Clean Water Act discharge permit · NPDES GAR382209
TALLULAH LANDING PHASE II, GA: NPDES GAR382209 discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
TALLULAH LANDING PHASE II, held by Tallulah Landing POA, holds NPDES permit GAR382209. EPA’s file records it issued September 23, 2013 and expiring July 31, 2018. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for TALLULAH LANDING PHASE II: its NPDES ID, its permit type and status, its dates, its address, Georgia. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES GAR382209.
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,997 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | TALLULAH LANDING PHASE II |
|---|---|
| Permittee as filed | Tallulah Landing POA |
| NPDES ID | GAR382209 |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expiration date | July 31, 2018 |
| Address | GA 11111 |
| Subwatershed | Nottely Lake (HUC 060200020508) |
| NAICS | 236115 – New Single-Family Housing Construction [except For-Sale Builders] |
| SIC | 1521 – Single-Family Housing Construction |
Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES GAR382209.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES GAR382209.
Inspections
EPA’s inspection file holds no inspection for NPDES GAR382209.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES GAR382209.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, GAR382209.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID GAR382209 there.
TALLULAH LANDING PHASE II, Georgia: Coverage under a general permit GAR382209, held by Tallulah Landing POA; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued September 23, 2013, term to July 31, 2018; New Single-Family Housing Construction [except For-Sale Builders].
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR382209. Tallulah Landing POA holds 2 permits in Georgia.
Other permits held by Tallulah Landing POA
- TALLULAH LANDING: GAR382207, issued 2013-09-23
Coverages issued nearest GAR382209
- 2013-09-23: LEGACY POINTE PHASE I AND II LOTS 124, 125, & 283, Dallas: GAR382202, held by DR Horton, Inc.
- 2013-09-23: LEGACY POINTE PHASE I AND II LOTS 5, 48, 304, & 305, Dallas: GAR382204, held by DR Horton, Inc.
- 2013-09-23: THE SANCTUARY LOT 60: GAR382205, held by Justin Stinnett
- 2013-09-23: TALLULAH LANDING: GAR382207, held by Tallulah Landing POA
- 2013-09-23: CUSCOWILLOWE SITE - CUS012, Eatonton: GAR382208, held by Cuscowilla
- 2013-09-23: SPEC HOUSE - P05109, Madison: GAR382211, held by Spec - New Leaf Homes, LLC
- 2013-09-23: SPEC HOUSE - P05105, Madison: GAR382212, held by Spec - New Leaf Homes, LLC
- 2013-09-23: SPEC HOUSE - P05103, Madison: GAR382213, held by Spec - New Leaf Homes, LLC
- 2013-09-23: HADLEY ESTATES (FKA OLD ATLANTA ROAD TRACT), Cumming: GAR382214, held by Taylor Morrison of Georgia, LLC
- 2013-09-23: CARRUTH LAKE ESTATES PHASE II, Cumming: GAR382215, held by DR Horton, Inc.
TALLULAH LANDING PHASE II among its neighbors
91 discharge permits are in the Nottely Lake subwatershed (HUC 060200020508); GAR382209 is one.
Other permits in the Nottely Lake subwatershed (HUC 060200020508)
- 1300 @ LAKE NOTTELY, Blairsville: GAR396988, minor, term to 2028-07-31
- 1300 @ LAKE NOTTELY LOT 27, Blairsville: GAR396A1D, minor, term to 2028-07-31
- 1300 LOT 27 BERRY, Blairsville: GAR396A40, minor, term to 2028-07-31
- 1300 LOT 9 & 10, Blairsville: GAR3962ED, minor, term to 2025-01-31
- 1300 LOTS 389 & 390, Blairsville: GAR395CB6, minor, term to 2025-01-31
- 1300, THE OVERLOOK (JONES)(JESSICA POOLE), Blairsville: GAR397130, minor, term to 2028-07-31
- 17-039 RESTAURANT DEPOT, Unknown: GAR153693, minor, term to 2018-07-31
- 863 KNOLLWOOD DRIVE, Winder: GAR18BD10, minor, term to 2028-07-31
- ARROWOOD POINTE LOT 67, Blairsville: GAR3948FF, minor, term to 2028-07-31
- AUTUMN HILLS LOT 12, Blairsville: GAR364067, minor, term to 2018-07-31
Nearby on the register
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The page covers NPDES permit GAR382209 for TALLULAH LANDING PHASE II, held by Tallulah Landing POA, a construction stormwater permit with administratively continued status, issued September 23, 2013 and expiring July 31, 2018. The register lists 0 pollutants under a numeric limit and 0 pollutants with an effluent exceedance, and no effluent or single-event violations are recorded for this permit.