Velarion Records
Free: one email when NPDES GAR395BF8 changes. Unsubscribe any time.

NPDES GAR395BF8 · Clean Water Act

BROWNE LOT 2 TALLULAH LANDING, Blairsville, GA: NPDES GAR395BF8 discharge permit, effluent exceedances, inspections, penalties

BROWNE LOT 2 TALLULAH LANDING, Blairsville, Georgia: General permit coverage GAR395BF8, held by Janet Browne; Construction stormwater; Effective; issued August 1, 2018, term to January 31, 2025.

Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 30,681 were issued before GAR395BF8.

Coverages issued nearest GAR395BF8

BROWNE LOT 2 TALLULAH LANDING among its neighbors

91 discharge permits are in the Nottely Lake subwatershed (HUC 060200020508); GAR395BF8 is one.

Other permits in the Nottely Lake subwatershed (HUC 060200020508)

What stands out

  • Its term runs 6 years and 183 days, August 1, 2018 to January 31, 2025; the term ended 592 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityBROWNE LOT 2 TALLULAH LANDING
PermitteeJanet Browne
NPDES IDGAR395BF8
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedAugust 1, 2018
ExpiresJanuary 31, 2025
AddressBlairsville, GA 30512
SubwatershedNottely Lake (HUC 060200020508)

NPDES GAR395BF8: effluent limits and exceedances

BROWNE LOT 2 TALLULAH LANDING (NPDES GAR395BF8): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES GAR395BF8: no pollutant row on file.

NPDES GAR395BF8: inspections, violations and enforcement

NPDES GAR395BF8 (BROWNE LOT 2 TALLULAH LANDING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES GAR395BF8

NPDES GAR395BF8: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES GAR395BF8

NPDES GAR395BF8: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.