NPDES GAR368755 · Clean Water Act
PASSTIME LAKES, PHASE III - LOT 3, GA: NPDES GAR368755 discharge permit, effluent exceedances, inspections, penalties
PASSTIME LAKES, PHASE III - LOT 3, Georgia: General permit coverage GAR368755, held by Christina & Eric Lindsey; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR368755.
Coverages issued nearest GAR368755
- 2013-09-23: 620 DEER HOLLOW TRACE (NICHOLAS DRIVE TRACT LOT 36A), Suwanee: GAR368740, held by CMH Parks, Inc. DBA Chafin Builders
- 2013-09-23: 520 SETTLES BRIDGE COURT (NICHOLAS DRIVE TRACT LOT 38A), Suwanee: GAR368741, held by CMH Parks, Inc. DBA Chafin Builders
- 2013-09-23: LAUREL TRAILS ON THE OCONEE - LOT 3: GAR368750, held by Joseph P. Phelan
- 2013-09-23: SCENIC FALLS OF BRASELTON - LOT A-24: GAR368752, held by Starkon Homes
- 2013-09-23: STERLING ON THE LAKE - LOT 8S, Flowery Branch: GAR368754, held by Harcrest Homes
- 2013-09-23: WILLIAMS DOWNS: GAR368756, held by Mundy Residential, LLC
- 2013-09-23: GARRRISON HILL LOT -1, Roswell: GAR368757, held by South Coast Investors, LLC
- 2013-09-23: HAYNE'S STATION SECTION 7: GAR368761, held by Coel Development Co., Inc.
- 2013-09-23: 1682 VIRGINIA AVENUE, College Park: GAR368762, held by New Homes by Design
- 2013-09-23: 2576 HOWELL MILL ROAD SD LOT -2, Atlanta: GAR368766, held by Jim Chapman Communities, Inc
PASSTIME LAKES, PHASE III - LOT 3 among its neighbors
8 discharge permits are in the Pittman Creek subwatershed (HUC 030701011602); GAR368755 is one.
Other permits in the Pittman Creek subwatershed (HUC 030701011602)
- 380 PITTS CHAPEL ROAD, Covington: GAR39556C, minor, term to 2028-07-31
- BILLY COWAN, Newborn: GAR18B3B4, minor, term to 2028-07-31
- DOGWOOD MEADOWS - LOT 6, Mansfield: GAR365317, minor, term to 2018-07-31
- FARRAR MARKET, Newborn: GAR18B196, minor, term to 2028-07-31
- GPC CARMEL CHURCH 115KV SUBSTATION, Mansfield: GAR2543A5, minor, term to 2028-07-31
- KAUFFMAN TIRE, Lovejoy: GAR143527, minor, term to 2018-07-31
- PASSTIME LAKES - THASE THREE - LOT 2, Newborn: GAR352279, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PASSTIME LAKES, PHASE III - LOT 3 |
|---|---|
| Permittee | Christina & Eric Lindsey |
| NPDES ID | GAR368755 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | GA |
| Subwatershed | Pittman Creek (HUC 030701011602) |
NPDES GAR368755: effluent limits and exceedances
PASSTIME LAKES, PHASE III - LOT 3 (NPDES GAR368755): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR368755: no pollutant row on file.
NPDES GAR368755: inspections, violations and enforcement
NPDES GAR368755 (PASSTIME LAKES, PHASE III - LOT 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR368755
NPDES GAR368755: one email when its EPA record changes — $99/month.
Permits near NPDES GAR368755
NPDES GAR368755: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.