NPDES GAR372997 · Clean Water Act
JONES MILL PHASE 2 - LOT 19B, GA: NPDES GAR372997 discharge permit, effluent exceedances, inspections, penalties
JONES MILL PHASE 2 - LOT 19B, Georgia: General permit coverage GAR372997, held by JR Homes of Alabama; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR372997. JR Homes of Alabama holds 27 permits in Georgia.
Other permits held by JR Homes of Alabama
- MAGNOLIA PLANTATION - LOT 27B: GAR353243, issued 2013-09-23
- MAGNOLIA PLANTATION - LOT 28B: GAR353244, issued 2013-09-23
- INDIAN SPRINGS PHASE 3A - LOT 38, Grovetown: GAR361919, issued 2013-09-23
- JONES MILL PHASE 2 - LOT 18: GAR363229, issued 2013-09-23
- JONES MILL PHASE 2 - LOT 17: GAR363231, issued 2013-09-23
- JONES MILL PHASE 2 - LOT 16: GAR363232, issued 2013-09-23
- JONES MILL PHASE 2 - LOT 15: GAR363235, issued 2013-09-23
- JONES MILL PHASE 2 - LOT 14: GAR363237, issued 2013-09-23
- JONES MILL PHASE 2 - LOT 13: GAR363238, issued 2013-09-23
- JONES MILL PHASE 2 - LOT 11: GAR363240, issued 2013-09-23
Coverages issued nearest GAR372997
- 2013-09-23: CREEKSIDE WEST PHASE 3, Hahira: GAR372992, held by Daylon Brown Const., Inc.
- 2013-09-23: SHANNON LAKES LOT 130,131,132,133A: GAR372993, held by DR Horton- Crown LLC
- 2013-09-23: THE PARKS AT CEDAR GROVE PHASE 5 - LOT 51 & 52, Fairburn: GAR372994, held by DR Horton Atlanta
- 2013-09-23: THE PARKS AT CEDAR GROVE PHASE 5 - LOT 53 & 54, Fairburn: GAR372995, held by DR Horton Atlanta
- 2013-09-23: SHANNON LAKES LOT 118,119 A: GAR372996, held by DR Horton- Crown LLC
- 2013-09-23: THE PARKS AT CEDAR GROVE PHASE 5 - LOT 55, Fairburn: GAR372998, held by DR Horton Atlanta
- 2013-09-23: SHANNON LAKES LOT 93-96 A: GAR372999, held by DR Horton-Crown LLC
- 2013-09-23: THE PARKS AT CEDAR GROVE PHASE 5 - LOT 56, Fairburn: GAR373000, held by DR Horton Atlanta
- 2013-09-23: THE ENCLAVE AT BRANDYWINE MODEL LOT: GAR373001
- 2013-09-23: THE PARKS AT CEDAR GROVE PHASE 5 - LOT 57, Fairburn: GAR373002, held by DR Horton Atlanta
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | JONES MILL PHASE 2 - LOT 19B |
|---|---|
| Permittee | JR Homes of Alabama |
| NPDES ID | GAR372997 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | GA |
NPDES GAR372997: effluent limits and exceedances
JONES MILL PHASE 2 - LOT 19B (NPDES GAR372997): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR372997: no pollutant row on file.
NPDES GAR372997: inspections, violations and enforcement
NPDES GAR372997 (JONES MILL PHASE 2 - LOT 19B): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR372997
NPDES GAR372997: one email when its EPA record changes — $99/month.
Permits near NPDES GAR372997
NPDES GAR372997: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.