NPDES GAR395AF9 · Clean Water Act
THE VILLAGES AT OAKSHIRE PHASE 2 : LOT 6, Atlanta, GA: NPDES GAR395AF9 discharge permit, effluent exceedances, inspections, penalties
THE VILLAGES AT OAKSHIRE PHASE 2 : LOT 6, Atlanta, Georgia: General permit coverage GAR395AF9, held by DR Horton Inc; Construction stormwater; Effective; issued August 1, 2018, term to January 31, 2025; New Single-Family Housing Construction [except For-Sale Builders].
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 30,681 were issued before GAR395AF9. DR Horton Inc holds 83 permits in Georgia.
Other permits held by DR Horton Inc
- PRESERVE AT HARBINS RIDGE (AMENITY AREA) AKA EQUESTRIA: GAR151785, issued 2013-09-23
- LAKE IRIS LOT -82, Mcdonough: GAR248685, issued 2013-09-23
- GREYSTONE MANOR (FKA FARRIS PLANTATION), Mcdonough: GAR347376, issued 2013-09-23
- ELYSIAN FIELDS, Fayetteville: GAR359715, issued 2013-09-23
- PROVIDENCE WALK LOTS 1 THROUGH 21, 28 THROUGH 70, 134 THROUGH 139, Canton: GAR360572, issued 2013-09-23
- CEDAR MILL LOT 109, 123, Dallas: GAR363596, issued 2013-09-23
- LAUREL MIST PHASE 2, Loganville: GAR368276, issued 2013-09-23
- PANHANDLE VALLEY ESTATES LOT - 31-34,35-38,39-42,43-46,47,51,69-72,100: GAR369172, issued 2013-09-23
- PANHANDLE VALLEY ESTATES LOT 5-8, 9, 13,14, 1617-19, 20-23, 24-26, 27-30: GAR369177, issued 2013-09-23
- SAWGRASS ESTATES PHASE 3 LOT 252-254,255-258: GAR369182, issued 2013-09-23
Coverages issued nearest GAR395AF9
- 2018-08-01: WALNUT CREEK SUBDIVISION PHASE 1 LOT G12, Pendergrass: GAR395A97, held by Adams Homes AEC LLC
- 2018-08-01: WALNUT CREEK SUBDIVISION PHASE 1 LOT G13, Pendergrass: GAR395A99, held by Adams Homes AEC LLC
- 2018-08-01: WALNUT CREEK SUBDIVISION PHASE 1 LOT H1, Pendergrass: GAR395A9A, held by Adams Homes AEC LLC
- 2018-08-01: HANCOCK MEADOW SUBDIVISION LOT 31, Demorest: GAR395A9B, held by Adams Homes
- 2018-08-01: HIGHLAND SPRINGS SUBDIVISION, Augusta: GAR395AEE, held by Beech Island Development Company
- 2018-08-01: AUBURN STATION, TOWNHOME EAST, Auburn: GAR395AFA, held by Yost Communities at Auburn Station, LLC
- 2018-08-01: HOLLIDAY PASS LOT 69, Griffin: GAR395AFE, held by Adams Homes AEC, LLC
- 2018-08-01: JACK CREEK PHASE 1, Covington: GAR395B03, held by BUYSIDE CAPITAL ADVISORS
- 2018-08-01: RESIDENCES AT GATEWAY TOWNHOMES, Winder: GAR395B11, held by Lennar Georgia, LLC
- 2018-08-01: FAIRVIEW CHASE - LOTS 56-60, 64-69, Covington: GAR395B13, held by Reliant Homes GA, LLC
THE VILLAGES AT OAKSHIRE PHASE 2 : LOT 6 among its neighbors
74 discharge permits are in the Headwaters South River subwatershed (HUC 030701030101); GAR395AF9 is one.
Other permits in the Headwaters South River subwatershed (HUC 030701030101)
- 2461 METRO PKWY C-STORE, Atlanta: GAR151970, minor, term to 2018-07-31
- 3335 DOGWOOD, Hapeville: GAR18B2CE, minor, term to 2028-07-31
- 352 UNIVERSITY AVENUE REDEVELOPMENT, Atlanta: GAR153AE3, minor, term to 2018-07-31
- 3559 JONESBORO ROAD APARTMENTS, Atlanta: GAR18B180, minor, term to 2028-07-31
- ATLANTA BELTLINE - SOUTHSIDE TRAIL (SEGMENT 2/3), Atlanta: GAR24939B, minor, term to 2028-07-31
- ATLANTA FIRE STATION #30, Atlanta: GAR18B262, minor, term to 2028-07-31
- ATLANTA METROPOLITAN STATE COLLEGE SITEWORK FOR STUDENT SERVICES AND SUCCESS CEN, Atlanta: GAR151910, minor, term to 2018-07-31
- ATLANTA METROPOLITIAN STATE COLLEGE INFRASTUCTURE RENOVATIONS AND UPGRADES, Atlanta: GAR151144, minor, term to 2018-07-31
- AXON ATLANTA, East Point: GAIS14633, minor, term to 2027-05-31
- BALLARD ROAD, Forest Park: GAR149426, minor, term to 2018-07-31
What stands out
- Its term runs 6 years and 183 days, August 1, 2018 to January 31, 2025; the term ended 621 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE VILLAGES AT OAKSHIRE PHASE 2 : LOT 6 |
|---|---|
| Permittee | DR Horton Inc |
| NPDES ID | GAR395AF9 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2018 |
| Expires | January 31, 2025 |
| Address | Atlanta, GA 30354 |
| Subwatershed | Headwaters South River (HUC 030701030101) |
| NAICS | 236115 – New Single-Family Housing Construction [except For-Sale Builders] |
| SIC | 1521 – Single-Family Housing Construction |
NPDES GAR395AF9: effluent limits and exceedances
THE VILLAGES AT OAKSHIRE PHASE 2 : LOT 6 (NPDES GAR395AF9): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR395AF9: no pollutant row on file.
NPDES GAR395AF9: inspections, violations and enforcement
NPDES GAR395AF9 (THE VILLAGES AT OAKSHIRE PHASE 2 : LOT 6): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR395AF9
NPDES GAR395AF9: one email when its EPA record changes — $99/month.
Permits near NPDES GAR395AF9
NPDES GAR395AF9: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.