NPDES GAR385DB3 · Clean Water Act
LAKE IRIS - UNIT IV (A) PHASE 12 - LOTS: 9-14, Mcdonough, GA: NPDES GAR385DB3 discharge permit, effluent exceedances, inspections, penalties
LAKE IRIS - UNIT IV (A) PHASE 12 - LOTS: 9-14, Mcdonough, Georgia: General permit coverage GAR385DB3, held by DR Horton Inc; Construction stormwater; Administratively continued; issued September 24, 2013, term to July 31, 2018; New Single-Family Housing Construction [except For-Sale Builders].
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 27,822 were issued before GAR385DB3. DR Horton Inc holds 83 permits in Georgia.
Other permits held by DR Horton Inc
- PRESERVE AT HARBINS RIDGE (AMENITY AREA) AKA EQUESTRIA: GAR151785, issued 2013-09-23
- LAKE IRIS LOT -82, Mcdonough: GAR248685, issued 2013-09-23
- GREYSTONE MANOR (FKA FARRIS PLANTATION), Mcdonough: GAR347376, issued 2013-09-23
- ELYSIAN FIELDS, Fayetteville: GAR359715, issued 2013-09-23
- PROVIDENCE WALK LOTS 1 THROUGH 21, 28 THROUGH 70, 134 THROUGH 139, Canton: GAR360572, issued 2013-09-23
- CEDAR MILL LOT 109, 123, Dallas: GAR363596, issued 2013-09-23
- LAUREL MIST PHASE 2, Loganville: GAR368276, issued 2013-09-23
- PANHANDLE VALLEY ESTATES LOT - 31-34,35-38,39-42,43-46,47,51,69-72,100: GAR369172, issued 2013-09-23
- PANHANDLE VALLEY ESTATES LOT 5-8, 9, 13,14, 1617-19, 20-23, 24-26, 27-30: GAR369177, issued 2013-09-23
- SAWGRASS ESTATES PHASE 3 LOT 252-254,255-258: GAR369182, issued 2013-09-23
Coverages issued nearest GAR385DB3
- 2013-09-24: RIVER'S STATION LOT 78, Atlanta: GAR385D37, held by Silverstone Residential, LLC
- 2013-09-24: MITCHELL / SOUTHERN HOME DESIGN - CUS032, Eatonton: GAR385D66, held by Southern Home Design
- 2013-09-24: FITZGERALD / SOUTHERN HOME DESIGN - CUS014, Eatonton: GAR385D67, held by Southern Home Design
- 2013-09-24: RIVER ISLAND SECTION 3 PHASE 2A - LOT 5T, Evans: GAR385DAA, held by Patrick Huguenin
- 2013-09-24: LAKE IRIS - UNIT IV (A) PHASE 11 LOTS 1-8, Na: GAR385DAF, held by DR Horton Inc
- 2013-09-24: LAKE IRIS - UNIT IVPHASE 13:LOTS17-19,21-22, Na: GAR385DB5, held by DR Horton Inc
- 2013-09-24: MCCONNELL GREEN (FKA LOST MOUNTAIN) LOT 28, Powder Springs: GAR385DBF, held by Windsong Properties
- 2013-09-24: LAKE IRIS - UNIT IV PHASE 8 - LOTS: 37-40,93-97, Mcdonough: GAR385DC4, held by DR Horton Inc
- 2013-09-24: LAKE IRIS - UNIT IV PHASE 6; LOTS 42-48, 85, Mcdonough: GAR385DC6, held by DR Horton Inc
- 2013-09-24: LAKE IRIS - UNIT IV PHASE 9, LOTS 86-92, Na: GAR385DC8, held by DR Horton Inc
LAKE IRIS - UNIT IV (A) PHASE 12 - LOTS: 9-14 among its neighbors
67 discharge permits are in the Upper Tussahaw Creek subwatershed (HUC 030701030901); GAR385DB3 is one.
Other permits in the Upper Tussahaw Creek subwatershed (HUC 030701030901)
- 15 PRICE DRIVE WEST, Locust Grove: GAR18B3F3, minor, term to 2028-07-31
- 209 CADES CT, Mcdonough: GAR18C16A, minor, term to 2028-07-31
- CAST LANDING AKA AUTUMN PLANTATION) LOT -14, Mcdonough: GAR3857CA, minor, term to 2018-07-31
- CAST LANDING AKA AUTUMN PLANTATION) LOT -16, Mcdonough: GAR3857CC, minor, term to 2018-07-31
- CASTLEBROOK LOT 18, Unknown: GAR378688, minor, term to 2018-07-31
- COTTAGES AT DAWSONVILLE, Dawsonville: GAR18AFD5, minor, term to 2025-01-31
- CROSSROADS MARKET, Mcdonough: GAR18B4AF, minor, term to 2028-07-31
- FLAT ROCK HILLS PHASE 3, Lithonia: GAR347364, minor, term to 2018-07-31
- GEODIS #1104, Mcdonough: GAIS14711, minor, term to 2027-05-31
- GEODIS #1117, Mcdonough: GAIS14612, minor, term to 2027-05-31
What stands out
- Its term runs 4 years and 310 days, September 24, 2013 to July 31, 2018; the term ended 2,997 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LAKE IRIS - UNIT IV (A) PHASE 12 - LOTS: 9-14 |
|---|---|
| Permittee | DR Horton Inc |
| NPDES ID | GAR385DB3 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 24, 2013 |
| Expires | July 31, 2018 |
| Address | Mcdonough, GA 30252 |
| Subwatershed | Upper Tussahaw Creek (HUC 030701030901) |
| NAICS | 236115 – New Single-Family Housing Construction [except For-Sale Builders] |
| SIC | 1521 – Single-Family Housing Construction |
NPDES GAR385DB3: effluent limits and exceedances
LAKE IRIS - UNIT IV (A) PHASE 12 - LOTS: 9-14 (NPDES GAR385DB3): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR385DB3: no pollutant row on file.
NPDES GAR385DB3: inspections, violations and enforcement
NPDES GAR385DB3 (LAKE IRIS - UNIT IV (A) PHASE 12 - LOTS: 9-14): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR385DB3
NPDES GAR385DB3: one email when its EPA record changes — $99/month.
Permits near NPDES GAR385DB3
NPDES GAR385DB3: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.