NPDES GAR366053 · Clean Water Act
RIVER VISTA ESTATES- PHASE 4 -LOT- 76, Dekalb, GA: NPDES GAR366053 discharge permit, effluent exceedances, inspections, penalties
RIVER VISTA ESTATES- PHASE 4 -LOT- 76, Dekalb, Georgia: General permit coverage GAR366053, held by BK Residential; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR366053. BK Residential holds 2 permits in Georgia.
Other permits held by BK Residential
- RIVER VISTAT ESTATES- PHASE 4 - LOT - 19, Douglasville: GAR365948, issued 2013-09-23
Coverages issued nearest GAR366053
- 2013-09-23: RIVER VISTA ESTATES PHASE 4 - LOT - 73, N/A: GAR366047, held by B. K Residential
- 2013-09-23: RIVER VISTA ESTATES PHASE 4 -LOT - 74, N/A: GAR366048, held by B. K Residential
- 2013-09-23: PEPPERHILL ESTATES PHASE 4 - LOT 177: GAR366049, held by Dr Horton - Crown LLC
- 2013-09-23: BARRETT LANDING PHASE 2 LOT 21, Cumming: GAR366051, held by Fischer Homes
- 2013-09-23: SCOUT TRACE SUBDIVISION LOT 42, Blairsville: GAR366052, held by Solomon Patrick
- 2013-09-23: COBBLESTONE FARMS LOT 115, Cumming: GAR366054, held by Meritage Homes of Georgia
- 2013-09-23: RIVER VISTA ESTATES - PHASE 4- LOT- 78, Ellenwood: GAR366055, held by BK Residential
- 2013-09-23: RIVER VISTA ESTATES PHASE 4- LOT- 80, N/A: GAR366056, held by B. K Residential
- 2013-09-23: RIVER VISTA ESTATES- LOT- 82, N/A: GAR366057, held by Meritage Homes Georgia
- 2013-09-23: RIVER VISTA ESTATES PHASE 4- LOT - 87, Ellenwood: GAR366058, held by B.K Residential
RIVER VISTA ESTATES- PHASE 4 -LOT- 76 among its neighbors
163 discharge permits are in the Pole Bridge Creek-South River subwatershed (HUC 030701030105); GAR366053 is one.
Other permits in the Pole Bridge Creek-South River subwatershed (HUC 030701030105)
- 0 COOK DRIVE, Ellenwood: GAR397272, minor, term to 2028-07-31
- 413 SAINT SURREY WAY, Ellenwood: GAR18C18D, minor, term to 2028-07-31
- 5432 HEARN RD, Ellenwood: GAR18B3B5, minor, term to 2028-07-31
- 6215 HIGHWAY 155 NORTH, Stockbridge: GAR18BE3C, minor, term to 2028-07-31
- ADDISON GLEN LOT 1, N/A: GAR368864, minor, term to 2018-07-31
- AMP ROBOTICS, Lithonia: GAIS14502, minor, term to 2027-05-31
- CENTURY COOMMUNTIES - LOT 98, Unknown: GAR365205, minor, term to 2018-07-31
- CHAPEL RIDGE, Ellenwood: GAR18B39E, minor, term to 2028-07-31
- CHAPEL RIDGE ESTATES LOT 75, Ellenwood: GAR39591B, minor, term to 2028-07-31
- CHAPEL RIDGE ESTATES UNIT 2 LOT 61, Ellenwood: GAR395919, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | RIVER VISTA ESTATES- PHASE 4 -LOT- 76 |
|---|---|
| Permittee | BK Residential |
| NPDES ID | GAR366053 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | Dekalb, GA |
| Subwatershed | Pole Bridge Creek-South River (HUC 030701030105) |
NPDES GAR366053: effluent limits and exceedances
RIVER VISTA ESTATES- PHASE 4 -LOT- 76 (NPDES GAR366053): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR366053: no pollutant row on file.
NPDES GAR366053: inspections, violations and enforcement
NPDES GAR366053 (RIVER VISTA ESTATES- PHASE 4 -LOT- 76): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR366053
NPDES GAR366053: one email when its EPA record changes — $99/month.
Permits near NPDES GAR366053
NPDES GAR366053: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.