Velarion Records
Free: one email when NPDES GAR373978 changes. Unsubscribe any time.

NPDES GAR373978 · Clean Water Act

ST. JOSEPH'S - PHASE 1 LOT 49-54, GA: NPDES GAR373978 discharge permit, effluent exceedances, inspections, penalties

ST. JOSEPH'S - PHASE 1 LOT 49-54, Georgia: General permit coverage GAR373978; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.

Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR373978.

Coverages issued nearest GAR373978

What stands out

  • Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityST. JOSEPH'S - PHASE 1 LOT 49-54
PermitteeUNK
NPDES IDGAR373978
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedSeptember 23, 2013
ExpiresJuly 31, 2018
AddressGA

NPDES GAR373978: effluent limits and exceedances

ST. JOSEPH'S - PHASE 1 LOT 49-54 (NPDES GAR373978): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES GAR373978: no pollutant row on file.

NPDES GAR373978: inspections, violations and enforcement

NPDES GAR373978 (ST. JOSEPH'S - PHASE 1 LOT 49-54): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES GAR373978

NPDES GAR373978: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES GAR373978

NPDES GAR373978: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.