NPDES GAR396AAE · Clean Water Act
CAMDEN NORTH, PHASE 2 S/D, LOTS 18, 23, 37, 40 & 41, 177, 197, 136, 124 & 120 CA, Macon, GA: NPDES GAR396AAE discharge permit, effluent exceedances, inspections, penalties
CAMDEN NORTH, PHASE 2 S/D, LOTS 18, 23, 37, 40 & 41, 177, 197, 136, 124 & 120 CA, Macon, Georgia: General permit coverage GAR396AAE, held by Three Oaks Construction & Development Inc; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR396AAE.
Coverages issued nearest GAR396AAE
- 2023-08-01: LOT 18-BLUFF VIEW TRACE, Rocky Face: GAR396AA8, held by Teresa Sharp
- 2023-08-01: WILDWOOD EXEMPTION PLAT, Suwanee: GAR396AA9, held by MHB Lending LLC
- 2023-08-01: THE RESERVE AT MOSSY CREEK LOT 28, Cleveland: GAR396AAA, held by CLAY AND LINDSEY PILGRIM
- 2023-08-01: K&H HOMES, Greensboro: GAR396AAB, held by Houston Feaster
- 2023-08-01: TOBEE CREEK S/D PHASE 2, LOT 79, 219 LITTLE HICKORY DR, MBC, Lizella: GAR396AAC, held by Utsav Patel
- 2023-08-01: SPRINGS AT WALTON, Monroe: GAR396AAF, held by My Home Communities
- 2023-08-01: CURRAHEE CLUB PHASE 1 - LOT D11, Toccoa: GAR396AB0, held by Fortis Design & Build LLC
- 2023-08-01: 203 TUXEDO CIRCLE RIVER FOREST, Forsyth: GAR396AB1, held by Carter Lumer of the South Inc
- 2023-08-01: LOT 514 - CUMBERLAND HARBOUR, St. Marys: GAR396AB2, held by Terry Stover Const.
- 2023-08-01: LOT 2 - CUMBERLAND HARBOUR, St. Marys: GAR396AB3, held by Terry Stover Const.
CAMDEN NORTH, PHASE 2 S/D, LOTS 18, 23, 37, 40 & 41, 177, 197, 136, 124 & 120 CA among its neighbors
113 discharge permits are in the Rocky Creek subwatershed (HUC 030701031406); GAR396AAE is one.
Other permits in the Rocky Creek subwatershed (HUC 030701031406)
- 1797 TUCKER RD, Macon: GAR18B280, minor, term to 2028-07-31
- 3800 WOODFIELD DRIVE - CLEAR & GRADE, Macon: GAR18B516, minor, term to 2028-07-31
- 4706 RALEY RD , MBC, S/D DEVELOPMENT, Macon: GAR397531, minor, term to 2028-07-31
- A NEW GYMNASIUM FOR NORTHWOODS ACADEMY, Macon: GAR18BF90, minor, term to 2028-07-31
- AIR COMPRESSOR SALES, Macon: GAR148220, minor, term to 2018-07-31
- ALLENTOWN PHASE 4 & 5, Macon: GAR18B88A, minor, term to 2028-07-31
- APPLEBEE'S, Macon: GAR149370, minor, term to 2018-07-31
- BARNES FERRY, Macon: GAR18BC4B, minor, term to 2028-07-31
- BARRINGTON HALL LOTS 16-19, Macon: GAR396DC7, minor, term to 2028-07-31
- BARRINGTON HALL LOTS 32-35, Macon: GAR396DCB, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CAMDEN NORTH, PHASE 2 S/D, LOTS 18, 23, 37, 40 & 41, 177, 197, 136, 124 & 120 CA |
|---|---|
| Permittee | Three Oaks Construction & Development Inc |
| NPDES ID | GAR396AAE |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Macon, GA 31210 |
| Subwatershed | Rocky Creek (HUC 030701031406) |
NPDES GAR396AAE: effluent limits and exceedances
CAMDEN NORTH, PHASE 2 S/D, LOTS 18, 23, 37, 40 & 41, 177, 197, 136, 124 & 120 CA (NPDES GAR396AAE): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR396AAE: no pollutant row on file.
NPDES GAR396AAE: inspections, violations and enforcement
NPDES GAR396AAE (CAMDEN NORTH, PHASE 2 S/D, LOTS 18, 23, 37, 40 & 41, 177, 197, 136, 124 & 120 CA): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR396AAE
NPDES GAR396AAE: one email when its EPA record changes — $99/month.
Permits near NPDES GAR396AAE
NPDES GAR396AAE: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.