NPDES GAR396B3B · Clean Water Act
REXFORD SUBDIVISION PHASE 2, Statesboro, GA: NPDES GAR396B3B discharge permit, effluent exceedances, inspections, penalties
REXFORD SUBDIVISION PHASE 2, Statesboro, Georgia: General permit coverage GAR396B3B, held by Robert Bell; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR396B3B. Robert Bell holds 3 permits in Georgia.
Other permits held by Robert Bell
- RIVER BLUFF SUBDIVISION PH 7-9, Ellabell: GAR395231, issued 2023-08-01
- SILVER LEAF SD, Statesboro: GAR39617D, issued 2018-08-01
Coverages issued nearest GAR396B3B
- 2023-08-01: STEEPLECHASE S/D LOT 55, Hoschton: GAR396B36, held by S.S HOMEBUILDERS LLC
- 2023-08-01: HILLS AT QUEENS GAP LOT 7 & 8, Blairsville: GAR396B37, held by Cale Crawford
- 2023-08-01: ASCOTT AKA BEAVER DAM TOWNHOMES, Hoschton: GAR396B38, held by Clayton Properties Group, Inc DBA Chafin Builders
- 2023-08-01: SUWANEE AVENUE TRACT, Suwanee: GAR396B39, held by Kennedy Family Homes
- 2023-08-01: HARMONY BAY LOT 24, Eatonton: GAR396B3A, held by Marvin E Foster
- 2023-08-01: LANSUM ESTATES, Cumming: GAR396B3D, held by Ashton Atlanta Residential, LLC
- 2023-08-01: 1740 CATO RD, Greensboro: GAR396B43, held by Heather Black
- 2023-08-01: GRAND OAK VILLAGE, Valdosta: GAR396B44, held by Trevor Shaw
- 2023-08-01: DOBBS LANDING, Covington: GAR396B45, held by Brian Walker
- 2023-08-01: SOUTHLAND STATION SUBDIVISION DEVELOPMENT, Warner Robins: GAR396B46, held by Dylan Wingate
REXFORD SUBDIVISION PHASE 2 among its neighbors
7 discharge permits are in the Brady Branch-Ogeechee River subwatershed (HUC 030602020306); GAR396B3B is one.
Other permits in the Brady Branch-Ogeechee River subwatershed (HUC 030602020306)
- CITY OF SWAINSBORO SEWERAGE SYSTEM IMPROVEMENTS,ADDITION TO THE WATER POLLUTION, Swainsboro: GAR129243, minor, term to 2018-07-31
- CITY OF SWAINSBORO SEWERAGE SYSTEM IMPROVEMENTS,PROJECT NO. 280523.005, Swainsboro: GAR229242, minor, term to 2018-07-31
- FULGHUM FIBRES, INC., OLIVER MILL, Sylvania: GAIS04351, minor, term to 2017-05-31
- KING AMERICA FINISHING, INC. - LOBLOLLY FACILITY, Statesboro: GAIS12994, minor, term to 2017-05-31
- SWAINSBORO-EMANUEL COUNTY AIRPORT TERMINAL BUILDING, Swainsboro: GAR145341, minor, term to 2018-07-31
- YAM GRANDY STREAM & WETLAND MITIGATION BANK, Swainsboro: GAR143081, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | REXFORD SUBDIVISION PHASE 2 |
|---|---|
| Permittee | Robert Bell |
| NPDES ID | GAR396B3B |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Statesboro, GA 30458 |
| Subwatershed | Brady Branch-Ogeechee River (HUC 030602020306) |
NPDES GAR396B3B: effluent limits and exceedances
REXFORD SUBDIVISION PHASE 2 (NPDES GAR396B3B): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR396B3B: no pollutant row on file.
NPDES GAR396B3B: inspections, violations and enforcement
NPDES GAR396B3B (REXFORD SUBDIVISION PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR396B3B
NPDES GAR396B3B: one email when its EPA record changes — $99/month.
Permits near NPDES GAR396B3B
NPDES GAR396B3B: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.