NPDES GAR378949 · Clean Water Act
AWTRY CHURCH AT THE POINT LOT 2, Acworth, GA: NPDES GAR378949 discharge permit, effluent exceedances, inspections, penalties
AWTRY CHURCH AT THE POINT LOT 2, Acworth, Georgia: General permit coverage GAR378949, held by Morton & Sheri Brante; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR378949.
Coverages issued nearest GAR378949
- 2013-09-23: THE ORCHARD LOT 26: GAR378944, held by Trevor Larisay
- 2013-09-23: HILLTOP AT SOUTHERN MEADOWS LOT 17: GAR378945, held by Recon Builders, LLC
- 2013-09-23: SILVER CREEK LOT 164: GAR378946, held by Bobo Construction Co.
- 2013-09-23: SILVER CREEK LOT 165: GAR378947, held by Bobo Construction Co.
- 2013-09-23: SILVER CREEK LOT 174: GAR378948, held by Bobo Construction Co.
- 2013-09-23: SYLVAN HEIGHTS LOT 20 (1276 RONNIE DRIVE), Marietta: GAR378950, held by DMD Engineering and Construction, Inc.
- 2013-09-23: IVEY MEADOWS LOTS 92, 98, 104, 105, 111, & 112, Dallas: GAR378951, held by DR Horton Atlanta
- 2013-09-23: IVEY MEADOWS LOTS 127, 129-133, 135, & 136, Dallas: GAR378952, held by DR Horton Atlanta
- 2013-09-23: OAKS AT POWERS FERRY (TOWNHOMES) BUILDING 23 LOTS 113-118, Marietta: GAR378953, held by Oaks at Powers Ferry VDL LLC
- 2013-09-23: 359 EVENING MIST DRIVE (BENTWATER LOT C20): GAR378954, held by Rosewood Builder Group
AWTRY CHURCH AT THE POINT LOT 2 among its neighbors
19 discharge permits are in the Allatoona Creek-Lake Allatoona subwatershed (HUC 031501040904); GAR378949 is one.
Other permits in the Allatoona Creek-Lake Allatoona subwatershed (HUC 031501040904)
- 46 WATERSIDE, Emerson: GAR396723, minor, term to 2028-07-31
- ACE HARDWARE, Acworth: GAR18B0F1, minor, term to 2028-07-31
- ACWORTH LIBERTY HILL CEMETERY EXPANSION, Acworth: GAR2543EB, minor, term to 2028-07-31
- ALENDER RESIDENCE LOT 14 ARROW MOUNTAIN DR, Unknown: GAR356394, minor, term to 2018-07-31
- ALLATOONA LANDING MARINA RESORT (ALLATOONA CAMPGROUND WPCP), Cartersville: GAL022616, minor, term to 2030-12-31
- ASHLEY PARK - CREAOLA 230 KV (CHARLES BOX OUT), N/A: GAR2541F9, minor, term to 2028-07-31
- CEDARCREST CHURCH- PHASE II BUILDING EXPANSION, Acworth: GAR18BACE, minor, term to 2028-07-31
- EDGEWATER DRIVE (WATERSIDE LOT 28), Unknown: GAR362726, minor, term to 2018-07-31
- HALL RESIDENCE - VILLAGE AT WATERSIDE LOT 98, Cartersville: GAR385255, minor, term to 2018-07-31
- LOT 30 MARK & DIANE CLAYTON, Cartersville: GAR356698, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | AWTRY CHURCH AT THE POINT LOT 2 |
|---|---|
| Permittee | Morton & Sheri Brante |
| NPDES ID | GAR378949 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | Acworth, GA 30101 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Allatoona Creek-Lake Allatoona (HUC 031501040904) |
NPDES GAR378949: effluent limits and exceedances
AWTRY CHURCH AT THE POINT LOT 2 (NPDES GAR378949): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR378949: no pollutant row on file.
NPDES GAR378949: inspections, violations and enforcement
NPDES GAR378949 (AWTRY CHURCH AT THE POINT LOT 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR378949
NPDES GAR378949: one email when its EPA record changes — $99/month.
Permits near NPDES GAR378949
NPDES GAR378949: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.