NPDES GAR397407 · Clean Water Act
6375 MOSELEY DIXON RD, MBC, ESPCP & SEPTIC, Macon, GA: NPDES GAR397407 discharge permit, effluent exceedances, inspections, penalties
6375 MOSELEY DIXON RD, MBC, ESPCP & SEPTIC, Macon, Georgia: General permit coverage GAR397407, held by Matt & Joy Reno; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR397407.
Coverages issued nearest GAR397407
- 2023-08-01: 129 GREY EAGLE DRIVE, Waleska: GAR397402, held by Steven McKenzie
- 2023-08-01: ANDERSON, Covington: GAR397403, held by Tim Anderson
- 2023-08-01: 126 134 162 FORT WAYNE DRIVE, Waleska: GAR397404, held by Steven McKenzie
- 2023-08-01: TREETOPS SUBDIVISION LOT 1, Macon: GAR397405, held by Adams Homes
- 2023-08-01: GA HWY 138, Conyers: GAR397406, held by Rodrikus Duggans
- 2023-08-01: PLEASANT MEADOWS, Blairsville: GAR397408, held by DAVID HARRIS
- 2023-08-01: ANNIE'S ARBOR, Ellijay: GAR397409, held by Carl Jones
- 2023-08-01: SOUTHWIND VILLAGES PHASE 4, Evans: GAR39740A, held by Edgar Hughston Builder, Inc.
- 2023-08-01: RESIDENTIAL PLANNED UNIT DEVELOPMENT, Moultrie: GAR39740B, held by J&J Rental Properties of Moultrie, LLC
- 2023-08-01: WINDRUSH SUBDIVISION, Midland: GAR39740C, held by Edgar Hughston Builder, INC.
6375 MOSELEY DIXON RD, MBC, ESPCP & SEPTIC among its neighbors
65 discharge permits are in the Lake Tobesofkee subwatershed (HUC 030701031405); GAR397407 is one.
Other permits in the Lake Tobesofkee subwatershed (HUC 030701031405)
- 1638 BONNER GILBERT RD, MBC, ESPCP, Macon: GAR3973FD, minor, term to 2028-07-31
- 504 BLUEWATER BAY DR, Macon: GAR18BCDA, minor, term to 2028-07-31
- ARROWHEAD BY THE LAKE, PHASE 3, Macon: GAR397429, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 21, Macon: GAR395295, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 22, Macon: GAR395296, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 23, Macon: GAR39679D, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 24, Macon: GAR39679E, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 25, Macon: GAR395570, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 26, Macon: GAR39679F, minor, term to 2028-07-31
- BARRINGTON PLACE LOT 27, Macon: GAR3967A0, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 6375 MOSELEY DIXON RD, MBC, ESPCP & SEPTIC |
|---|---|
| Permittee | Matt & Joy Reno |
| NPDES ID | GAR397407 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Macon, GA 31220 |
| Subwatershed | Lake Tobesofkee (HUC 030701031405) |
NPDES GAR397407: effluent limits and exceedances
6375 MOSELEY DIXON RD, MBC, ESPCP & SEPTIC (NPDES GAR397407): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR397407: no pollutant row on file.
NPDES GAR397407: inspections, violations and enforcement
NPDES GAR397407 (6375 MOSELEY DIXON RD, MBC, ESPCP & SEPTIC): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR397407
NPDES GAR397407: one email when its EPA record changes — $99/month.
Permits near NPDES GAR397407
NPDES GAR397407: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.