NPDES GAR361494 · Clean Water Act
SOUTHAVEN LOT 35, Ellerslie, GA: NPDES GAR361494 discharge permit, effluent exceedances, inspections, penalties
SOUTHAVEN LOT 35, Ellerslie, Georgia: General permit coverage GAR361494, held by Adam Sizemore; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR361494. Adam Sizemore holds 4 permits in Georgia.
Other permits held by Adam Sizemore
- SOUTHAVEN, LOT 33, Ellerslie: GAR361499, issued 2013-09-23
- SOUTHAVEN, LOT 36, Ellerslie: GAR361521, issued 2013-09-23
- SOUTHAVEN, LOT 34, Ellerslie: GAR361524, issued 2013-09-23
Coverages issued nearest GAR361494
- 2013-09-23: SAWGRASS ESTATES PHASE III, LOT 5, Lovejoy: GAR361486, held by DR Horton Atlanta
- 2013-09-23: SAWGRASS ESTATES PHASE III, LOT 8, Lovejoy: GAR361488, held by DR Horton Atlanta
- 2013-09-23: SAWGRASS ESTATES PHASE III, LOT 15, Lovejoy: GAR361490, held by DR Horton Atlanta
- 2013-09-23: SAWGRASS ESTATES PHASE III, LOT 16, Lovejoy: GAR361491, held by DR Horton Atlanta
- 2013-09-23: SAWGRASS ESTATES PHASE III, LOT 17, Lovejoy: GAR361492, held by DR Horton Atlanta
- 2013-09-23: SAWGRASS ESTATES, PHASSE III, LOT 18, Lovejoy: GAR361495, held by DR Horton Atlanta
- 2013-09-23: WHISPERING LAKE, LOT 106, Cumming: GAR361496, held by Crown Communities, Inc
- 2013-09-23: SAWGRASS ESTATES LOT 140, Lovejoy: GAR361497, held by DR Horton, Inc.
- 2013-09-23: SAWGRASS ESTATES PHASE I, LOT 164, Lovejoy: GAR361498, held by DR Horton Atlanta
- 2013-09-23: SOUTHAVEN, LOT 33, Ellerslie: GAR361499, held by Adam Sizemore
SOUTHAVEN LOT 35 among its neighbors
19 discharge permits are in the Upper Randall Creek subwatershed (HUC 031300030303); GAR361494 is one.
Other permits in the Upper Randall Creek subwatershed (HUC 031300030303)
- ABBERLY LAKES SUBDIVISION PHASE 2, Na: GAR353941, minor, term to 2018-07-31
- MOUNTAIN VIEW ROAD, Midland: GAR396A86, minor, term to 2028-07-31
- NEW WORSHIP FACLITY, Midland: GAR18B990, minor, term to 2028-07-31
- P&W POND RP-2 AND RP-3 IMPROVEMENTS, Columbus: GAR152808, minor, term to 2018-07-31
- PROPOSED WORSHIP FACILITY FOR RIVER OF COLUMBUS, Midland: GAR149214, minor, term to 2018-07-31
- ROLLING FARM WAY PARCEL B-1, Midland: GAR349342, minor, term to 2018-07-31
- SOUTHAVEN, LOT 14, Waverly Hall: GAR354220, minor, term to 2018-07-31
- SOUTHAVEN, LOT 33, Ellerslie: GAR361499, minor, term to 2018-07-31
- SOUTHAVEN, LOT 34, Ellerslie: GAR361524, minor, term to 2018-07-31
- SOUTHAVEN, LOT 36, Ellerslie: GAR361521, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SOUTHAVEN LOT 35 |
|---|---|
| Permittee | Adam Sizemore |
| NPDES ID | GAR361494 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | Ellerslie, GA |
| Subwatershed | Upper Randall Creek (HUC 031300030303) |
NPDES GAR361494: effluent limits and exceedances
SOUTHAVEN LOT 35 (NPDES GAR361494): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR361494: no pollutant row on file.
NPDES GAR361494: inspections, violations and enforcement
NPDES GAR361494 (SOUTHAVEN LOT 35): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR361494
NPDES GAR361494: one email when its EPA record changes — $99/month.
Permits near NPDES GAR361494
NPDES GAR361494: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.