NPDES GAR365946 · Clean Water Act
RIVER VISTA ESTATES PHASE 3 - LOT - 63, Atlanta, GA: NPDES GAR365946 discharge permit, effluent exceedances, inspections, penalties
RIVER VISTA ESTATES PHASE 3 - LOT - 63, Atlanta, Georgia: General permit coverage GAR365946, held by Meritage Homes of Georgia; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR365946. Meritage Homes of Georgia holds 263 permits in Georgia.
Other permits held by Meritage Homes of Georgia
- MIRROR LAKE LOT -80, Villa Rica: GAR248254, issued 2013-09-23
- SOUTH WIND LOT 53 - PREVIOUSLY FILED AS 5340, Union City: GAR248514, issued 2013-09-23
- HOPEWELL MANOR PHASE II LOT 133: GAR350454, issued 2013-09-23
- CARTER GROVE PLANTATION PHASE 1 LOT A1003, A1011, B1094, B1095, J1353, J1356, Cartersville: GAR351115, issued 2013-09-23
- SPRINGBROOKE ESTATES PHASE 1 LOT 185, Powder Springs: GAR351170, issued 2013-09-23
- DAWSON POINTE LOT 16, Dawsonville: GAR351291, issued 2013-09-23
- HOPEWELL MANOR PHASE II LOT 114: GAR351299, issued 2013-09-23
- MARTINS CROSSING (FKA CHEATHAM HILL), Douglasville: GAR352792, issued 2013-09-23
- HOPEWELL MANOR PHASE II LOT 148, Douglasville: GAR354355, issued 2013-09-23
- HOPEWELL MANOR PHASE II LOT 121, Douglasville: GAR354356, issued 2013-09-23
Coverages issued nearest GAR365946
- 2013-09-23: RIVER VISTA ESTATES PHASE 3 - LOT -28, Ellenwood: GAR365941, held by B.K Residential
- 2013-09-23: PEPPERHILL ESTATES PHASE 4 - LOT 205: GAR365942, held by Dr Horton - Crown LLC
- 2013-09-23: PEPPERHILL ESTATES PHASE 4 - LOT 206: GAR365943, held by Dr Horton - Crown LLC
- 2013-09-23: PEPPERHILL ESTATES PHASE 4 - LOT 207: GAR365944, held by Dr Horton - Crown LLC
- 2013-09-23: PEPPERHILL ESTATES PHASE 4 - LOT 208: GAR365945, held by Dr Horton - Crown LLC
- 2013-09-23: RIVER VISTA ESTATES PHASE 4 - LOT - 13, N/A: GAR365947, held by B.K Residential
- 2013-09-23: RIVER VISTAT ESTATES- PHASE 4 - LOT - 19, Douglasville: GAR365948, held by BK Residential
- 2013-09-23: OAK GLEN LOT 62, Dallas: GAR365952, held by Kerley Family Home
- 2013-09-23: MUNDY'S OVERLOOK LOT 1: GAR365955, held by Peachree Communities, LLC
- 2013-09-23: MUNDY'S OVERLOOK LOT 3: GAR365956, held by Peachtree Communities, LLC
RIVER VISTA ESTATES PHASE 3 - LOT - 63 among its neighbors
163 discharge permits are in the Pole Bridge Creek-South River subwatershed (HUC 030701030105); GAR365946 is one.
Other permits in the Pole Bridge Creek-South River subwatershed (HUC 030701030105)
- 0 COOK DRIVE, Ellenwood: GAR397272, minor, term to 2028-07-31
- 413 SAINT SURREY WAY, Ellenwood: GAR18C18D, minor, term to 2028-07-31
- 5432 HEARN RD, Ellenwood: GAR18B3B5, minor, term to 2028-07-31
- 6215 HIGHWAY 155 NORTH, Stockbridge: GAR18BE3C, minor, term to 2028-07-31
- ADDISON GLEN LOT 1, N/A: GAR368864, minor, term to 2018-07-31
- AMP ROBOTICS, Lithonia: GAIS14502, minor, term to 2027-05-31
- CENTURY COOMMUNTIES - LOT 98, Unknown: GAR365205, minor, term to 2018-07-31
- CHAPEL RIDGE, Ellenwood: GAR18B39E, minor, term to 2028-07-31
- CHAPEL RIDGE ESTATES LOT 75, Ellenwood: GAR39591B, minor, term to 2028-07-31
- CHAPEL RIDGE ESTATES UNIT 2 LOT 61, Ellenwood: GAR395919, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | RIVER VISTA ESTATES PHASE 3 - LOT - 63 |
|---|---|
| Permittee | Meritage Homes of Georgia |
| NPDES ID | GAR365946 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | Atlanta, GA 30339 |
| Subwatershed | Pole Bridge Creek-South River (HUC 030701030105) |
NPDES GAR365946: effluent limits and exceedances
RIVER VISTA ESTATES PHASE 3 - LOT - 63 (NPDES GAR365946): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR365946: no pollutant row on file.
NPDES GAR365946: inspections, violations and enforcement
NPDES GAR365946 (RIVER VISTA ESTATES PHASE 3 - LOT - 63): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR365946
NPDES GAR365946: one email when its EPA record changes — $99/month.
Permits near NPDES GAR365946
NPDES GAR365946: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.