Waverly Hall: GAR377902, minor, term to 2018-07-31
- CLAUDETTE COURT- TIMBERLAND SECTION 4, Waverly Hall: GAR358314, minor, term to 2018-07-31
- ELLERSLIE PLACE SECTION 5, LOT 558, Waverly Hall: GAR376673, minor, term to 2018-07-31
- ELLERSLIE PLACE, AUTUMN TRAIL DR., LOT 43 BLK E, Waverly Hall: GAR353160, minor, term to 2018-07-31
- ELLERSLIE PLACE, LOT 18C, Waverly Hall: GAR353023, minor, term to 2018-07-31
- ELLERSLIE PLACE, LOT 2 BLOCK E SECTION 4, Waverly Hall: GAR353161, minor, term to 2018-07-31
- ELLERSLIE PLACE, LOT 4, Waverly Hall: GAR361526, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TIMBERLAND PHASE 4, LOT 430 |
|---|---|
| Permittee | David McEldoon Builders, Inc. |
| NPDES ID | GAR359471 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | Waverly Hall, GA |
NPDES GAR359471: effluent limits and exceedances
TIMBERLAND PHASE 4, LOT 430 (NPDES GAR359471): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR359471: no pollutant row on file.
NPDES GAR359471: inspections, violations and enforcement
NPDES GAR359471 (TIMBERLAND PHASE 4, LOT 430): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR359471
NPDES GAR359471: one email when its EPA record changes — $99/month.
Permits near NPDES GAR359471
NPDES GAR359471: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.