NPDES GAR371273 · Clean Water Act
BALLENTINE POINTE PHASE 2 LOT 325, GA: NPDES GAR371273 discharge permit, effluent exceedances, inspections, penalties
BALLENTINE POINTE PHASE 2 LOT 325, Georgia: General permit coverage GAR371273, held by Smith Douglas Communities Gwinnett, LLC; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR371273. Smith Douglas Communities Gwinnett, LLC holds 96 permits in Georgia.
Other permits held by Smith Douglas Communities Gwinnett, LLC
- BALLENTINE POINTE SOCCER FIELD, Woodstock: GAR148816, issued 2013-09-23
- BALLENTINE POINTE PHASE 2 LOT 282: GAR350015, issued 2013-09-23
- PALISADES LOTS 1,4-6,15-27,40-41,43,45-46,68-69,194-196,201-207,219-219,229-236,: GAR350061, issued 2013-09-23
- RAGSDALE SUBDIVISION - SECONDARY, Woodstock: GAR350528, issued 2013-09-23
- BALLENTINE POINTE PHASE 2 LOTS 260-276, 277-282: GAR350530, issued 2013-09-23
- WATERS EDGE AT RIVER PARK - ALL LOTS, Woodstock: GAR350551, issued 2013-09-23
- THE COTTAGES AT CASSVILLE COMMONS, Woodstock: GAR353843, issued 2013-09-23
- AMBERLEIGH - PHASE THREE - LOTS 197 - 227, Gainesville: GAR354875, issued 2013-09-23
- BALLENTINE POINTE PHASE 2 LOTS 1-2, 70-71: GAR355899, issued 2013-09-23
- THE VILLAGE AT LAKE NORTON LOTS 1,4-10,27-39,42-48,50-51,53,55,56,72: GAR356125, issued 2013-09-23
Coverages issued nearest GAR371273
- 2013-09-23: LEGEND OAKS LOT -33: GAR371267, held by Jefferson Homes, Inc
- 2013-09-23: BRADFORD PLACE LOT 1: GAR371268, held by Daniel Wise
- 2013-09-23: WADE ORR TRACT SD, Flowery Branch: GAR371269, held by Prime Interest, Inc.
- 2013-09-23: DEL WEBB LAKE OCONEE-SECOND ENTRANCE PARCEL 2 AND PARCEL 5: GAR371271, held by Pulte Grouop
- 2013-09-23: BALLENTINE POINTE PHASE 2 LOT 68: GAR371272, held by Smith Douglas Communities Gwinnett, LLC
- 2013-09-23: RIDGE MILL LOTS 69-74, Acworth: GAR371274, held by Craftmark Towns, LLC
- 2013-09-23: SANE - TIMBERLAND SUBDIVISION LOT 39: GAR371275, held by Jerry Sane
- 2013-09-23: NATUREWALK AT SEVEN HILLS UNIT 3 PHASE 5A PHASE 1 LOTS 575-578, 588-593, 955-973: GAR371276, held by Greystone Power Corporation
- 2013-09-23: RIDGE MILL LOTS 261-264, Acworth: GAR371277, held by Craftmark Towns, LLC
- 2013-09-23: SANE - TIMBERLANDS SUBDIVISION LOT 4: GAR371279, held by Jerry Sane
BALLENTINE POINTE PHASE 2 LOT 325 among its neighbors
458 discharge permits are in the Morning Creek subwatershed (HUC 031300050103); GAR371273 is one.
Other permits in the Morning Creek subwatershed (HUC 031300050103)
- 150 OAK TERRACE, Fayetteville: GAR396817, minor, term to 2028-07-31
- 165 GADSON, Fayetteville: GAR18B2F6, minor, term to 2028-07-31
- 165 GADSON DRIVE, Fayetteville: GAR3966FC, minor, term to 2028-07-31
- 175 GADSON DRIVE, Fayetteville: GAR39677A, minor, term to 2028-07-31
- 185 GADSON DR, Fayetteville: GAR18B300, minor, term to 2028-07-31
- 185 GADSON DR, Fayetteville: GAR3966FD, minor, term to 2028-07-31
- 2532 BOLTON ROAD R.M. CLAYTON, Atlanta: GAR152059, minor, term to 2018-07-31
- A1 FOOD MART, Fayetteville: GAR18AF32, minor, term to 2025-01-31
- ADC FAYETTEVILLE, LLC HWY 85 N FAYETTEVILLE, GA, Fayetteville: GAR395F98, minor, term to 2025-01-31
- AIRPORT WEST DISTRIBUTION CENTER 600, College Park: GAR18B68A, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BALLENTINE POINTE PHASE 2 LOT 325 |
|---|---|
| Permittee | Smith Douglas Communities Gwinnett, LLC |
| NPDES ID | GAR371273 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | GA |
| Subwatershed | Morning Creek (HUC 031300050103) |
NPDES GAR371273: effluent limits and exceedances
BALLENTINE POINTE PHASE 2 LOT 325 (NPDES GAR371273): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR371273: no pollutant row on file.
NPDES GAR371273: inspections, violations and enforcement
NPDES GAR371273 (BALLENTINE POINTE PHASE 2 LOT 325): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR371273
NPDES GAR371273: one email when its EPA record changes — $99/month.
Permits near NPDES GAR371273
NPDES GAR371273: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.