NPDES GAR3973BB · Clean Water Act
MAJESTIC OAKS PHASE 2B, Brunswick, GA: NPDES GAR3973BB discharge permit, effluent exceedances, inspections, penalties
MAJESTIC OAKS PHASE 2B, Brunswick, Georgia: General permit coverage GAR3973BB, held by SIMCOE INVESTMENTS GROUP, LLC; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR3973BB.
Coverages issued nearest GAR3973BB
- 2023-08-01: CORNERSTONE WEST, Fayetteville: GAR3973B6, held by Charles Ogletree
- 2023-08-01: COOK ROAD LOT 5, Oxford: GAR3973B7, held by Raymundo Jaimes Porras
- 2023-08-01: SPIRITS CROSSING, Augusta: GAR3973B8, held by 33H 96SFR LLC AND 33H RAYS LLC
- 2023-08-01: TRADITIONS OF BRASELTON LOT 26U, Jefferson: GAR3973B9, held by Justin Brantley
- 2023-08-01: MAGNOLIA VILLAS LOT 45, Cornelia: GAR3973BA, held by Adams Homes North
- 2023-08-01: BARRINGTON PLACE LOT 8, Macon: GAR3973BD, held by Adams Homes
- 2023-08-01: DEER PATH ESTATES, Blue Ridge: GAR3973BE, held by Ken Franklin
- 2023-08-01: FOREST LAKES PHASE 13, Savannah: GAR3973BF, held by Godley Station West, LLC
- 2023-08-01: BARRINGTON PLACE LOT 7, Macon: GAR3973C1, held by Adams Homes
- 2023-08-01: 6533 LAKE ALAPAHA, Naylor: GAR3973C2, held by dinkins
MAJESTIC OAKS PHASE 2B among its neighbors
108 discharge permits are in the Turtle River-South Brunswick River subwatershed (HUC 030702030201); GAR3973BB is one.
Other permits in the Turtle River-South Brunswick River subwatershed (HUC 030702030201)
- 132 CRISPEN BOULEVARD, Brunswick: GAR18B0BD, minor, term to 2028-07-31
- 275 HARRY DRIGGERS, Brunswick: GAR18BCE2, minor, term to 2028-07-31
- 5150 BLYTHE ISLAND HWY, Brunswick: GAR18B2EB, minor, term to 2028-07-31
- 5225 HABERSHAM STREET, Brunswick: GAR18B4C2, minor, term to 2028-07-31
- 7512 BLYTHE ISLAND HIGHWAY, Brunswick: GAR18BF11, minor, term to 2028-07-31
- A PORTION OF MILLENNIUM CENTER PHASE II (GLYNN COUNTY), Brunswick: GAR369479, minor, term to 2018-07-31
- ACADEMY CREEK WPCP, Brunswick: GAIS12232, minor, term to 2017-05-31
- ALPINE COURT, Brunswick: GAR18AFF7, minor, term to 2025-01-31
- ALTAMA AMENITY CENTER, Brunswick: GAR397676, minor, term to 2028-07-31
- ALTAMA PHASE ONE MASTER INFRASTRUCTURE, Brunswick: GAR2541EF, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | MAJESTIC OAKS PHASE 2B |
|---|---|
| Permittee | SIMCOE INVESTMENTS GROUP, LLC |
| NPDES ID | GAR3973BB |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Brunswick, GA 31523 |
| Subwatershed | Turtle River-South Brunswick River (HUC 030702030201) |
NPDES GAR3973BB: effluent limits and exceedances
MAJESTIC OAKS PHASE 2B (NPDES GAR3973BB): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR3973BB: no pollutant row on file.
NPDES GAR3973BB: inspections, violations and enforcement
NPDES GAR3973BB (MAJESTIC OAKS PHASE 2B): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR3973BB
NPDES GAR3973BB: one email when its EPA record changes — $99/month.
Permits near NPDES GAR3973BB
NPDES GAR3973BB: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.