Clean Water Act discharge permit · NPDES GAR39764C
EDGEWATER AT NEW HAMPSTEAD - PHASE 3B, Savannah, GA: NPDES GAR39764C discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
EDGEWATER AT NEW HAMPSTEAD - PHASE 3B, held by Lennar Carolinas, LLC, holds NPDES permit GAR39764C. EPA’s file records it issued August 1, 2023 and expiring July 31, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for EDGEWATER AT NEW HAMPSTEAD - PHASE 3B: its NPDES ID, its permit type and status, its dates, its address in Savannah, Georgia. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES GAR39764C.
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | EDGEWATER AT NEW HAMPSTEAD - PHASE 3B |
|---|---|
| Permittee as filed | Lennar Carolinas, LLC |
| NPDES ID | GAR39764C |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expiration date | July 31, 2028 |
| Address | Savannah, GA 31419 |
| Subwatershed | Hardin Canal-Little Ogeechee River (HUC 030602040201) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES GAR39764C.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES GAR39764C.
Inspections
EPA’s inspection file holds no inspection for NPDES GAR39764C.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES GAR39764C.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, GAR39764C.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID GAR39764C there.
EDGEWATER AT NEW HAMPSTEAD - PHASE 3B, Savannah, Georgia: Coverage under a general permit GAR39764C, held by Lennar Carolinas, LLC; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR39764C.
Coverages issued nearest GAR39764C
- 2023-08-01: BALDWIN PLACE - LOT 16, Grovetown: GAR397646, held by Petersburg Properties Inc
- 2023-08-01: ELLIOTT ROAD, Mcdonough: GAR397647, held by DRB HOMES
- 2023-08-01: NATUREWALK UNIT 3 PH 5A-3 - LOT 1173, Dallas: GAR397648, held by ARTISAN COMMUNITIES
- 2023-08-01: ALDINGTON, Mcdonough: GAR397649, held by DRB HOMES
- 2023-08-01: LOT 98, Carrollton: GAR39764B, held by ROBERT GALLUP
- 2023-08-01: EMERALD OAKS, PHASE 3 AND 4, Centerville: GAR39764D, held by Not Applicable
- 2023-08-01: TAYLOR, KAYTLYNE, Madison: GAR39764E, held by Kaytlyne Taylor
- 2023-08-01: PENAGOS, Madison: GAR39764F, held by Antoine Bourdeaux
- 2023-08-01: WINDSONG S/D, LOT 45, 525 WINDSONG DR, JONES CO, ESPCP, Macon: GAR397650, held by Daniel Faulk
- 2023-08-01: RIVER FOREST PHASE 2 LOT C-18, Forsyth: GAR397651, held by New Leaf Homes
EDGEWATER AT NEW HAMPSTEAD - PHASE 3B among its neighbors
146 discharge permits are in the Hardin Canal-Little Ogeechee River subwatershed (HUC 030602040201); GAR39764C is one.
Other permits in the Hardin Canal-Little Ogeechee River subwatershed (HUC 030602040201)
- ALEXANDER CREEK FARMS, Rincon: GAR254427, minor, term to 2028-07-31
- ASSISTED LIVING AND MEMORY CARE FACILITY (CHATHAM COUNTY), Pooler: GAR152070, minor, term to 2018-07-31
- BARBARA RAWLINGS, Bloomingdale: GAR18BB2B, minor, term to 2028-07-31
- BARBARA RAWLINGS, Bloomingdale: GAR18BF00, minor, term to 2028-07-31
- BERKELEY WALK - PH II (CHATHAM COUNTY), Pooler: GAR148929, minor, term to 2018-07-31
- BERKELEY WALK - PH III, Pooler: GAR384EE3, minor, term to 2018-07-31
- BIG OGEECHEE TO LITTLE OGEECHEE, Savannah: GAR25445A, minor, term to 2028-07-31
- CITY OF POOLER, Pooler: GAL047066, minor, term to 2025-12-31
- CITY OF POOLER MS4, Pooler: GAS000209, minor, term to 2022-04-11
- CLEAR LAKE VISTA, Pooler: GAR18B5C5, minor, term to 2028-07-31
Nearby on the register
- Discharge permits in Savannah
- Every permit record in Savannah, A to Z
- Discharge permits in Georgia
- Every permit record in Georgia, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
Among the 371 storm water construction permits in Savannah on EPA's NPDES register, 0.0% have a violation on file. EDGEWATER AT NEW HAMPSTEAD - PHASE 3B is in the Hardin Canal-Little Ogeechee River subwatershed (HUC 030602040201), which lists 146 NPDES permits; counting this permit, 66.6% of the Savannah storm water construction permits were issued before it.