NPDES GAR375314 · Clean Water Act
BALLENTINE POINTE PHASE 2 LOT 315, GA: NPDES GAR375314 discharge permit, effluent exceedances, inspections, penalties
BALLENTINE POINTE PHASE 2 LOT 315, Georgia: General permit coverage GAR375314, held by Smith Douglas Homes, LLC; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR375314. Smith Douglas Homes, LLC holds 206 permits in Georgia.
Other permits held by Smith Douglas Homes, LLC
- WINGFOOT PARK LOTS 1 & 254, Cartersville: GAR358029, issued 2013-09-23
- WINGFOOT PARK LOTS 112-113, & 26, Cartersville: GAR358052, issued 2013-09-23
- WINGFOOT PARK LOT 171, Cartersville: GAR363335, issued 2013-09-23
- WINGFOOT PARK LOT 170, Cartersville: GAR363336, issued 2013-09-23
- WINGFOOT PARK LOT 169, Cartersville: GAR363337, issued 2013-09-23
- WINGFOOT PARK LOT 168, Cartersville: GAR363338, issued 2013-09-23
- WINGFOOT PARK LOT 167, Cartersville: GAR363340, issued 2013-09-23
- WINGFOOT PARK LOT 166, Cartersville: GAR363341, issued 2013-09-23
- WINGFOOT PARK LOT 165, Cartersville: GAR363342, issued 2013-09-23
- WINGFOOT PARK LOT 164, Cartersville: GAR363343, issued 2013-09-23
Coverages issued nearest GAR375314
- 2013-09-23: EUCHEE LAKE - LOT 63, Grovetown: GAR375309, held by Keystone Homes
- 2013-09-23: WHITE OAK VALLEY LOT 9, Aragon: GAR375310, held by Smith Douglas Homes
- 2013-09-23: EUCHEE LAKE - LOT 64, Grovetown: GAR375311, held by Keystone Homes
- 2013-09-23: AVALON 7000 (A TRACT OF AVALON PHASE 2), Alpharetta: GAR375312, held by North American Properties
- 2013-09-23: LAKESIDE PRESERVE LOT 299 (FULTON), East Point: GAR375313, held by Meritage Homes of Georgia
- 2013-09-23: LAKESIDE PRESERVE LOT 301 (FULTON), East Point: GAR375315, held by Meritage Homes of Georgia
- 2013-09-23: THE DEL MAR CLUB LOT 102, Dacula: GAR375316, held by DR Horton- Crown LLC
- 2013-09-23: AVALON 8000 (A TRACT OF AVALON PHASE 2): GAR375317, held by HICO Avalon, LLC
- 2013-09-23: EUCHEE LAKE - LOT 65, Grovetown: GAR375318, held by Keystone Homes
- 2013-09-23: EUCHEE LAKE - LOT 66, Grovetown: GAR375319, held by Keystone Homes
BALLENTINE POINTE PHASE 2 LOT 315 among its neighbors
458 discharge permits are in the Morning Creek subwatershed (HUC 031300050103); GAR375314 is one.
Other permits in the Morning Creek subwatershed (HUC 031300050103)
- 150 OAK TERRACE, Fayetteville: GAR396817, minor, term to 2028-07-31
- 165 GADSON, Fayetteville: GAR18B2F6, minor, term to 2028-07-31
- 165 GADSON DRIVE, Fayetteville: GAR3966FC, minor, term to 2028-07-31
- 175 GADSON DRIVE, Fayetteville: GAR39677A, minor, term to 2028-07-31
- 185 GADSON DR, Fayetteville: GAR18B300, minor, term to 2028-07-31
- 185 GADSON DR, Fayetteville: GAR3966FD, minor, term to 2028-07-31
- 2532 BOLTON ROAD R.M. CLAYTON, Atlanta: GAR152059, minor, term to 2018-07-31
- A1 FOOD MART, Fayetteville: GAR18AF32, minor, term to 2025-01-31
- ADC FAYETTEVILLE, LLC HWY 85 N FAYETTEVILLE, GA, Fayetteville: GAR395F98, minor, term to 2025-01-31
- AIRPORT WEST DISTRIBUTION CENTER 600, College Park: GAR18B68A, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BALLENTINE POINTE PHASE 2 LOT 315 |
|---|---|
| Permittee | Smith Douglas Homes, LLC |
| NPDES ID | GAR375314 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | GA |
| Subwatershed | Morning Creek (HUC 031300050103) |
NPDES GAR375314: effluent limits and exceedances
BALLENTINE POINTE PHASE 2 LOT 315 (NPDES GAR375314): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR375314: no pollutant row on file.
NPDES GAR375314: inspections, violations and enforcement
NPDES GAR375314 (BALLENTINE POINTE PHASE 2 LOT 315): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR375314
NPDES GAR375314: one email when its EPA record changes — $99/month.
Permits near NPDES GAR375314
NPDES GAR375314: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.