NPDES GAR374445 · Clean Water Act
REGENCY PARK PHASE 3 LOTS 50-112 & 170-199, Hiram, GA: NPDES GAR374445 discharge permit, effluent exceedances, inspections, penalties
REGENCY PARK PHASE 3 LOTS 50-112 & 170-199, Hiram, Georgia: General permit coverage GAR374445, held by Greystone Power Corporation; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018; Power and Communication Line and Related Structures Construction.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR374445. Greystone Power Corporation holds 8 permits in Georgia.
Other permits held by Greystone Power Corporation
- FLINT HILL SUBDIVISION PHASE 2 LOTS 5-39 & 72-76: GAR368776, issued 2013-09-23
- NATUREWALK AT SEVEN HILLS UNIT 3 PHASE 5A PHASE 1 LOTS 575-578, 588-593, 955-973: GAR371276, issued 2013-09-23
- SEVEN HILLS UNIT M LOTS 65-126: GAR371337, issued 2013-09-23
- ANDERSON PARK SOUTH - ALL LOTS, Austell: GAR376364, issued 2013-09-23
- ANDERSON PARK NORTH - ALL LOTS, Austell: GAR376371, issued 2013-09-23
- WALTON RESERVE PLACE UNITS 2 & 3 - ALL LOTS: GAR376373, issued 2013-09-23
- POD A UNIT 1 PHASE 3 LAKES AT CEDAR GROVE LOTS 1-52, N/A: GAR382827, issued 2013-09-23
Coverages issued nearest GAR374445
- 2013-09-23: THURNWOOD PARK LOT #16, N/A: GAR374439, held by Excel Captital Construction LLC
- 2013-09-23: LAKESIDE PRESERVE LOT 246 (FULTON), East Point: GAR374440, held by B.K. Residential
- 2013-09-23: THURNWOOD PARK S/D (AKA) VILLAGE AT OLD NATIONAL LOT- 17, N/A: GAR374442, held by Excel Captial Consturction LLC
- 2013-09-23: THURNWOOD PARK S/D (AKA) VILLAGE AT OLD LOT - 29, N/A: GAR374443, held by Excel Captital Consstruction LLC
- 2013-09-23: LAKESIDE PRESERVE LOT 248 (FULTON), East Point: GAR374444, held by Meritage Homes of Georgia
- 2013-09-23: GRENELEFE PARK - LOT 39, Grovetown: GAR374446, held by Burgh Construction LLC
- 2013-09-23: THURNWOOD PARK S/D (AKA) VILLAGE AT OLD NATIONAL LOT - 30, N/A: GAR374447, held by Excel Captial Construction LLC
- 2013-09-23: THURNWOOD PARK S/D (AKA) VILLAGE AT OLD LOT - 33, N/A: GAR374449, held by Excel Captial Construction LLC
- 2013-09-23: LAKESIDE PRESERVE LOT 249 (FULTON), East Point: GAR374451, held by Meritage Homes of Georgia
- 2013-09-23: THURNWOOD PARK S/D (AKA) VILLAGE AT OLD NATIONAL LOT -35, N/A: GAR374452, held by Excel Captital Construction LLC
Other permits in Hiram
- 50 VIRGIE BALLENTINE DRIVE, Hiram: GAR153C6F, minor, term to 2018-07-31
- 69 DOGWOOD, Hiram: GAR18B1AB, minor, term to 2028-07-31
- 72 HUNT STREET, Hiram: GAR18C0F4, minor, term to 2028-07-31
- ALSOBROOK'S RECYCLING, Hiram: GAIS12802, minor, term to 2017-05-31
- ASHLEY POINTE SUBDIVISION LOT 13, Hiram: GAR369631, minor, term to 2018-07-31
- ASHLEY POINTE SUBDIVISION LOTS 10-12, Hiram: GAR383042, minor, term to 2018-07-31
- ASHLEY POINTE SUBDIVISION LOTS 5-8, Hiram: GAR369627, minor, term to 2018-07-31
- BALLENTINE POINT PHASE 2 LOT 34, Hiram: GAR365386, minor, term to 2018-07-31
- BALLENTINE POINT PHASE 2 LOTS 47-56, 285-289, 297-311, Hiram: GAR356903, minor, term to 2018-07-31
- BALLENTINE POINTE PHASE 2, Hiram: GAR357113, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,997 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | REGENCY PARK PHASE 3 LOTS 50-112 & 170-199 |
|---|---|
| Permittee | Greystone Power Corporation |
| NPDES ID | GAR374445 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | Hiram, GA |
| NAICS | 237130 – Power and Communication Line and Related Structures Construction |
| SIC | 1623 – Water, Sewer, And Utility Lines |
NPDES GAR374445: effluent limits and exceedances
REGENCY PARK PHASE 3 LOTS 50-112 & 170-199 (NPDES GAR374445): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR374445: no pollutant row on file.
NPDES GAR374445: inspections, violations and enforcement
NPDES GAR374445 (REGENCY PARK PHASE 3 LOTS 50-112 & 170-199): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR374445
NPDES GAR374445: one email when its EPA record changes — $99/month.
Permits near NPDES GAR374445
NPDES GAR374445: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.