NPDES GAR370685 · Clean Water Act
MILLER'S FERRY LOOP WATER EXTENSION PHASE III, Adairsville, GA: NPDES GAR370685 discharge permit, effluent exceedances, inspections, penalties
MILLER'S FERRY LOOP WATER EXTENSION PHASE III, Adairsville, Georgia: General permit coverage GAR370685, held by City of Calhoun Utilities; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR370685. City of Calhoun Utilities holds 13 permits in Georgia.
Other permits held by City of Calhoun Utilities
- UNION GROVE ROAD AT I-75 WATER AND SEWER LINE RELOCATION, Calhoun: GAR234877, issued 2013-09-23
- S.R. 156/HARRIS BEAMER ROAD 8 WATER LINE REPLACEMENT, Calhoun: GAR236252, issued 2013-09-23
- S.R. 136 AT I-75 WATER LINE RELOCATION, Resaca: GAR236556, issued 2013-09-24
- S.R. 156 AT INTERSTATE 75 WATER AND SEWER LINE RELOCATIONS, Calhoun: GAR246695, issued 2013-09-23
- S.R. 53 12 WATER TRANSMISSION MAIN, Calhoun: GAR247509, issued 2013-09-23
- TWO INCH GALVANIZED WATERLINE REPLACEMENT - NIKE/DAVIS/TERRIER/VIKING DRIVES, Calhoun: GAR248095, issued 2013-09-23
- SOUTH CALHOUN BY-PASS AT SR 53 PROPOSED 8 DIP WATER RELOCATION & 8 PVC SEWER F, Calhoun: GAR248212, issued 2013-09-23
- SOUTH CALHOUN BY-PASS AT OAK GROVE ROAD PROPOSED 8 DIP WATER RELOCATION, Calhoun: GAR248213, issued 2013-09-23
- MILLER'S FERRY LOOP WATER EXTENSION HWY 41 SEGMENT, Calhoun: GAR248236, issued 2013-09-23
- MILLER'S FERRY LOOP WATER EXTENSION PHASE II, Adairsville: GAR248338, issued 2013-09-23
Coverages issued nearest GAR370685
- 2013-09-23: PROMENADE AT THE SQUARE FKA WYNHAVEN APARTMENTS (DEMOLITION), Marietta: GAR370679, held by Lennar Georgia, Inc.
- 2013-09-23: THE FALLS @ CASCADE LOT -166, Atlanta: GAR370680, held by B. K Residential
- 2013-09-23: THE FALLS @ CASCADE LOT -168, Atlanta: GAR370681, held by Meritage Homes of Georgia
- 2013-09-23: THE FALLS @ CASCADE LOT 169, Atlanta: GAR370682, held by Meritage Homes of Georgia
- 2013-09-23: THE FALLS @CASCADE LOT 172, Atlanta: GAR370684, held by B.K. Residential
- 2013-09-23: THE FALLS @ CASCADE LOT 173, Na: GAR370686, held by B. K Residential
- 2013-09-23: THE FALLS @ CASCADE LOT 174, Atlanta: GAR370687, held by B. K Residential
- 2013-09-23: THE HERITAGE AT KENNESAW MOUNTAIN UNIT II PHASE 2 LOT 61, Kennesaw: GAR370688, held by Kerley Family Homes
- 2013-09-23: THE HERITAGE AT KENNESAW MOUNTAIN UNIT II PHASE 2 LOT 55, Kennesaw: GAR370689, held by Kerley Family Homes
- 2013-09-23: THE HERITAGE AT KENNESAW MOUNTAIN UNIT II PHASE 2 LOT 53, Kennesaw: GAR370690, held by Kerley Family Homes
MILLER'S FERRY LOOP WATER EXTENSION PHASE III among its neighbors
11 discharge permits are in the Robbins Creek-Oostanaula River subwatershed (HUC 031501030205); GAR370685 is one.
Other permits in the Robbins Creek-Oostanaula River subwatershed (HUC 031501030205)
- BRIAN GROGAN - 3910 ROLAND HAYES PARKWAY, Calhoun: GAR153347, minor, term to 2018-07-31
- PI 0005317 GORDON, INTERSECTION IMPROVEMENTS INSTALLATION OF RCUT ON SR 53 AT BR, Plainville: GAR2542BC, minor, term to 2028-07-31
- RIVERSIDE SUBDIVISION LOT 15, Unknown: GAR363938, minor, term to 2018-07-31
- RIVERSIDE SUBDIVISION LOT 4, Unknown: GAR363956, minor, term to 2018-07-31
- RIVERSIDE SUBDIVISION LOT 5, Unknown: GAR363958, minor, term to 2018-07-31
- RIVERSIDE SUBDIVISION LOT 6, Unknown: GAR363963, minor, term to 2018-07-31
- RIVERSIDE SUBDIVISION LOT 94, Unknown: GAR363951, minor, term to 2018-07-31
- RIVERSIDE/WESTWOOD SUBDIVISION LOT # 7, Unknown: GAR353877, minor, term to 2018-07-31
- ROCK CREEK RIDGE PHASE 2, Calhoun: GAR385F43, minor, term to 2018-07-31
- TOBY FARMS CHICKEN HOUSES, Calhoun: GAR147593, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | MILLER'S FERRY LOOP WATER EXTENSION PHASE III |
|---|---|
| Permittee | City of Calhoun Utilities |
| NPDES ID | GAR370685 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | Adairsville, GA 30103 |
| Subwatershed | Robbins Creek-Oostanaula River (HUC 031501030205) |
NPDES GAR370685: effluent limits and exceedances
MILLER'S FERRY LOOP WATER EXTENSION PHASE III (NPDES GAR370685): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR370685: no pollutant row on file.
NPDES GAR370685: inspections, violations and enforcement
NPDES GAR370685 (MILLER'S FERRY LOOP WATER EXTENSION PHASE III): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR370685
NPDES GAR370685: one email when its EPA record changes — $99/month.
Permits near NPDES GAR370685
NPDES GAR370685: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.